| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q00571300 ↗ | 44-09 BROADWAY QUEENS | Alteration | Signed-off | 08/19/2021 | 10/13/2021 | Design BRETT SHOAF, PE Contractor COMMANDO CONTRACTING CORP | Remove wood deck above first story roof at second floor in rear yard. Remove free-standing steel and wood frame sheds on ground in rear yar… |
| X00364229 ↗ | 417 EAST 162 STREET BRONX | Alteration | Signed-off | 06/30/2020 | 07/01/2020 | Design BRETT SHOAF, PE Contractor WINWAY DEVELOPMENT LLC | Install bracing and shoring to stabilize damaged rubble foundation wall on exposed exterior face, to allow for safe wall repair. |
| Person | Filings | Most recent |
|---|---|---|
| LOUIS TURCOTTE | 1 | 08/05/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| BRETT SHOAF, PE | 2 | 08/19/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| COMMANDO CONTRACTING CORP | 1 | 08/19/2021 |
| WINWAY DEVELOPMENT LLC | 1 | 06/30/2020 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q00571300 ↗ | 44-09 BROADWAY QUEENS | Alteration | Signed-off | 08/19/2021 | 10/13/2021 | Design BRETT SHOAF, PE Contractor COMMANDO CONTRACTING CORP | Remove wood deck above first story roof at second floor in rear yard. Remove free-standing steel and wood frame sheds on ground in rear yar… |
| X00364229 ↗ | 417 EAST 162 STREET BRONX | Alteration | Signed-off | 06/30/2020 | 07/01/2020 | Design BRETT SHOAF, PE Contractor WINWAY DEVELOPMENT LLC | Install bracing and shoring to stabilize damaged rubble foundation wall on exposed exterior face, to allow for safe wall repair. |
| Building | Filings | Most Recent |
|---|---|---|
| 44-09 BROADWAY ↗ | 1 | 08/05/2021 |
| 417 EAST 162 STREET ↗ | 1 | 06/29/2020 |