← Back
Filing Representative Firm
MANHATTAN COLLEGE
Expediter
BRONX · 2
2 buildings
3
Total Filings
2
Projects on File
2
Buildings Worked
0
Projects w/ Open Permits
Expediter
Role
Activity
Projects by first filing month2 projects all-time
0112Oct '23 · 1Dec '23 · 1Oct '23Nov '23Dec '23
Portfolio status
Browse projects →
Signed off2100%
By project type
Alteration2
Most active buildings
All buildings →
3825 CORLEAR AVENUEBRONX · latest 03/11/2024
1 projects
4381 POST ROADBRONX · latest 12/14/2023
1 projects
Key relationships
Everyone →
Design firms
Gregory Cowartlatest 04/11/2024
3 filings
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
X00931618 ↗3825 CORLEAR AVENUE
BRONX
AlterationSigned-off10/16/202303/11/2024APPLICATION BEING MADE TO CORRECT DOB RECORDS TO REFLECT BOILER IS LOCATED ON ROOF/GREENHOUSE AND NOT IN BASEMENT. NO CHANGE INMEANS OF EGR…
X00946372 ↗4381 POST ROAD
BRONX
AlterationSigned-off12/01/202312/14/2023Replace two existing atmospheric gas-fired domestic water heaters in-kind with two new atmospheric gas-fired domestic water heaters. Water …
Counts cover all 2 projects (2 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
Gregory Cowart304/11/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
COLLADO ENGINEERING105/03/2024
REVANS DESIGN PE PC110/16/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
CC CONTROLLED PLBG CO.,IN110/16/2023
EVERYDAY MECHANICAL CORP105/03/2024
2 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 2Signed off 2
2 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
X00931618 ↗3825 CORLEAR AVENUE
BRONX
AlterationSigned-off10/16/202303/11/2024APPLICATION BEING MADE TO CORRECT DOB RECORDS TO REFLECT BOILER IS LOCATED ON ROOF/GREENHOUSE AND NOT IN BASEMENT. NO CHANGE INMEANS OF EGR…
X00946372 ↗4381 POST ROAD
BRONX
AlterationSigned-off12/01/202312/14/2023Replace two existing atmospheric gas-fired domestic water heaters in-kind with two new atmospheric gas-fired domestic water heaters. Water …
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
4381 POST ROAD ↗204/11/2024
3825 CORLEAR AVENUE ↗109/08/2023
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/22/2026X00946372-I1 · 4381 POST ROADRequest digital key ↗
08/14/2026X00946372-P1 · 4381 POST ROADRequest digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026X00931618-I1 · 3825 CORLEAR AVENUEOpen ↗
08/22/2026X00946372-I1 · 4381 POST ROADOpen ↗
08/13/2026X00946372-P1 · 4381 POST ROADOpen ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026X00931618-I1 · 3825 CORLEAR AVENUEOpen ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026X00931618-I1 · 3825 CORLEAR AVENUEOpen ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026X00931618-I1 · 3825 CORLEAR AVENUEOpen ↗
08/22/2026X00946372-I1 · 4381 POST ROADOpen ↗
08/13/2026X00946372-P1 · 4381 POST ROADOpen ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00946372-I1 · 4381 POST ROADOpen ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026X00931618-I1 · 3825 CORLEAR AVENUEOpen ↗