| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01395664 ↗ | 475 EAST 57 STREET BROOKLYN | Alteration | Permit Issued | 05/28/2026 | 06/03/2026 | Design PURE POWER ENGINEERING, INC. Contractor NYS ESSENTIAL POWER INC | Installation of PV System on existing rooftop. No changes to Egress or use of occupancy. |
| Person | Filings | Most recent |
|---|---|---|
| SEAN DEPTULA | 1 | 04/30/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| PURE POWER ENGINEERING, INC. | 1 | 05/28/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| NYS ESSENTIAL POWER INC | 1 | 05/28/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| NAZARETH REGIONAL HIGH SCHOOL | 1 | 05/28/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01395664 ↗ | 475 EAST 57 STREET BROOKLYN | Alteration | Permit Issued | 05/28/2026 | 06/03/2026 | Design PURE POWER ENGINEERING, INC. Contractor NYS ESSENTIAL POWER INC | Installation of PV System on existing rooftop. No changes to Egress or use of occupancy. |
| Building | Filings | Most Recent |
|---|---|---|
| 475 EAST 57 STREET ↗ | 1 | 04/30/2026 |