| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01468605 | 1200 VAN NEST AVENUE BRONX | Alteration | Permit Issued | 10/02/2026 | 10/07/2026 | Design SYNC ARCHITECTURE P.C Contractor ACE RENTAL CORP | Temporary tents for college events in the central courtyard. Removed at the end of the programing. No changes to existing structures, use o… |
| X01447750 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 08/19/2026 | 09/10/2026 | Design SUPERSTARS CONTRACTING IN Owner VERSAI LLC Contractor SUPERSTARS CONTRACTING IN Filer REL Engineering PC | IRA FISP Inspection |
| X01434680 | 1200 VAN NEST AVENUE BRONX | Alteration | Signed-off | 07/23/2026 | 07/28/2026 | Design SYNC ARCHITECTURE P.C Contractor ACE RENTAL CORP | Temporary tents for college events in the central courtyard. Removed at the end of the programing. No changes to existing structures, use o… |
| X01287982 | 1200 VAN NEST AVENUE BRONX | Alteration | Signed-off | 09/17/2025 | 12/02/2025 | Design SYNC ARCHITECTURE P.C Contractor ACE RENTAL | Temporary tents for college events in the central courtyard. Removed at the end of the programing. No changes to existing structures, use o… |
| X01061001 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 07/24/2024 | 11/03/2025 | Design GOLDMAN COPELAND ASSOCIATES Contractor BENCHMARK BUILDERS LLC | Herewith filing structural modifications for Albert Einstein College of Medicine - Van Etten non-production lab, surgical skills lab, conf. … |
| X01260270 | 1200 VAN NEST AVENUE BRONX | Alteration | Signed-off | 07/24/2025 | 07/29/2025 | Design SYNC ARCHITECTURE P.C Contractor ACE RENTAL | Temporary tents for college events in the central courtyard. Removed at the end of the programing. No changes to existing structures, use o… |
| Name | Projects together | Most recent |
|---|---|---|
| Goldman Copeland Associates | 6 | 02/03/2026 |
| SYNC Architecture | 4 | 10/02/2026 |
| EES | 3 | 09/22/2022 |
| Jack L. Gordon Architects | 3 | 02/03/2026 |
| St Engineering Services | 3 | 06/13/2022 |
| The Design Alliance | 3 | 04/03/2018 |
| New York Engineering Associates | 2 | 08/26/2024 |
| Reuther Bowen | 2 | 02/03/2026 |
| Albert Einstein College of Medicine | 1 | 06/29/2022 |
| Douglas P. Gonzalez | 1 | 07/24/2024 |
| Joel Phagoo P.E | 1 | 04/23/2018 |
| JWM Group | 1 | 08/29/2019 |
| KZ Engineering | 1 | 01/23/2020 |
| NBBJ Architecture | 1 | 07/24/2024 |
| Pomarico Design Studio Architecture | 1 | 03/06/2023 |
| Royal Engineering | 1 | 12/12/2019 |
| Skyline Access | 1 | 01/02/2025 |
| Superstars Contracting | 1 | 08/19/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Ace Rental | 4 | 10/02/2026 |
| Cannon Mechanical | 4 | 02/03/2026 |
| Herbert Rose | 3 | 04/03/2018 |
| A Plus Plumbing | 2 | 07/24/2024 |
| JRM Construction Management | 2 | 07/24/2024 |
| Lund Fire Products Co | 2 | 08/26/2024 |
| Stamford Tent & Equipment Co | 2 | 01/13/2022 |
| Vanguard Construction and | 2 | 04/19/2021 |
| A + Sprinkler | 1 | 01/18/2024 |
| Arsenal Scaffold | 1 | 01/23/2020 |
| Benchmark Builders | 1 | 02/03/2026 |
| Bluewater Plumbing & Heating | 1 | 02/03/2026 |
| Bondee Enterprises | 1 | 12/22/2020 |
| C & N Contracting | 1 | 12/12/2019 |
| Denko Mechanical | 1 | 06/13/2022 |
| Diker A & V Contracting | 1 | 03/06/2023 |
| Greenway USA | 1 | 10/30/2023 |
| I & S Contracting | 1 | 06/29/2022 |
| Integra Plumbing of N.Y | 1 | 10/30/2023 |
| NY Tent | 1 | 09/22/2022 |
| Plumbing Works | 1 | 02/03/2026 |
| Rockledge Scaffold | 1 | 04/23/2018 |
| Superstars Contracting | 1 | 08/19/2026 |
| William C. Gerakaris P&H | 1 | 12/14/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| Albert Einstein College of Medicine | 13 | 10/02/2026 |
| Montefiore Medical Center - Moses | 3 | 09/22/2022 |
| Yeshiva University | 3 | 06/13/2022 |
| C&N Contracting | 1 | 12/12/2019 |
| J. Giarnella & Sons II | 1 | 04/23/2018 |
| Montefiore Medical Center | 1 | 01/02/2025 |
| Versai | 1 | 08/19/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Municipal Building Consultants | 4 | 10/02/2026 |
| Environmental Engineering Solutions | 3 | 09/22/2022 |
| Outsource Consultants | 2 | 02/03/2026 |
| A1 Expediting Service | 1 | 04/23/2018 |
| Design 2147 | 1 | 07/24/2024 |
| Franklyn Estrella Architect | 1 | 01/12/2018 |
| Integrated | 1 | 06/29/2022 |
| Jack L. Gordon Architects | 1 | 10/30/2023 |
| REL Engineering | 1 | 08/19/2026 |
| Skyline Access | 1 | 01/02/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01468605 | 1200 VAN NEST AVENUE BRONX | Alteration | Permit Issued | 10/02/2026 | 10/07/2026 | Design SYNC ARCHITECTURE P.C Contractor ACE RENTAL CORP | Temporary tents for college events in the central courtyard. Removed at the end of the programing. No changes to existing structures, use o… |
| X01447750 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 08/19/2026 | 09/10/2026 | Design SUPERSTARS CONTRACTING IN Owner VERSAI LLC Contractor SUPERSTARS CONTRACTING IN Filer REL Engineering PC | IRA FISP Inspection |
| X01434680 | 1200 VAN NEST AVENUE BRONX | Alteration | Signed-off | 07/23/2026 | 07/28/2026 | Design SYNC ARCHITECTURE P.C Contractor ACE RENTAL CORP | Temporary tents for college events in the central courtyard. Removed at the end of the programing. No changes to existing structures, use o… |
| X01287982 | 1200 VAN NEST AVENUE BRONX | Alteration | Signed-off | 09/17/2025 | 12/02/2025 | Design SYNC ARCHITECTURE P.C Contractor ACE RENTAL | Temporary tents for college events in the central courtyard. Removed at the end of the programing. No changes to existing structures, use o… |
| X01061001 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 07/24/2024 | 11/03/2025 | Design GOLDMAN COPELAND ASSOCIATES Contractor BENCHMARK BUILDERS LLC | Herewith filing structural modifications for Albert Einstein College of Medicine - Van Etten non-production lab, surgical skills lab, conf. … |
| X01260270 | 1200 VAN NEST AVENUE BRONX | Alteration | Signed-off | 07/24/2025 | 07/29/2025 | Design SYNC ARCHITECTURE P.C Contractor ACE RENTAL | Temporary tents for college events in the central courtyard. Removed at the end of the programing. No changes to existing structures, use o… |
| X00993149 | 1845 EASTCHESTER ROAD BRONX | Alteration | Signed-off | 02/29/2024 | 03/18/2025 | Design NBBJ ARCHITECTURE, PLLC Contractor JRM CONSTRUCTION MGMT LLC Filer DESIGN 2147, LTD | FILING HEREWITH PLUMBING WORK AS PER PLANS IN CONJUNCTION WITH INTERIOR MODIFICATIONS. |
| X01042380 | 1200 VAN NEST AVENUE BRONX | Alteration | Permit Issued | 08/26/2024 | 02/12/2025 | Contractor LUND FIRE PRODUCTS CO INC | REPLACE FIRE PUMP. BLOCK BUILDING. |
| X01042452 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Permit Issued | 08/26/2024 | 02/12/2025 | Contractor LUND FIRE PRODUCTS CO INC | REPLACE FIRE PUMP.IN VAN ETTEN BUILDING. |
| X01162116 | 1825 EASTCHESTER ROAD BRONX | Alteration | Filed — no permit on record | 01/02/2025 | — | Design SKYLINE ACCESS LLC Filer SKYLINE ACCESS | — |
| X01131824 | 1825 EASTCHESTER ROAD BRONX | Alteration | Permit Issued | 10/24/2024 | 11/07/2024 | Contractor STANDARD CONSTRUCTION COR | SUSPENDED SCAFFOLD OUTRIGGER SYSTEM AT 1825 EASTCHESTER ROAD, BRONX FOR FACADE RESTORATION WORK WITH INSPECTIONS. THERE WILL BE NO CHANGE IN… |
| X00973219 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 01/12/2024 | 03/29/2024 | Design GOLDMAN COPELAND ASSOCIATES Contractor JRM CONSTRUCTION MGMT LLC | Herewith filing structural modifications for Albert Einstein College of Medicine, Van Etten Lab Renovation 7th floor. No change in use, egre… |
| X00881161 | 1250 MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 06/02/2023 | 08/22/2023 | Contractor GREENWAY USA | Replace existing lab turrets and associated piping in the same existing approved arrangement. Install new sink on existing rough-ins. Replac… |
| X00822403 | 1825 EASTCHESTER ROAD BRONX | Alteration | Signed-off | 03/06/2023 | 04/06/2023 | Contractor DIKER A & V CONTRACTING C | Montefiore - 3rd Floor Ultrasound - MODIFICATIONS OF PARTITIONS, DOORS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPA… |
| X08001489 ↗ | 1825 EASTCHESTER ROAD BRONX | Alteration | Signed-off | 09/22/2022 | 10/11/2022 | Design EES Contractor NY TENT, LLC | THIS APPLICATION IS BEING FILED FOR ONE TEMPORARY TENTS TO HANDLE THE EMERGENCY OF COVID-19 PANDEMIC (CORONAVIRUS). THE TENTS WILL BE USED F… |
| X00762072 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 06/29/2022 | 07/25/2022 | Contractor ABRAHAM GUTTMAN Filer INTEGRATED | Minor Interior Renovation on part of the 3rd floor B Wing. There is no change in use, egress or occupancy. |
| X00437755 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Permit Issued | 12/14/2020 | 01/26/2022 | Design ST ENGINEERING SERVICES LLP Owner YESHIVA UNIVERSITY Contractor S. TIEGER PLBG. CO., INC | MODIFICATION OF SPRINKLER SYSTEM ON 5TH FLOOR ASPER PLANS FILED HEREWITH. |
| X00658852 ↗ | 1825 EASTCHESTER ROAD BRONX | Alteration | Permit Issued | 01/13/2022 | 01/20/2022 | Design EES Contractor STAMFORD TENT & EQUIP CO | INSTALLATION OF 20' X 16' TEMPORARY TENT OUTSIDE OF BUILDING FOR COVID-19 SCREENING |
| X00654496 ↗ | 1825 EASTCHESTER ROAD BRONX | Alteration | Permit Issued | 01/03/2022 | 01/05/2022 | Design EES Contractor STAMFORD TENT & EQUIP CO | INSTALLATION OF 20' X 32' TEMPORARY TENT FOR COVID-19 OVERFLOW IN THE EMERGENCY DROPOFF LOT |
| X00345397 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 12/14/2020 | 06/21/2021 | Design ST ENGINEERING SERVICES LLP Owner YESHIVA UNIVERSITY Contractor WILLIAM C. GERAKARIS P&H | Plumbing work on 5th floor as per plans filed herewith. |
| X00492019 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Permit Issued | 04/05/2021 | 05/10/2021 | Contractor VANGUARD CONSTRUCTION AND | GENERAL CONSTRUCTION ON 5TH FLOOR AS PER PLANS FILED HEREWITH. |
| X00437798 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Permit Issued | 12/14/2020 | 05/06/2021 | Design ST ENGINEERING SERVICES LLP Owner YESHIVA UNIVERSITY Contractor VANGUARD CONSTRUCTION AND | MECHANICAL WORK ON 5TH FLOOR AS PER PLANS FILED HEREWITH. |
| X00027950 | 1825 EASTCHESTER ROAD BRONX | Alteration | Signed-off | 04/23/2018 | 03/04/2021 | Design JOEL PHAGOO P.E. PLLC Contractor ROCKLEDGE SCAFFOLD CORP | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NY… |
| X00202894 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 08/07/2019 | 08/21/2020 | Design GOLDMAN COPELAND ASSOCIATES Contractor CANNON MECHANICAL INC Filer DESIGN 2147, LTD | Herewith filing modifications to the existing Mechanical System. No change in use, egress or occupancy. |
| X00202920 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 08/07/2019 | 07/01/2020 | Design GOLDMAN COPELAND ASSOCIATES Contractor BONDEE ENTERPRISES INC Filer DESIGN 2147, LTD | HEREWITH FILING A PAA TO MODIFY THE SCHEDULE B OF THE EXISTING PLUMBING SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X00300681 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 01/23/2020 | 03/24/2020 | Design KZ ENGINEERING, P.C Contractor ARSENAL SCAFFOLD INC | Installation of temporary system scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egres… |
| X00279463 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 12/12/2019 | 12/19/2019 | Design ROYAL ENGINEERING, P.C Owner C&N CONTRACTING INC Contractor C N CONTRACTING | INSTALLATION OF TEMPORARY 96' HIGH PIPE SCAFFOLD ORIGINATING (OFF 1st FLOOR TERRACE) FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EG… |
| X00197700 | 1225 MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 08/29/2019 | 10/24/2019 | Design JWM GROUP LLC Contractor CANNON MECHANICAL INC | Installation of new mechanical units (chillers) at the penthouse of core wing of existing building. |
| X00010316 | 1200 VAN NEST AVENUE BRONX | Alteration | Signed-off | 01/12/2018 | 06/06/2018 | Design THE DESIGN ALLIANCE Contractor HERBERT ROSE INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL ALL AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLI… |
| X00010308 | 1845 EASTCHESTER ROAD BRONX | Alteration | Signed-off | 01/12/2018 | 02/20/2018 | Design THE DESIGN ALLIANCE Contractor HERBERT ROSE INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL ALL AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLI… |
| X00010311 | 1250 MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 01/12/2018 | 02/08/2018 | Design THE DESIGN ALLIANCE Contractor HERBERT ROSE INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL ALL AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLI… |
| Building | Filings | Most Recent |
|---|---|---|
| 1200 VAN NEST AVENUE ↗ | 6 | 10/02/2026 |
| 1225 MORRIS PARK AVENUE ↗ | 14 | 08/19/2026 |
| 1825 EASTCHESTER ROAD ↗ | 7 | 01/02/2025 |
| 1845 EASTCHESTER ROAD ↗ | 2 | 07/24/2024 |
| 1250 MORRIS PARK AVENUE ↗ | 2 | 10/30/2023 |