| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01191232 ↗ | 315 WEST 33 STREET MANHATTAN | Alteration | Signed-off | 04/03/2025 | 04/17/2025 | Design NEWTEC ENGINEERING Contractor ARISTA AIR CONDITIONING C | Air conditioning unit replacement on the 4th Floor Level M (MER). No change in use egress and occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| NEWTEC ENGINEERING | 1 | 04/03/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| ARISTA AIR CONDITIONING C | 1 | 04/03/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Brookfield Properties Multifamily | 1 | 04/03/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01191232 ↗ | 315 WEST 33 STREET MANHATTAN | Alteration | Signed-off | 04/03/2025 | 04/17/2025 | Design NEWTEC ENGINEERING Contractor ARISTA AIR CONDITIONING C | Air conditioning unit replacement on the 4th Floor Level M (MER). No change in use egress and occupancy. |
| Building | Filings | Most Recent |
|---|---|---|
| 315 WEST 33 STREET ↗ | 1 | 04/03/2025 |