| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01213453 | 357 CLERMONT AVENUE BROOKLYN | Alteration | Signed-off | 05/12/2025 | 05/22/2025 | Contractor THE LANDTEK GROUP INC Filer GILLMAN CONSULTING INC | Demolition of existing two concrete walls, partial demo of tarmac. Installation of drain loop pipe, drainage stone, asphalt patching and anc… |
| B00717187 | 357 CLERMONT AVENUE BROOKLYN | Alteration | Permit Issued | 04/14/2022 | 09/29/2022 | Contractor PARISH PROPERTY MANAGEMEN | Replacement of existing concrete steps and patio. New brick paver patio and benches. Relocation of statue with new pedestal as shown on draw… |
| B00377238 | 357 CLERMONT AVENUE BROOKLYN | Alteration | Signed-off | 08/13/2020 | 01/23/2021 | Design BRAD E. COHEN, PE Contractor EAST COAST PETROLEUM INC | REPLACE (1) EXISTING LOW PRESSURE BOILER. REINSTALL EXISTING GAS/OIL BURNER. ALL PL WORK UNDER B00381830. NO CHANGE IN USE, EGRESS, OR OCCUP… |
| B00056461 | 357 CLERMONT AVENUE BROOKLYN | Alteration | Permit Issued | 06/26/2018 | 10/30/2018 | Design ROYAL ENGINEERING, P.C Contractor PHOENIX SUTTON STR INC | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPT… |
| B00066476 | 357 CLERMONT AVENUE BROOKLYN | Alteration | Permit Issued | 07/31/2018 | 10/30/2018 | Design ROYAL ENGINEERING, P.C Contractor PHOENIX SUTTON STR INC | INSTALLATION OF TEMPORARY 60' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUP… |
| Name | Projects together | Most recent |
|---|---|---|
| Acheson Doyle Partners Architects | 2 | 05/12/2025 |
| Royal Engineering | 2 | 07/31/2018 |
| Brad E. Cohen, PE | 1 | 08/13/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| Phoenix Sutton STR | 2 | 07/31/2018 |
| East Coast Petroleum | 1 | 08/13/2020 |
| Parish Property Management | 1 | 04/14/2022 |
| The Landtek Group | 1 | 05/12/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Bishop Loughlin Memorial High Schoo | 1 | 05/12/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Gillman Consulting | 1 | 05/12/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01213453 | 357 CLERMONT AVENUE BROOKLYN | Alteration | Signed-off | 05/12/2025 | 05/22/2025 | Contractor THE LANDTEK GROUP INC Filer GILLMAN CONSULTING INC | Demolition of existing two concrete walls, partial demo of tarmac. Installation of drain loop pipe, drainage stone, asphalt patching and anc… |
| B00717187 | 357 CLERMONT AVENUE BROOKLYN | Alteration | Permit Issued | 04/14/2022 | 09/29/2022 | Contractor PARISH PROPERTY MANAGEMEN | Replacement of existing concrete steps and patio. New brick paver patio and benches. Relocation of statue with new pedestal as shown on draw… |
| B00377238 | 357 CLERMONT AVENUE BROOKLYN | Alteration | Signed-off | 08/13/2020 | 01/23/2021 | Design BRAD E. COHEN, PE Contractor EAST COAST PETROLEUM INC | REPLACE (1) EXISTING LOW PRESSURE BOILER. REINSTALL EXISTING GAS/OIL BURNER. ALL PL WORK UNDER B00381830. NO CHANGE IN USE, EGRESS, OR OCCUP… |
| B00056461 | 357 CLERMONT AVENUE BROOKLYN | Alteration | Permit Issued | 06/26/2018 | 10/30/2018 | Design ROYAL ENGINEERING, P.C Contractor PHOENIX SUTTON STR INC | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPT… |
| B00066476 | 357 CLERMONT AVENUE BROOKLYN | Alteration | Permit Issued | 07/31/2018 | 10/30/2018 | Design ROYAL ENGINEERING, P.C Contractor PHOENIX SUTTON STR INC | INSTALLATION OF TEMPORARY 60' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUP… |
| Building | Filings | Most Recent |
|---|---|---|
| 357 CLERMONT AVENUE ↗ | 5 | 05/12/2025 |