| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00554216 ↗ | 828 9 AVENUE MANHATTAN | Alteration | Signed-off | 08/25/2021 | 11/12/2021 | Contractor CHARLES TROIANO | Add steel-framed ADA compliant ramp over existing sidewalk. 34 LF of steel. |
| M00557409 ↗ | 828 9 AVENUE MANHATTAN | Alteration | Signed-off | 08/25/2021 | 11/12/2021 | Design GENSLER Contractor CHARLES TROIANO | A new accessible ramp connecting sidewalk to floor level of existing tenant space. |
| Name | Projects together | Most recent |
|---|---|---|
| GENSLER | 1 | 08/25/2021 |
| THE EIPEL ENGINEERING GROUP, D.P.C. | 1 | 08/25/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| CROSS CONSULTING INC | 2 | 08/25/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00554216 ↗ | 828 9 AVENUE MANHATTAN | Alteration | Signed-off | 08/25/2021 | 11/12/2021 | Contractor CHARLES TROIANO | Add steel-framed ADA compliant ramp over existing sidewalk. 34 LF of steel. |
| M00557409 ↗ | 828 9 AVENUE MANHATTAN | Alteration | Signed-off | 08/25/2021 | 11/12/2021 | Design GENSLER Contractor CHARLES TROIANO | A new accessible ramp connecting sidewalk to floor level of existing tenant space. |
| Building | Filings | Most Recent |
|---|---|---|
| 828 9 AVENUE ↗ | 2 | 08/25/2021 |