| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01181791 ↗ | 1276 FULTON AVENUE BRONX | Alteration | Permit Issued | 04/25/2025 | 03/19/2026 | Contractor BEDROCK MECHANICAL INC | MODIFICATIONS TO THE EXISTING WET SPRINKLER SYSTEM TO ACCOMMODATE THE NEW ARCHITECTURAL BACKGROUND AS INDICATED ON THE PLANS FILED HEREWIITH… |
| X01178537 ↗ | 1650 SELWYN AVENUE BRONX | Alteration | Signed-off | 02/14/2025 | 08/20/2025 | Design AKF ENGINEERS, LLP Contractor TRI-STATE CONTRACTING GRO Filer JULIAN A. GOMEZ | At 1st Floor, Modification of existing ductwork per proposed relocation of neurology clinic from 1st floor Milstein Building. |
| X01131615 ↗ | 1650 GRAND CONCOURSE BRONX | Alteration | Signed-off | 02/14/2025 | 05/05/2025 | Design AKF ENGINEERS, LLP Contractor BRONX COUNTY SHEET METAL Filer JULIAN A. GOMEZ | At 2nd Floor, Ductwork to be revised to serve new Specialty Pharmacy and support spaces. |
| X00882124 ↗ | 1650 GRAND CONCOURSE BRONX | Alteration | Permit Issued | 07/10/2023 | 12/11/2023 | Contractor ALLSTATE SPRINKLER LLC | Modification existing sprinkler system at 2nd floor cafe to relocate & install new heads. No change to use, egress or occupancy. |
| X00749990 ↗ | 1650 GRAND CONCOURSE BRONX | Alteration | Permit Issued | 09/07/2022 | 09/09/2022 | Owner BRONXCARE HEALTH SYSTEM Contractor ALLSTATE SPRINKLER LLC Filer JULIAN A. GOMEZ | Modify and upgrade existing sprinkler system in 4th floor CCU. No change to use, egress or occupancy. |
| X00396514 ↗ | 1650 GRAND CONCOURSE BRONX | Alteration | Signed-off | 04/28/2021 | 01/19/2022 | Owner BRONXCARE HEALTH SYSTEM Contractor EAST COAST PETROLEUM INC Filer JULIAN A. GOMEZ | Removal of four (4) existing #2 oil-fired Fulton high pressure steam boilers and replace with two (2) new medium pressure steam boilers and… |
| Name | Projects together | Most recent |
|---|---|---|
| RAND ENGINEERING & ARCHITECTURE | 5 | 12/17/2025 |
| AKF ENGINEERS, LLP | 2 | 02/14/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| ALLSTATE SPRINKLER LLC | 2 | 07/10/2023 |
| BEDROCK MECHANICAL INC | 1 | 12/17/2025 |
| BRONX COUNTY SHEET METAL | 1 | 02/14/2025 |
| EAST COAST PETROLEUM INC | 1 | 04/28/2021 |
| TRI-STATE CONTRACTING GRO | 1 | 02/14/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| BRONX CARE - HEALTH SYSTEM | 5 | 12/17/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| JULIAN A. GOMEZ | 3 | 02/14/2025 |
| OUTSOURCE CONSULTANTS, INC. | 1 | 12/17/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01181791 ↗ | 1276 FULTON AVENUE BRONX | Alteration | Permit Issued | 04/25/2025 | 03/19/2026 | Contractor BEDROCK MECHANICAL INC | MODIFICATIONS TO THE EXISTING WET SPRINKLER SYSTEM TO ACCOMMODATE THE NEW ARCHITECTURAL BACKGROUND AS INDICATED ON THE PLANS FILED HEREWIITH… |
| X01178537 ↗ | 1650 SELWYN AVENUE BRONX | Alteration | Signed-off | 02/14/2025 | 08/20/2025 | Design AKF ENGINEERS, LLP Contractor TRI-STATE CONTRACTING GRO Filer JULIAN A. GOMEZ | At 1st Floor, Modification of existing ductwork per proposed relocation of neurology clinic from 1st floor Milstein Building. |
| X01131615 ↗ | 1650 GRAND CONCOURSE BRONX | Alteration | Signed-off | 02/14/2025 | 05/05/2025 | Design AKF ENGINEERS, LLP Contractor BRONX COUNTY SHEET METAL Filer JULIAN A. GOMEZ | At 2nd Floor, Ductwork to be revised to serve new Specialty Pharmacy and support spaces. |
| X00882124 ↗ | 1650 GRAND CONCOURSE BRONX | Alteration | Permit Issued | 07/10/2023 | 12/11/2023 | Contractor ALLSTATE SPRINKLER LLC | Modification existing sprinkler system at 2nd floor cafe to relocate & install new heads. No change to use, egress or occupancy. |
| X00749990 ↗ | 1650 GRAND CONCOURSE BRONX | Alteration | Permit Issued | 09/07/2022 | 09/09/2022 | Owner BRONXCARE HEALTH SYSTEM Contractor ALLSTATE SPRINKLER LLC Filer JULIAN A. GOMEZ | Modify and upgrade existing sprinkler system in 4th floor CCU. No change to use, egress or occupancy. |
| X00396514 ↗ | 1650 GRAND CONCOURSE BRONX | Alteration | Signed-off | 04/28/2021 | 01/19/2022 | Owner BRONXCARE HEALTH SYSTEM Contractor EAST COAST PETROLEUM INC Filer JULIAN A. GOMEZ | Removal of four (4) existing #2 oil-fired Fulton high pressure steam boilers and replace with two (2) new medium pressure steam boilers and… |
| X00372360 ↗ | 1276 FULTON AVENUE BRONX | Alteration | Filed — no permit on record | 10/13/2020 | — | — |
| Building | Filings | Most Recent |
|---|---|---|
| 1276 FULTON AVENUE ↗ | 2 | 12/17/2025 |
| 1650 GRAND CONCOURSE ↗ | 4 | 02/14/2025 |
| 1650 SELWYN AVENUE ↗ | 1 | 02/14/2025 |