| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00674606 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 04/12/2022 | 08/22/2024 | Design GENSLER Owner COLLIERS Contractor CLUNE CONSTRUCTION CO LP | Installation of non bearing partitions, doors, and related finishes as per plans filed herewith. No change in use, egress, or occupancy unde… |
| M00877597 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 06/12/2023 | 09/06/2023 | Design SYSKA HENNESSY GROUP Owner COLLIERS Contractor ASHLAR MECHANICAL CORP | Removal of existing pre-action sprinkler system in Data Center and replace with new temporary wet sprinkler on 10th floor. |
| M00862971 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 06/12/2023 | 06/21/2023 | Design SYSKA HENNESSY GROUP Owner COLLIERS Contractor CLUNE CONSTRUCTION CO LP | Demolition and removal of existing water-cooled air handlers. |
| M00877602 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 06/12/2023 | 06/21/2023 | Contractor CLUNE CONSTRUCTION CO LP | Filing for interior Steel and Concrete structural modifications as per plans filed herewith. Work is not a full/partial demolition and struc… |
| M00741010 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Filed — no permit on record | 10/28/2022 | — | Design MG ENGINEERING D.P.C. | — |
| M00674836 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 04/12/2022 | 06/01/2022 | Design SYSKA HENNESSY GROUP Owner COLLIERS Contractor ENOBRAC PLUMBING, INC | Installation of plumbing fixtures as per plans filed herewith. Removal of temp loop sprinkler and installation of sprinkler fixtures as per … |
| Name | Projects together | Most recent |
|---|---|---|
| SYSKA HENNESSY GROUP | 5 | 06/12/2023 |
| GENSLER | 2 | 04/12/2022 |
| ART OF FORM, ARCHITECTS | 1 | 01/14/2022 |
| MG ENGINEERING D.P.C. | 1 | 10/28/2022 |
| THE EIPEL ENGINEERING GROUP, D.P.C. | 1 | 06/12/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| CLUNE CONSTRUCTION CO LP | 6 | 06/12/2023 |
| ASHLAR MECHANICAL CORP | 3 | 06/12/2023 |
| ENOBRAC PLUMBING, INC | 2 | 10/13/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| COLLIERS | 7 | 06/12/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 6 | 06/12/2023 |
| ART OF FORM,ARCHITECTS | 1 | 01/14/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00674606 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 04/12/2022 | 08/22/2024 | Design GENSLER Owner COLLIERS Contractor CLUNE CONSTRUCTION CO LP | Installation of non bearing partitions, doors, and related finishes as per plans filed herewith. No change in use, egress, or occupancy unde… |
| M00877597 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 06/12/2023 | 09/06/2023 | Design SYSKA HENNESSY GROUP Owner COLLIERS Contractor ASHLAR MECHANICAL CORP | Removal of existing pre-action sprinkler system in Data Center and replace with new temporary wet sprinkler on 10th floor. |
| M00862971 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 06/12/2023 | 06/21/2023 | Design SYSKA HENNESSY GROUP Owner COLLIERS Contractor CLUNE CONSTRUCTION CO LP | Demolition and removal of existing water-cooled air handlers. |
| M00877602 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 06/12/2023 | 06/21/2023 | Contractor CLUNE CONSTRUCTION CO LP | Filing for interior Steel and Concrete structural modifications as per plans filed herewith. Work is not a full/partial demolition and struc… |
| M00741010 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Filed — no permit on record | 10/28/2022 | — | Design MG ENGINEERING D.P.C. | — |
| M00674836 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 04/12/2022 | 06/01/2022 | Design SYSKA HENNESSY GROUP Owner COLLIERS Contractor ENOBRAC PLUMBING, INC | Installation of plumbing fixtures as per plans filed herewith. Removal of temp loop sprinkler and installation of sprinkler fixtures as per … |
| M00690039 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 04/13/2022 | 06/01/2022 | Design SYSKA HENNESSY GROUP Owner COLLIERS Contractor ENOBRAC PLUMBING, INC | Installation of plumbing fixtures as per plans filed herewith. Removal of temp loop sprinkler and installation of sprinkler fixtures as per … |
| M00674619 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 04/12/2022 | 04/20/2022 | Design SYSKA HENNESSY GROUP Owner COLLIERS Contractor CLUNE CONSTRUCTION CO LP | Filing for installation of air conditioning systems and associated ducts and piping as per plans filed herewith. No change in use, egress, o… |
| M00670512 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 03/18/2022 | 03/21/2022 | Design GENSLER Contractor CLUNE CONSTRUCTION CO LP | Removal of non bearing partitions and finishes as per plans filed herewith. No change in use, egress, or occupancy under this application. |
| M00507785 ↗ | 120 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 06/23/2021 | 08/22/2021 | Design ART OF FORM, ARCHITECTS Owner COLLIERS Contractor CLUNE CONSTRUCTION CO LP Filer ART OF FORM,ARCHITECTS | proposed interior alterations and modifications of the 9th, 11th, and 12th floor, all as shown on drawings herewith submitted. No change in … |
| Building | Filings | Most Recent |
|---|---|---|
| 120 EAST 23 STREET ↗ | 10 | 06/12/2023 |