Back
Tenant
Dime Savings Bank
Tenant · filed under 2 names
QUEENS · 1BROOKLYN · 1
2 buildings
2
Total Filings
2
Projects on File
2
Buildings Worked
0
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Projects by first filing month2 projects all-time
0112Mar '22 · 1May '23 · 1Mar '22May '22Jul '22Sep '22Nov '22Jan '23Mar '23May '23
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Signed off2100%
By project type
Alteration2
Most active buildings
All buildings →
1525 86TH STREETBROOKLYN · latest 04/01/2022
1 projects
59-01 MAIN STREETQUEENS · latest 05/14/2023
1 projects
Key relationships
Everyone →
Design firms
Contractors
Filed under
Dime Savingsbank1Dime Savings Bank1
Identified by the contact ids of the people who file for the firm and by its email domain, not by matching names.
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
Q00823644 ↗59-01 MAIN STREET
QUEENS
AlterationSigned-off05/12/202305/14/2023Replacement of air conditioning unit on the roof. No change in use egress and occupancy.
B00673842 ↗1525 86TH STREET
BROOKLYN
AlterationSigned-off03/31/202204/01/2022Replacement of (2) Air Conditioning units on the roof on existing steel dunnage. Existing ductwork to remain and shall not be affected.
Counts cover all 2 projects (2 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Newtec Engineering205/12/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Commercial Cooling Servi*205/12/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
1525 86th Street103/31/2022
Vishnick McGovern Milizio105/12/2023
2 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 2Signed off 2
2 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
Q00823644 ↗59-01 MAIN STREET
QUEENS
AlterationSigned-off05/12/202305/14/2023Replacement of air conditioning unit on the roof. No change in use egress and occupancy.
B00673842 ↗1525 86TH STREET
BROOKLYN
AlterationSigned-off03/31/202204/01/2022Replacement of (2) Air Conditioning units on the roof on existing steel dunnage. Existing ductwork to remain and shall not be affected.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
59-01 MAIN STREET ↗105/12/2023
1525 86TH STREET ↗103/31/2022
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026B00673842-I1 · 1525 86TH STREETOpen ↗
08/28/2026B00673842-I1 · 1525 86TH STREETOpen ↗
08/28/2026B00673842-I1 · 1525 86TH STREETOpen ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026Q00823644-I1 · 59-01 MAIN STREETOpen ↗
08/13/2026B00673842-I1 · 1525 86TH STREETOpen ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B00673842-I1 · 1525 86TH STREETOpen ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026Q00823644-I1 · 59-01 MAIN STREETOpen ↗
08/13/2026B00673842-I1 · 1525 86TH STREETOpen ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00673842-I1 · 1525 86TH STREETOpen ↗