| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01004867 ↗ | 342 WEST 40TH STREET MANHATTAN | Alteration | Signed-off | 02/14/2024 | 02/10/2025 | Design ASHRAF CORP Contractor LEMX CORP | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAP… |
| M00981039 ↗ | 342 WEST 40TH STREET MANHATTAN | Alteration | Signed-off | 03/06/2024 | 10/30/2024 | Design THORNTON TOMASETTI Contractor PHOENIX SUTTON STR INC | Cut/repair mortar joints. Remove spalled/cracked face bricks and replace. Repair concrete, stucco metal copings, sealed joints and roof gua… |
| M01112112 ↗ | 342 WEST 40TH STREET MANHATTAN | Alteration | Permit Issued | 09/19/2024 | 09/19/2024 | Design RIGID STRUCTURAL DESIGN, LLC Contractor PHOENIX SUTTON STR INC | Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 3… |
| M01099734 ↗ | 342 WEST 40TH STREET MANHATTAN | Alteration | Permit Issued | 09/03/2024 | 09/05/2024 | Design RIGID STRUCTURAL DESIGN, LLC Contractor PHOENIX SUTTON STR, INC | Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy. |
| M00288781 ↗ | 342 WEST 40TH STREET MANHATTAN | Alteration | Signed-off | 12/30/2019 | 12/29/2020 | Contractor PHOENIX SUTTON STR INC | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPT… |
| Name | Projects together | Most recent |
|---|---|---|
| Rigid Structural Design | 2 | 09/19/2024 |
| Ashraf | 1 | 02/14/2024 |
| Thornton Tomasetti | 1 | 03/06/2024 |
| VS Consulting Engineering | 1 | 12/30/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| Phoenix Sutton STR | 4 | 09/19/2024 |
| Lemx | 1 | 02/14/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| Stephen F. Ellman, As Temporary Rec | 2 | 09/19/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| Rigid Structural Design | 2 | 09/19/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01004867 ↗ | 342 WEST 40TH STREET MANHATTAN | Alteration | Signed-off | 02/14/2024 | 02/10/2025 | Design ASHRAF CORP Contractor LEMX CORP | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAP… |
| M00981039 ↗ | 342 WEST 40TH STREET MANHATTAN | Alteration | Signed-off | 03/06/2024 | 10/30/2024 | Design THORNTON TOMASETTI Contractor PHOENIX SUTTON STR INC | Cut/repair mortar joints. Remove spalled/cracked face bricks and replace. Repair concrete, stucco metal copings, sealed joints and roof gua… |
| M01112112 ↗ | 342 WEST 40TH STREET MANHATTAN | Alteration | Permit Issued | 09/19/2024 | 09/19/2024 | Design RIGID STRUCTURAL DESIGN, LLC Contractor PHOENIX SUTTON STR INC | Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 3… |
| M01099734 ↗ | 342 WEST 40TH STREET MANHATTAN | Alteration | Permit Issued | 09/03/2024 | 09/05/2024 | Design RIGID STRUCTURAL DESIGN, LLC Contractor PHOENIX SUTTON STR, INC | Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy. |
| M00288781 ↗ | 342 WEST 40TH STREET MANHATTAN | Alteration | Signed-off | 12/30/2019 | 12/29/2020 | Contractor PHOENIX SUTTON STR INC | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPT… |
| Building | Filings | Most Recent |
|---|---|---|
| 342 WEST 40TH STREET ↗ | 5 | 09/19/2024 |