| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00683054 ↗ | 424 5TH AVENUE MANHATTAN | Alteration | Signed-off | 03/07/2022 | 04/07/2023 | Design DOUGLAS P. GONZALEZ Contractor STRUCTURE TONE, LLC | Structural modifications on floors 2nd floor package 3 as per plans filed herewith. No change to use, egress, or occupancy. |
| M00683028 ↗ | 424 5TH AVENUE MANHATTAN | Alteration | Signed-off | 03/07/2022 | 03/03/2023 | Design CCPE Owner SENECA GROUP Contractor PREFERRED SPKLR AND MECH | Sprinkler modifications on the 2nd floor package 3 as per plans filed herewith. No change to use, egress, or occupancy. |
| M00630528 ↗ | 424 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2022 | 06/29/2022 | Design CCPE Owner SENECA GROUP Contractor LAWRENCE J. LEVINE | Sprinkler modifications on floors 5-7 and sc1 package 4 as per plans filed herewith. No change to use, egress, or occupancy. |
| M00634505 ↗ | 424 5TH AVENUE MANHATTAN | Alteration | Signed-off | 12/15/2021 | 04/11/2022 | Design WRNS STUDIO Owner SENECA GROUP Contractor STRUCTURE TONE, LLC | Interior renovations on the 2nd floor package 3 as per plans filed herewith. No change to use, egress, or occupancy. |
| M00630485 ↗ | 424 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2022 | 03/28/2022 | Design CCPE Owner SENECA GROUP Contractor PREFERRED SPKLR AND MECH | Sprinkler modifications on floors cellar, 1st, and mezz1 for package 1 as per plans filed herewith. No change to use, egress, or occupancy. |
| M00630502 ↗ | 424 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2022 | 03/28/2022 | Design CCPE Owner SENECA GROUP Contractor PREFERRED SPKLR AND MECH | Sprinkler modifications on floors 2-4 and sc1 package 2 as per plans filed herewith. No change to use, egress, or occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| Ccpe | 4 | 08/16/2023 |
| Douglas P. Gonzalez | 2 | 10/07/2022 |
| WRNS Studio | 1 | 10/05/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| Preferred Sprinkler and Mechanical | 3 | 08/16/2023 |
| Structure Tone | 2 | 10/07/2022 |
| Par Fire Protection | 1 | 04/10/2023 |
| Soh Par Sprinkler | 1 | 04/10/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Seneca Group | 5 | 08/16/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| A1 Expediting Service | 5 | 08/16/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00683054 ↗ | 424 5TH AVENUE MANHATTAN | Alteration | Signed-off | 03/07/2022 | 04/07/2023 | Design DOUGLAS P. GONZALEZ Contractor STRUCTURE TONE, LLC | Structural modifications on floors 2nd floor package 3 as per plans filed herewith. No change to use, egress, or occupancy. |
| M00683028 ↗ | 424 5TH AVENUE MANHATTAN | Alteration | Signed-off | 03/07/2022 | 03/03/2023 | Design CCPE Owner SENECA GROUP Contractor PREFERRED SPKLR AND MECH | Sprinkler modifications on the 2nd floor package 3 as per plans filed herewith. No change to use, egress, or occupancy. |
| M00630528 ↗ | 424 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2022 | 06/29/2022 | Design CCPE Owner SENECA GROUP Contractor LAWRENCE J. LEVINE | Sprinkler modifications on floors 5-7 and sc1 package 4 as per plans filed herewith. No change to use, egress, or occupancy. |
| M00634505 ↗ | 424 5TH AVENUE MANHATTAN | Alteration | Signed-off | 12/15/2021 | 04/11/2022 | Design WRNS STUDIO Owner SENECA GROUP Contractor STRUCTURE TONE, LLC | Interior renovations on the 2nd floor package 3 as per plans filed herewith. No change to use, egress, or occupancy. |
| M00630485 ↗ | 424 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2022 | 03/28/2022 | Design CCPE Owner SENECA GROUP Contractor PREFERRED SPKLR AND MECH | Sprinkler modifications on floors cellar, 1st, and mezz1 for package 1 as per plans filed herewith. No change to use, egress, or occupancy. |
| M00630502 ↗ | 424 5TH AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2022 | 03/28/2022 | Design CCPE Owner SENECA GROUP Contractor PREFERRED SPKLR AND MECH | Sprinkler modifications on floors 2-4 and sc1 package 2 as per plans filed herewith. No change to use, egress, or occupancy. |
| M00634529 ↗ | 424 5TH AVENUE MANHATTAN | Alteration | Filed — no permit on record | 01/03/2022 | — | Design DOUGLAS P. GONZALEZ | — |
| Building | Filings | Most Recent |
|---|---|---|
| 424 5TH AVENUE ↗ | 7 | 08/16/2023 |