← Back
Entity
GACC
Tenant
MANHATTAN · 3
1 building
3
Total Filings
3
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Projects by first filing month3 projects all-time
0123May '25 · 1Jun '25 · 2May '25Jun '25
Portfolio status
Browse projects →
Signed off3100%
By project type
Alteration3
Most active buildings
All buildings →
120 WALL STREETMANHATTAN · latest 06/12/2025
3 projects
Key relationships
Everyone →
Filing representatives
Contractors
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01212127 ↗120 WALL STREET
MANHATTAN
AlterationSigned-off06/05/202506/12/2025Sprinkler work on the 20th floor (GACC) as indicated on drawings.
M01212088 ↗120 WALL STREET
MANHATTAN
AlterationSigned-off06/09/202506/11/2025Architectural work on the 20th floor (GACC) as indicated on drawings.
M01212039 ↗120 WALL STREET
MANHATTAN
AlterationSigned-off05/08/202505/09/2025Interior demolition of non load bearing partitions and related work on the 20th floor as indicated on drawings.
Counts cover all 3 projects (3 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
WYS DESIGN PARTNERSHIP ARCHITECTS206/09/2025
MG ENGINEERING D.P.C.103/31/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
JRM CONSTRUCTION MGMT LLC206/09/2025
PSI PARTNERS, LLC103/31/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
SILVERSTEIN PROPERTIES INC.303/31/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ARCHETYPE CONSULTANTS, INC.303/31/2026
3 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 3Signed off 3
3 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01212127 ↗120 WALL STREET
MANHATTAN
AlterationSigned-off06/05/202506/12/2025Sprinkler work on the 20th floor (GACC) as indicated on drawings.
M01212088 ↗120 WALL STREET
MANHATTAN
AlterationSigned-off06/09/202506/11/2025Architectural work on the 20th floor (GACC) as indicated on drawings.
M01212039 ↗120 WALL STREET
MANHATTAN
AlterationSigned-off05/08/202505/09/2025Interior demolition of non load bearing partitions and related work on the 20th floor as indicated on drawings.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
120 WALL STREET ↗303/31/2026
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026M01212039-I1 · 120 WALL STREETRequest digital key ↗
08/23/2026M01212127-I1 · 120 WALL STREETRequest digital key ↗
08/23/2026M01212127-P1 · 120 WALL STREETRequest digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026M01212039-I1 · 120 WALL STREETOpen ↗
08/23/2026M01212127-I1 · 120 WALL STREETOpen ↗
08/23/2026M01212127-P1 · 120 WALL STREETOpen ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M01212039-I1 · 120 WALL STREETOpen ↗
08/28/2026M01212127-P1 · 120 WALL STREETOpen ↗
08/28/2026M01212127-P1 · 120 WALL STREETOpen ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026M01212039-I1 · 120 WALL STREETOpen ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026M01212039-I1 · 120 WALL STREETOpen ↗
08/23/2026M01212127-I1 · 120 WALL STREETOpen ↗
08/13/2026M01212088-I1 · 120 WALL STREETOpen ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026M01212039-I1 · 120 WALL STREETOpen ↗
08/13/2026M01212088-I1 · 120 WALL STREETOpen ↗