Back
Tenant
Joele Frank
Tenant
1 project with open permitsMANHATTAN · 4
1 building
4
Total Filings
4
Projects on File
1
Buildings Worked
1
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Projects by first filing month4 projects all-time
0134May '21 · 1Jun '21 · 3May '21Jun '21
Portfolio status
Browse projects →
Open permit125%
Signed off375%
By project type
Alteration4
Most active buildings
All buildings →
622 3RD AVENUEMANHATTAN · 1 open · latest 07/01/2021
4 projects
Key relationships
Everyone →
Filing representatives
Contractors
Owners
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00522591 ↗622 3RD AVENUE
MANHATTAN
AlterationSigned-off06/04/202107/01/2021Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes. No Change to Occupancy, Use or Egress is Proposed
M00511410 ↗622 3RD AVENUE
MANHATTAN
AlterationPermit Issued06/04/202106/28/2021Modifications/Additions to the Existing Sprinkler System and Removal of Plumbing Fixtures and Piping
M00507901 ↗622 3RD AVENUE
MANHATTAN
AlterationSigned-off05/24/202106/24/2021Demolition of Some Existing Partitions, Doors, Portion of Suspended Ceiling, Millwork, Floor & Wall Finishes.No Change to Occupancy,Use or E…
M00511459 ↗622 3RD AVENUE
MANHATTAN
AlterationSigned-off06/04/202106/24/2021Various Air Conditioning Ductwork, Supply Air Diffuser & Return Air Grille Changes Including Relocating Existing Air Conditioning Unit Pump …
Counts cover all 4 projects (4 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Randall P. Collins Architect206/04/2021
Robert Derector Associates206/04/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Icon Interiors306/04/2021
Par Fire Protection106/04/2021
Tristate Plumbing Services106/04/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Cohen Brothers Realty406/04/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Rethy Associates406/04/2021
4 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 4Open permit 1Signed off 3
4 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00522591 ↗622 3RD AVENUE
MANHATTAN
AlterationSigned-off06/04/202107/01/2021Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes. No Change to Occupancy, Use or Egress is Proposed
M00511410 ↗622 3RD AVENUE
MANHATTAN
AlterationPermit Issued06/04/202106/28/2021Modifications/Additions to the Existing Sprinkler System and Removal of Plumbing Fixtures and Piping
M00507901 ↗622 3RD AVENUE
MANHATTAN
AlterationSigned-off05/24/202106/24/2021Demolition of Some Existing Partitions, Doors, Portion of Suspended Ceiling, Millwork, Floor & Wall Finishes.No Change to Occupancy,Use or E…
M00511459 ↗622 3RD AVENUE
MANHATTAN
AlterationSigned-off06/04/202106/24/2021Various Air Conditioning Ductwork, Supply Air Diffuser & Return Air Grille Changes Including Relocating Existing Air Conditioning Unit Pump …
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
622 3RD AVENUE ↗406/04/2021
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026M00507901-I1 · 622 3RD AVENUERequest digital key ↗
09/03/2026M00511459-I1 · 622 3RD AVENUERequest digital key ↗
09/03/2026M00511410-P1 · 622 3RD AVENUERequest digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026M00511410-P1 · 622 3RD AVENUEOpen ↗
09/03/2026M00511410-I1 · 622 3RD AVENUEOpen ↗
09/03/2026M00522591-I1 · 622 3RD AVENUEOpen ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026M00507901-I1 · 622 3RD AVENUEOpen ↗
08/28/2026M00507901-I1 · 622 3RD AVENUEOpen ↗
08/23/2026M00511459-I1 · 622 3RD AVENUEOpen ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026M00511410-P1 · 622 3RD AVENUEOpen ↗
08/25/2026M00511410-P1 · 622 3RD AVENUEOpen ↗
08/23/2026M00511459-I1 · 622 3RD AVENUEOpen ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/03/2026M00511410-I1 · 622 3RD AVENUEOpen ↗
09/03/2026M00511410-P1 · 622 3RD AVENUEOpen ↗
08/15/2026M00522591-I1 · 622 3RD AVENUEOpen ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026M00522591-I1 · 622 3RD AVENUEOpen ↗
08/13/2026M00511459-I1 · 622 3RD AVENUEOpen ↗