| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00558763 ↗ | 115 EAST 15 STREET MANHATTAN | Alteration | Signed-off | 08/23/2021 | 08/23/2021 | Design NEWTEC ENGINEERING Contractor ARISTA AIR CONDITIONING C | Installation of Energy recovery ventilation system and associated ductwork |
| M00282255 ↗ | 115 EAST 15 STREET MANHATTAN | Alteration | Signed-off | 12/26/2019 | 12/27/2019 | Design NEWTEC ENGINEERING Owner LEE STRASBERG INSTITUTE Contractor ARISTA AIR CONDITIONING C | REPLACEMENT OF 7.5 TON AND 10 TON AC UNIT ON THE 1ST, 2ND FLOOR AND ROOF. NO CHANGE IN USE EGRESS OR OCCUPANCY |
| Name | Projects together | Most recent |
|---|---|---|
| NEWTEC ENGINEERING | 2 | 08/23/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| ARISTA AIR CONDITIONING C | 2 | 08/23/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| LEE STRASBERG INSTITUTE | 1 | 12/26/2019 |
| THE LEE STRASBERG THEATRE & FILM IN | 1 | 08/23/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00558763 ↗ | 115 EAST 15 STREET MANHATTAN | Alteration | Signed-off | 08/23/2021 | 08/23/2021 | Design NEWTEC ENGINEERING Contractor ARISTA AIR CONDITIONING C | Installation of Energy recovery ventilation system and associated ductwork |
| M00282255 ↗ | 115 EAST 15 STREET MANHATTAN | Alteration | Signed-off | 12/26/2019 | 12/27/2019 | Design NEWTEC ENGINEERING Owner LEE STRASBERG INSTITUTE Contractor ARISTA AIR CONDITIONING C | REPLACEMENT OF 7.5 TON AND 10 TON AC UNIT ON THE 1ST, 2ND FLOOR AND ROOF. NO CHANGE IN USE EGRESS OR OCCUPANCY |
| Building | Filings | Most Recent |
|---|---|---|
| 115 EAST 15 STREET ↗ | 2 | 08/23/2021 |