| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01357551 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 03/09/2026 | 04/27/2026 | Design ROBERT DERECTOR ASSOCIATES Contractor ABCO-PEERLESS SPRKLR CORP Filer RIZZO GROUP | Install (192) new sprinkler heads and (26) temp heads on 17th Floor and (379) new heads, (45) temp heads and remove (1) FHR and install (1) … |
| M01357433 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 03/09/2026 | 04/14/2026 | Design ROBERT DERECTOR ASSOCIATES Contractor PAR PLUMBING CO., INC Filer RIZZO GROUP | Removal, replacement and installation of new plumbing fixtures and associated CW/sanitary piping on the 17-18th Floors as per plans (Lowenst… |
| M01357346 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 03/11/2026 | 03/23/2026 | Design GENSLER Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | Minor interior demolition. Installation of new interior partitions, suspended ceilings, flooring and finishes on the 17-18th Floor as per pl… |
| M01357377 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 03/09/2026 | 03/12/2026 | Design THORNTON TOMASETTI Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | Structural Modifications: Install new structural steel at existing interconnecting stair to support new glass guardrail between the 17-18th … |
| M01357393 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 03/09/2026 | 03/12/2026 | Design ROBERT DERECTOR ASSOCIATES Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | Modifications to the existing HVAC System: Install new ductwork, chilled water system, associated insulation, VAVs, (2) CRAH units, (1) Chil… |
| M00876227 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 10/11/2023 | 10/26/2023 | Design ROBERT DERECTOR ASSOCIATES Contractor LAB PLBG & HTG CO INC Filer RIZZO GROUP | Modifications to the existing plumbing system on the 19th floor (Lowenstein) as per plans. No change to use, egress or occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| ROBERT DERECTOR ASSOCIATES | 9 | 03/09/2026 |
| GENSLER | 3 | 03/11/2026 |
| THORNTON TOMASETTI | 1 | 03/09/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| STRUCTURE TONE, LLC | 7 | 03/11/2026 |
| PAR FIRE PROTECTION LLC | 2 | 04/08/2024 |
| ABCO-PEERLESS SPRKLR CORP | 1 | 03/09/2026 |
| LAB PLBG & HTG CO INC | 1 | 10/11/2023 |
| PAR PLUMBING CO., INC | 1 | 03/09/2026 |
| SIRINA FIRE PROT CORP | 1 | 07/05/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| 1251 AMERICAS ASSOCIATES II, L.P. | 12 | 03/11/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| RIZZO GROUP | 12 | 03/11/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01357551 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 03/09/2026 | 04/27/2026 | Design ROBERT DERECTOR ASSOCIATES Contractor ABCO-PEERLESS SPRKLR CORP Filer RIZZO GROUP | Install (192) new sprinkler heads and (26) temp heads on 17th Floor and (379) new heads, (45) temp heads and remove (1) FHR and install (1) … |
| M01357433 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 03/09/2026 | 04/14/2026 | Design ROBERT DERECTOR ASSOCIATES Contractor PAR PLUMBING CO., INC Filer RIZZO GROUP | Removal, replacement and installation of new plumbing fixtures and associated CW/sanitary piping on the 17-18th Floors as per plans (Lowenst… |
| M01357346 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 03/11/2026 | 03/23/2026 | Design GENSLER Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | Minor interior demolition. Installation of new interior partitions, suspended ceilings, flooring and finishes on the 17-18th Floor as per pl… |
| M01357377 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 03/09/2026 | 03/12/2026 | Design THORNTON TOMASETTI Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | Structural Modifications: Install new structural steel at existing interconnecting stair to support new glass guardrail between the 17-18th … |
| M01357393 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 03/09/2026 | 03/12/2026 | Design ROBERT DERECTOR ASSOCIATES Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | Modifications to the existing HVAC System: Install new ductwork, chilled water system, associated insulation, VAVs, (2) CRAH units, (1) Chil… |
| M00876227 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 10/11/2023 | 10/26/2023 | Design ROBERT DERECTOR ASSOCIATES Contractor LAB PLBG & HTG CO INC Filer RIZZO GROUP | Modifications to the existing plumbing system on the 19th floor (Lowenstein) as per plans. No change to use, egress or occupancy. |
| M00876224 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 10/18/2023 | 10/23/2023 | Design ROBERT DERECTOR ASSOCIATES Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | Modifications to the existing HVAC system on the 19th floor (Lowenstein) as per plans. No change to use, egress or occupancy. |
| M00876234 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 10/11/2023 | 10/20/2023 | Design ROBERT DERECTOR ASSOCIATES Contractor LAWRENCE J. LEVINE Filer RIZZO GROUP | Modifications to the existing sprinkler system on the 19th floor (Lowenstein) as per plans. No change to use, egress or occupancy. |
| M00876236 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 10/11/2023 | 10/20/2023 | Design ROBERT DERECTOR ASSOCIATES Contractor LAWRENCE J. LEVINE Filer RIZZO GROUP | Modifications to the existing standpipe system on the 19th floor (Lowenstein) as per plans. No change to use, egress or occupancy. |
| M00876214 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 10/02/2023 | 10/10/2023 | Design GENSLER Contractor STRUCTURE TONE, LLC | Installation of new partitions, doors, suspended ceilings and finishes on the 19th floor (Lowenstein) as per plans. No change to use, egress… |
| M00893789 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/05/2023 | 08/15/2023 | Design ROBERT DERECTOR ASSOCIATES Contractor SIRINA FIRE PROT CORP Filer RIZZO GROUP | Removal of existing sprinkler system with installation of a temporary loop on the 19th floor (Lowenstein- Demo Phase) as per plans. No chang… |
| M00893710 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/10/2023 | 07/17/2023 | Design GENSLER Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | Removal and disposal of interior partitions, doors, suspended ceilings, finishes and stair with temp wall and door on floor below (Lowenstei… |
| M00893766 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/05/2023 | 07/17/2023 | Design ROBERT DERECTOR ASSOCIATES Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | HVAC removals on the 19th floor (Lowenstein- Demo Phase) as per plans. No change to use, egress or occupancy. |
| Building | Filings | Most Recent |
|---|---|---|
| 1251 AVENUE OF THE AMER ↗ | 13 | 03/11/2026 |