Back
Tenant
Lyric Theatre
Tenant
5 projects with open permitsMANHATTAN · 17
2 buildings
17
Total Filings
17
Projects on File
2
Buildings Worked
5
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Projects by first filing month17 projects all-time
0134Apr '18 · 1May '18 · 1Apr '19 · 1Aug '19 · 3Oct '19 · 1Feb '20 · 1Mar '20 · 1Jun '20 · 3Sep '22 · 1Oct '22 · 1Nov '22 · 1Aug '23 · 1Oct '24 · 1201920202021202220232024
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit529%
Signed off741%
Filed only529%
By project type
Alteration17
Most active buildings
All buildings →
215 WEST 42ND STREETMANHATTAN · 4 open · latest 09/17/2026
15 projects
213 WEST 42ND STREETMANHATTAN · 1 open · latest 04/04/2025
2 projects
Key relationships
Everyone →
Design firms
Filing representatives
Contractors
Owners
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00213989 ↗215 WEST 42ND STREET
MANHATTAN
AlterationPermit Issued10/07/201909/17/2026INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCU…
M01120092 ↗215 WEST 42ND STREET
MANHATTAN
AlterationPermit Issued10/09/202409/26/2025
Owner SAFWAY ATLANTIC, LLC
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANC…
M00212034 ↗213 WEST 42ND STREET
MANHATTAN
AlterationPermit Issued08/27/201904/04/2025
Filer RPO INC.
Replace (1) domestic gas booster pump and pressure CP on existing valve. Replace (2) sewr ejectr pump in CEL. Remove (1) stm gen., (1) boile…
M08024020 ↗213 WEST 42ND STREET
MANHATTAN
AlterationSigned-off11/23/202201/28/2025Filing herewith facade restoration to exterior of the building. No change in use, egress or occupancy.
M00876682 ↗215 WEST 42ND STREET
MANHATTAN
AlterationPermit Issued08/23/202309/27/2024TEMPORARY SUPPORTED SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER T…
M00211053 ↗215 WEST 42ND STREET
MANHATTAN
AlterationSigned-off08/29/201909/29/2023INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NY…
Counts cover all 17 projects (17 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Brand Access Solutions510/09/2024
Tohfaz Uddin PE506/10/2020
WSP312/22/2022
Polise Consulting Engineers110/29/2020
Silman109/19/2022
Walter T. Gorman, P.E108/05/2022
WJE Engineers & Architects111/23/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Safway Atlantic510/09/2024
King Hoist & Scaffolding307/09/2019
Accurate Mechanical108/05/2022
Ahearn-Holtzman111/23/2022
Ariel Services110/29/2020
Arsenal Scaffold103/16/2020
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
NYC Economic Development910/10/2023
Safway Atlantic110/09/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
JM Zoning210/13/2022
A1 Expediting Service110/10/2023
Empire City Consultants111/23/2022
17 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 17Open permit 5Signed off 7Filed only 5
17 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00213989 ↗215 WEST 42ND STREET
MANHATTAN
AlterationPermit Issued10/07/201909/17/2026INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCU…
M01120092 ↗215 WEST 42ND STREET
MANHATTAN
AlterationPermit Issued10/09/202409/26/2025
Owner SAFWAY ATLANTIC, LLC
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANC…
M00212034 ↗213 WEST 42ND STREET
MANHATTAN
AlterationPermit Issued08/27/201904/04/2025
Filer RPO INC.
Replace (1) domestic gas booster pump and pressure CP on existing valve. Replace (2) sewr ejectr pump in CEL. Remove (1) stm gen., (1) boile…
M08024020 ↗213 WEST 42ND STREET
MANHATTAN
AlterationSigned-off11/23/202201/28/2025Filing herewith facade restoration to exterior of the building. No change in use, egress or occupancy.
M00876682 ↗215 WEST 42ND STREET
MANHATTAN
AlterationPermit Issued08/23/202309/27/2024TEMPORARY SUPPORTED SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER T…
M00211053 ↗215 WEST 42ND STREET
MANHATTAN
AlterationSigned-off08/29/201909/29/2023INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NY…
M00663226 ↗215 WEST 42ND STREET
MANHATTAN
AlterationFiled — no permit on record10/13/2022—
Design WSP
—
M00663284 ↗215 WEST 42ND STREET
MANHATTAN
AlterationFiled — no permit on record09/19/2022—
Design SILMAN
—
M00351297 ↗215 WEST 42ND STREET
MANHATTAN
AlterationFiled — no permit on record06/29/2020—
Design WSP
—
M00351296 ↗215 WEST 42ND STREET
MANHATTAN
AlterationFiled — no permit on record06/26/2020—
Design WSP
—
M00349564 ↗215 WEST 42ND STREET
MANHATTAN
AlterationFiled — no permit on record06/10/2020——
M00266797 ↗215 WEST 42ND STREET
MANHATTAN
AlterationSigned-off03/16/202003/17/2020Installation of temporary supported scaffold and interior supported/access scaffold per plan submitted. Work shall comply with 2014 building…
M00213611 ↗215 WEST 42ND STREET
MANHATTAN
AlterationPermit Issued02/05/202003/09/2020Propose installation of temporary standpipe system. No change in use, egress or occupancy.
M00036698 ↗215 WEST 42ND STREET
MANHATTAN
AlterationSigned-off05/04/201811/26/2019INSTALLATION OF STEEL PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2008 NYC BUILDING CODE.
M00208294 ↗215 WEST 42ND STREET
MANHATTAN
AlterationSigned-off08/12/201908/19/2019INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NY…
M00155861 ↗215 WEST 42ND STREET
MANHATTAN
AlterationSigned-off04/18/201904/19/2019INSTALLATION OF PLYWOOD ENCLOSURE AS PER PLANS DURING EXTERIOR RESTORATION. WORK SHALL COMPLY WITH THE NEW YORK CITY BUILDING CODE. NO CHANG…
M00028225 ↗215 WEST 42ND STREET
MANHATTAN
AlterationSigned-off04/18/201804/04/2019INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
215 WEST 42ND STREET ↗1510/09/2024
213 WEST 42ND STREET ↗211/23/2022
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch8
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence4
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe3
▸DOB NOWPlans/Sketch - Sidewalk Shed2
▸DOB NOWPlans/Sketch - Supported Scaffold1
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/06/2026M00028225-I1 · 215 WEST 42ND STREETOpen ↗
09/05/2026M00155861-P1 · 215 WEST 42ND STREETOpen ↗
09/05/2026M00155861-I1 · 215 WEST 42ND STREETOpen ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M00036698-I1 · 215 WEST 42ND STREETOpen ↗
08/27/2026M08024020-I1 · 213 WEST 42ND STREETOpen ↗
08/26/2026M00208294-I1 · 215 WEST 42ND STREETOpen ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026M00213611-P1 · 215 WEST 42ND STREETOpen ↗
08/27/2026M08024020-I1 · 213 WEST 42ND STREETOpen ↗
08/27/2026M08024020-I1 · 213 WEST 42ND STREETOpen ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
09/05/2026M00155861-P1 · 215 WEST 42ND STREETOpen ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M00213611-P1 · 215 WEST 42ND STREETOpen ↗
08/13/2026M08024020-I1 · 213 WEST 42ND STREETOpen ↗
08/13/2026M00213611-I1 · 215 WEST 42ND STREETOpen ↗
▸Approvals, Objections & Sign-offs34
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
09/06/2026M00028225-I1 · 215 WEST 42ND STREETOpen ↗
09/05/2026M00155861-I1 · 215 WEST 42ND STREETOpen ↗
09/05/2026M00155861-P1 · 215 WEST 42ND STREETOpen ↗
Showing 3 of 20 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
09/05/2026M00211053-I1 · 215 WEST 42ND STREETOpen ↗
09/01/2026M00351296-I1 · 215 WEST 42ND STREETOpen ↗
09/01/2026M00351296-P1 · 215 WEST 42ND STREETOpen ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026M00266797-I1 · 215 WEST 42ND STREETOpen ↗
08/13/2026M00208294-I1 · 215 WEST 42ND STREETOpen ↗