| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01329346 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Permit Issued | 12/08/2025 | 10/01/2026 | Design MRCE Contractor BELLET CONSTRUCTION CO.IN | THE SOE SERIERS DRAWINGS ADDRESS SUPPORT OF EXCAVATION (SOE). THE SOE SYSTEM CONSISTS OF CONCRETE BUTTON PIERS WITH TIMBER LAGGING. |
| M01154822 | 132 CLAREMONT AVENUE MANHATTAN | Alteration | Permit Issued | 05/15/2025 | 08/05/2026 | Design SIMPSON GUMPERTZ & HEGER Contractor HOLT CONSTRUCTION CORP | Non-destructive and destructive concrete testing for strength validation of superstructure. Concrete repairs associated with destructive tes… |
| M00906756 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Permit Issued | 07/25/2023 | 05/28/2026 | Design NEW AGE ENGINEERING PLLC Contractor APPROVED ENERGY LLC | INSTALL (2) TWO NEW HOT WATER HEATERS AND (2) TWO STORAGE TANKS. CONNECT (2) EXISTING BURNERS TO NEW GAS SERVICE AS PER PLANS. NO CHANGE IN … |
| M01108475 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Permit Issued | 09/18/2024 | 03/20/2026 | Design JOSE M. LANDAURO, P.E. Contractor BELLET CONSTRUCTION CO.IN | osp at sunkenwell |
| M01221651 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 05/08/2025 | 05/14/2025 | Design MCSWEENEY ENGINEERING Contractor COMPLETE MECHANICAL SOLUT Filer S&M EXPEDITING | Replacement of rooftop air conditioning unit as shown on submitted plans. No change in occupancy, use or egress. |
| M01193111 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 03/26/2025 | 04/21/2025 | Design SERMAN ENGINEERING Contractor BURDA CONSTRUCTION CORP | Structural work for installation of new elevator as shown on plans |
| Name | Projects together | Most recent |
|---|---|---|
| Jose M. Landauro, P.E | 3 | 09/18/2024 |
| New Age Engineering | 3 | 01/09/2026 |
| Ashraf | 2 | 01/31/2023 |
| Lubrano Ciavarra Architects | 2 | 03/26/2025 |
| Asif Jamil, RA | 1 | 06/03/2021 |
| Green Design | 1 | 09/13/2018 |
| KM Consulting Engineers | 1 | 04/12/2019 |
| KMB Design Group | 1 | 03/29/2023 |
| Kohler Ronan | 1 | 09/19/2024 |
| McSweeney Engineering | 1 | 05/08/2025 |
| Mrce | 1 | 12/08/2025 |
| Serman Engineering | 1 | 03/26/2025 |
| Simpson Gumpertz & Heger | 1 | 05/15/2025 |
| Syed Engineering | 1 | 08/26/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| Bellet Construction Co | 4 | 12/08/2025 |
| Burda Construction | 2 | 03/26/2025 |
| Rennon Construction | 2 | 01/31/2023 |
| Approved Oil Co Brooklyn | 1 | 07/25/2023 |
| Approved Oil Co of Brooklyn | 1 | 07/25/2023 |
| Bell Fuel Oil | 1 | 01/09/2026 |
| Complete Mechanical Solut | 1 | 05/08/2025 |
| Four Star Air Con'd Co | 1 | 09/19/2024 |
| Holt Construction | 1 | 05/15/2025 |
| Jimmy G Construction | 1 | 08/26/2019 |
| Kaj NY Construction | 1 | 09/13/2018 |
| Pma Construction Services | 1 | 03/29/2023 |
| Squan Construction Services | 1 | 04/12/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| Manhattan School Music | 12 | 01/09/2026 |
| Kaj NY Construction | 1 | 09/13/2018 |
| Rennon Construction | 1 | 01/31/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| William Vitacco Associates | 4 | 05/15/2025 |
| Right Way Services NYC | 3 | 09/18/2024 |
| Atlantic Building Supply | 1 | 09/13/2018 |
| Construction Permit Services | 1 | 03/29/2023 |
| Municipal Building Consultants | 1 | 06/03/2021 |
| Rennon Construction | 1 | 01/31/2023 |
| S&M Expediting | 1 | 05/08/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01329346 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Permit Issued | 12/08/2025 | 10/01/2026 | Design MRCE Contractor BELLET CONSTRUCTION CO.IN | THE SOE SERIERS DRAWINGS ADDRESS SUPPORT OF EXCAVATION (SOE). THE SOE SYSTEM CONSISTS OF CONCRETE BUTTON PIERS WITH TIMBER LAGGING. |
| M01154822 | 132 CLAREMONT AVENUE MANHATTAN | Alteration | Permit Issued | 05/15/2025 | 08/05/2026 | Design SIMPSON GUMPERTZ & HEGER Contractor HOLT CONSTRUCTION CORP | Non-destructive and destructive concrete testing for strength validation of superstructure. Concrete repairs associated with destructive tes… |
| M00906756 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Permit Issued | 07/25/2023 | 05/28/2026 | Design NEW AGE ENGINEERING PLLC Contractor APPROVED ENERGY LLC | INSTALL (2) TWO NEW HOT WATER HEATERS AND (2) TWO STORAGE TANKS. CONNECT (2) EXISTING BURNERS TO NEW GAS SERVICE AS PER PLANS. NO CHANGE IN … |
| M01108475 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Permit Issued | 09/18/2024 | 03/20/2026 | Design JOSE M. LANDAURO, P.E. Contractor BELLET CONSTRUCTION CO.IN | osp at sunkenwell |
| M01221651 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 05/08/2025 | 05/14/2025 | Design MCSWEENEY ENGINEERING Contractor COMPLETE MECHANICAL SOLUT Filer S&M EXPEDITING | Replacement of rooftop air conditioning unit as shown on submitted plans. No change in occupancy, use or egress. |
| M01193111 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 03/26/2025 | 04/21/2025 | Design SERMAN ENGINEERING Contractor BURDA CONSTRUCTION CORP | Structural work for installation of new elevator as shown on plans |
| M00906716 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Permit Issued | 07/25/2023 | 01/16/2025 | Design NEW AGE ENGINEERING PLLC Contractor APPROVED OIL CO BROOKLYN | INSTALL NEW CHIMNEY LINER, CHIMNEY OFFSET, AND EXHAUST VENTS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M00876304 | 132 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 05/26/2023 | 08/04/2023 | Design KOHLER RONAN, LLC Contractor FOUR STAR AIR COND CO LL | Modifications to existing mechanical systems as per plans filed herewith. No change in use, egress or occupancy. |
| M00906695 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 07/25/2023 | 07/26/2023 | Design NEW AGE ENGINEERING PLLC Contractor APPROVED OIL CO OF BKLYN | ACTIVATE EXISTING GAS PORTION OF (2) EXISTING GAS/OIL BURNERS ON (2) EXISTING LOW PRESSURE BOILERS. CHANGE GRADE OF FUEL #4 TO #2. NO CHANGE… |
| M00835704 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 03/29/2023 | 05/11/2023 | Design KMB DESIGN GROUP, LLC Contractor PMA CONSTRUCTION SERVICES | DISH WIRELESS- Installation of 3 new antenna sectors with 6 RRH units and 1 GPS unit on roof.. Install 1 new equipment cabinet in bulkhead o… |
| M00765121 | 132 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 06/28/2022 | 11/16/2022 | Design JOSE M. LANDAURO, P.E. Contractor BELLET CONSTRUCTION CO.IN | Filing for FISP Local Law 11 Facade Repairs work that includes brick masonry repairs, brick replacement, steel lintel replacement, etc. as p… |
| M07994569 | 132 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 08/27/2022 | 08/29/2022 | Design ASHRAF CORP Owner RENNON CONSTRUCTION CORP Contractor RENNON CONSTRUCTION CORP Filer RENNON CONSTRUCTION | INSTALLATION OF 190' NEW SIDEWALK SHED AT 136 CLAREMONT AVE AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY … |
| M00794851 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 08/18/2022 | 08/19/2022 | Design ASHRAF CORP Contractor RENNON CONSTRUCTION CORP | INSTALLATION OF 506' NEW SIDEWALK SHED AT 120 ClAREMONT AVE, AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY… |
| M00765181 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 06/28/2022 | 07/25/2022 | Design JOSE M. LANDAURO, P.E. Contractor BELLET CONSTRUCTION CO.IN | FISP Local Law 11 Facade Repairs work that includes brick masonry repairs, brick replacement, limestone repairs, etc. as shown on plans fil… |
| M00515444 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 05/13/2021 | 09/09/2021 | Contractor BURDA CONSTRUCTION CORP | Interior renovation of existing commercial space on the 1st floor as per plans filed herewith. No change to Use, Occupancy or Egress. |
| M00524448 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Filed — no permit on record | 06/03/2021 | — | Design ASIF JAMIL, RA | — |
| M00216909 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Permit Issued | 08/26/2019 | 08/26/2019 | Design SYED ENGINEERING, P.C. Contractor JIMMY G CONSTRUCTION CORP | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #… |
| M00118716 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 04/12/2019 | 08/06/2019 | Contractor SQUAN CONSTRUCTION SERVIC | Carrier: T-Mobile. Modification of an existing telecom site. Replace (6) existing antennas on an existing mount. All work is in conformance … |
| M00077250 | 120 CLAREMONT AVENUE MANHATTAN | Alteration | Permit Issued | 09/07/2018 | 09/10/2018 | Design GREEN DESIGN Owner KAJ NY CONSTRUCTION INC Contractor KAJ NY CONSTRUCTION INC | ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PERPLAN… |
| Building | Filings | Most Recent |
|---|---|---|
| 120 CLAREMONT AVENUE ↗ | 15 | 01/09/2026 |
| 132 CLAREMONT AVENUE ↗ | 4 | 05/15/2025 |