← Back
Entity
MLBPA
Tenant
MANHATTAN · 5
2 buildings
5
Total Filings
5
Projects on File
2
Buildings Worked
0
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Projects by first filing month5 projects all-time
0134Apr '22 · 2Nov '24 · 320232024
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Signed off5100%
By project type
Alteration5
Most active buildings
All buildings →
141 WEST 53 STREETMANHATTAN · latest 11/12/2024
3 projects
7 EAST 48 STREETMANHATTAN · latest 04/26/2022
2 projects
Key relationships
Everyone →
Design firms
Filing representatives
Owners
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01110834 ↗141 WEST 53 STREET
MANHATTAN
AlterationSigned-off11/06/202411/12/2024Modifications to the existing sprinkler system on the 28th and 29th floors (MLBPA- Marketing Floors 29 & 30) as per plans. No change to use,…
M01110421 ↗141 WEST 53 STREET
MANHATTAN
AlterationSigned-off11/06/202411/08/2024Modifications to the existing HVAC system on the 28th and 29th floors (MLBPA- Marketing Floors 29 & 30) as per plans. No change to use, egre…
M01110573 ↗141 WEST 53 STREET
MANHATTAN
AlterationSigned-off11/06/202411/08/2024Modifications to the existing plumbing system on the 28th and 29th floors (MLBPA- Marketing Floors 29 & 30) as per plans. No change to use, …
M00696825 ↗7 EAST 48 STREET
MANHATTAN
AlterationSigned-off04/06/202204/26/2022Mechanical work on the 24th and 25th floor (MLBPA) as indicated on drawings.
M00696836 ↗7 EAST 48 STREET
MANHATTAN
AlterationSigned-off04/06/202204/15/2022Sprinkler work on the 24th and 25th floor (MLBPA) as indicated on drawings
Counts cover all 5 projects (5 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
CFS ENGINEERING, DPC307/22/2025
MG ENGINEERING D.P.C.204/06/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ICON INTERIORS INC111/06/2024
PREFERRED MECHANICAL INC111/06/2024
PREFERRED SPKLR AND MECH107/22/2025
QUEST BUILDERS GROUP INC104/06/2022
SIRINA FIRE PROT CORP104/06/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
PARAMOUNT GROUP307/22/2025
KATO KAGAKU CO LTC104/06/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
RIZZO GROUP307/22/2025
ARCHETYPE CONSULTANTS, INC.104/06/2022
5 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 5Signed off 5
5 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01110834 ↗141 WEST 53 STREET
MANHATTAN
AlterationSigned-off11/06/202411/12/2024Modifications to the existing sprinkler system on the 28th and 29th floors (MLBPA- Marketing Floors 29 & 30) as per plans. No change to use,…
M01110421 ↗141 WEST 53 STREET
MANHATTAN
AlterationSigned-off11/06/202411/08/2024Modifications to the existing HVAC system on the 28th and 29th floors (MLBPA- Marketing Floors 29 & 30) as per plans. No change to use, egre…
M01110573 ↗141 WEST 53 STREET
MANHATTAN
AlterationSigned-off11/06/202411/08/2024Modifications to the existing plumbing system on the 28th and 29th floors (MLBPA- Marketing Floors 29 & 30) as per plans. No change to use, …
M00696825 ↗7 EAST 48 STREET
MANHATTAN
AlterationSigned-off04/06/202204/26/2022Mechanical work on the 24th and 25th floor (MLBPA) as indicated on drawings.
M00696836 ↗7 EAST 48 STREET
MANHATTAN
AlterationSigned-off04/06/202204/15/2022Sprinkler work on the 24th and 25th floor (MLBPA) as indicated on drawings
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
141 WEST 53 STREET ↗307/22/2025
7 EAST 48 STREET ↗204/06/2022
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/02/2026M00696836-I1 · 7 EAST 48 STREETRequest digital key ↗
09/02/2026M00696825-I1 · 7 EAST 48 STREETRequest digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026M00696836-I1 · 7 EAST 48 STREETOpen ↗
09/02/2026M00696825-I1 · 7 EAST 48 STREETOpen ↗
08/13/2026M01110834-I1 · 141 WEST 53 STREETOpen ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M01110834-P1 · 141 WEST 53 STREETOpen ↗
08/29/2026M01110834-I1 · 141 WEST 53 STREETOpen ↗
08/24/2026M01110573-I1 · 141 WEST 53 STREETOpen ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/02/2026M00696836-I1 · 7 EAST 48 STREETOpen ↗
09/02/2026M00696825-I1 · 7 EAST 48 STREETOpen ↗
08/13/2026M01110834-I1 · 141 WEST 53 STREETOpen ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00696825-I1 · 7 EAST 48 STREETOpen ↗