← Back
Entity
Mnemo Therapeutics
Tenant
MANHATTAN · 6
1 building
6
Total Filings
6
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Projects by first filing month6 projects all-time
0134Apr '21 · 3May '21 · 3Apr '21May '21
Portfolio status
Browse projects →
Signed off6100%
By project type
Alteration6
Most active buildings
All buildings →
430 EAST 29 STREETMANHATTAN · latest 08/25/2021
6 projects
Key relationships
Everyone →
Design firms
4 projects
2 projects
Filing representatives
6 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00519941 ↗430 EAST 29 STREET
MANHATTAN
AlterationSigned-off05/18/202108/25/2021
Filer RPO INC.
FIT-OUT OF TENANT SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
M00509567 ↗430 EAST 29 STREET
MANHATTAN
AlterationSigned-off04/30/202107/12/2021
Filer RPO INC.
MODIFICATION OF MECHANICAL SYSTEM. NO CHANGE IN OCCUPANCY, USE, OR EGRESS. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
M00519858 ↗430 EAST 29 STREET
MANHATTAN
AlterationSigned-off05/18/202106/23/2021
Design JACOBS
Filer RPO INC.
Construction of interior partition, ceiling, and finish as shown on drawings filed herewith. No change in occupancy, use, or egress.
M00509560 ↗430 EAST 29 STREET
MANHATTAN
AlterationSigned-off04/30/202106/22/2021
Filer RPO INC.
MODIFICATION OF SPRINKLER SYSTEM AS SHOWN ON DRAWIGNS FILED HEREWITH. NO CHANGE TO OCCUPANCY, USE OR OCCUPANCY.
M00519991 ↗430 EAST 29 STREET
MANHATTAN
AlterationSigned-off05/18/202106/02/2021
Filer RPO INC.
Installation of mechanical devices and ductwork as shown on drawings filed herewith, No change in occupancy, use, or egress.
M00509549 ↗430 EAST 29 STREET
MANHATTAN
AlterationSigned-off04/28/202105/27/2021
Design JACOBS
Filer RPO INC.
Demo of interior partition, ceiling and finishes as shown on drawing filed herewith . No change to occupancy, use or egress.
Counts cover all 6 projects (6 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BUROHAPPOLD410/27/2021
JACOBS210/21/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
STRUCTURE TONE, LLC410/27/2021
PAR FIRE PROTECTION LLC210/27/2021
TRISTATE PLBG SVCS CORP110/27/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ALEXANDRIA REAL ESTATE EQUITIES610/27/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
RPO INC.610/27/2021
6 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 6Signed off 6
6 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00519941 ↗430 EAST 29 STREET
MANHATTAN
AlterationSigned-off05/18/202108/25/2021
Filer RPO INC.
FIT-OUT OF TENANT SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
M00509567 ↗430 EAST 29 STREET
MANHATTAN
AlterationSigned-off04/30/202107/12/2021
Filer RPO INC.
MODIFICATION OF MECHANICAL SYSTEM. NO CHANGE IN OCCUPANCY, USE, OR EGRESS. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
M00519858 ↗430 EAST 29 STREET
MANHATTAN
AlterationSigned-off05/18/202106/23/2021
Design JACOBS
Filer RPO INC.
Construction of interior partition, ceiling, and finish as shown on drawings filed herewith. No change in occupancy, use, or egress.
M00509560 ↗430 EAST 29 STREET
MANHATTAN
AlterationSigned-off04/30/202106/22/2021
Filer RPO INC.
MODIFICATION OF SPRINKLER SYSTEM AS SHOWN ON DRAWIGNS FILED HEREWITH. NO CHANGE TO OCCUPANCY, USE OR OCCUPANCY.
M00519991 ↗430 EAST 29 STREET
MANHATTAN
AlterationSigned-off05/18/202106/02/2021
Filer RPO INC.
Installation of mechanical devices and ductwork as shown on drawings filed herewith, No change in occupancy, use, or egress.
M00509549 ↗430 EAST 29 STREET
MANHATTAN
AlterationSigned-off04/28/202105/27/2021
Design JACOBS
Filer RPO INC.
Demo of interior partition, ceiling and finishes as shown on drawing filed herewith . No change to occupancy, use or egress.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
430 EAST 29 STREET ↗610/27/2021
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature10
09/18/2026M00519991-P1 · 430 EAST 29 STREETOpen ↗
09/18/2026M00519991-P1 · 430 EAST 29 STREETOpen ↗
09/01/2026M00519858-I1 · 430 EAST 29 STREETOpen ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026M00519858-I1 · 430 EAST 29 STREETOpen ↗
09/03/2026M00519991-I1 · 430 EAST 29 STREETOpen ↗
09/03/2026M00519991-P1 · 430 EAST 29 STREETOpen ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/18/2026M00519991-P1 · 430 EAST 29 STREETOpen ↗
09/01/2026M00509560-I1 · 430 EAST 29 STREETOpen ↗
09/01/2026M00519858-I1 · 430 EAST 29 STREETOpen ↗
Showing 3 of 6 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00509567-I1 · 430 EAST 29 STREETOpen ↗
08/13/2026M00519991-I1 · 430 EAST 29 STREETOpen ↗
08/13/2026M00519858-I1 · 430 EAST 29 STREETOpen ↗