| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01069206 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 07/08/2024 | 07/11/2024 | Design AZA ENGINEERING LLC Contractor NU-WAY HEATING & COOLING | Replacement of existing makeup air unit, fan coil unit, associated ductwork, and controls. |
| M00946461 | 7 EAST 7TH STREET MANHATTAN | Alteration | Permit Issued | 10/11/2023 | 10/13/2023 | Design ENTHINK ENGINEERS LLC Owner PHOENIX SUTTON STR INC Contractor PRESERV BLD RESTOR MGT IN | TEMPORARY STORAGE OF EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. SIDEWALK SHED FILED SEPARATELY. STORAGE SHALL COMPLY WITH CHAPTER #33 OF … |
| M00561686 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 07/27/2021 | 07/25/2023 | Design W&M ENGINEERING Contractor NUCOR CONSTRUCTION CORP Filer AKA STUDIO LLC | RELOCATE EXISTING PLUMBING FIXTURES AND SPRINKLER HEADS AS PER OF INTERIOR RENOVATION OF EXISTING GREEN ROOM. NO CHANGE IN USE, OCCUPANCY OR… |
| M00904241 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 07/19/2023 | 07/19/2023 | Design ENTHINK ENGINEERS LLC Owner LEMX CORP Contractor LEMX CORP | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHAL… |
| M00570785 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 08/06/2021 | 05/15/2023 | Design PATUXENT ENGINEERING LLC Contractor MANHATTAN D ENTERPRISES | INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN PROTECTION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC CC. NO CHANGE IN USE, EGREES,… |
| M00719278 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 04/21/2022 | 04/19/2023 | Design KZ ENGINEERING, P.C Contractor PRESERV BLD RESTOR MGT IN | Installation of temporary material hoist per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress… |
| Name | Projects together | Most recent |
|---|---|---|
| Enthink Engineers | 3 | 10/11/2023 |
| Aka Studio | 2 | 12/18/2023 |
| KZ Engineering | 2 | 04/21/2022 |
| MG Engineering | 2 | 02/18/2021 |
| Aza Engineering | 1 | 04/30/2025 |
| Method Design Architecture + Urbani | 1 | 06/27/2022 |
| Patuxent Engineering | 1 | 01/09/2023 |
| Socotec | 1 | 12/01/2021 |
| W&M Engineering | 1 | 12/18/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Lemx | 3 | 07/19/2023 |
| Preserv BLD Restoration Management | 3 | 10/11/2023 |
| Nucor Construction | 2 | 12/18/2023 |
| Denko Mechanical | 1 | 06/09/2020 |
| DPH Plumbing & Heating | 1 | 03/10/2022 |
| Full Capacity Fire | 1 | 03/10/2022 |
| Mac Felder | 1 | 06/09/2020 |
| Manhattan Business Interi | 1 | 02/18/2021 |
| Manhattan D Enterprises | 1 | 01/09/2023 |
| NU-Way Heating & Cooling | 1 | 04/30/2025 |
| PSI Partners | 1 | 12/18/2023 |
| SPK/Lewis Construction | 1 | 03/10/2022 |
| Urban Intelligence | 1 | 01/09/2023 |
| William C. Gerakaris P&H | 1 | 12/18/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| The Cooper Union for the Advancemen | 8 | 04/30/2025 |
| Lemx | 3 | 07/19/2023 |
| Phoenix Sutton STR | 1 | 10/11/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Aka Studio | 2 | 12/18/2023 |
| JM Zoning | 1 | 06/27/2022 |
| Patuxent Engineering | 1 | 01/09/2023 |
| Synergy Building Consultants | 1 | 04/07/2022 |
| Vidaris | 1 | 12/01/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01069206 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 07/08/2024 | 07/11/2024 | Design AZA ENGINEERING LLC Contractor NU-WAY HEATING & COOLING | Replacement of existing makeup air unit, fan coil unit, associated ductwork, and controls. |
| M00946461 | 7 EAST 7TH STREET MANHATTAN | Alteration | Permit Issued | 10/11/2023 | 10/13/2023 | Design ENTHINK ENGINEERS LLC Owner PHOENIX SUTTON STR INC Contractor PRESERV BLD RESTOR MGT IN | TEMPORARY STORAGE OF EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. SIDEWALK SHED FILED SEPARATELY. STORAGE SHALL COMPLY WITH CHAPTER #33 OF … |
| M00561686 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 07/27/2021 | 07/25/2023 | Design W&M ENGINEERING Contractor NUCOR CONSTRUCTION CORP Filer AKA STUDIO LLC | RELOCATE EXISTING PLUMBING FIXTURES AND SPRINKLER HEADS AS PER OF INTERIOR RENOVATION OF EXISTING GREEN ROOM. NO CHANGE IN USE, OCCUPANCY OR… |
| M00904241 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 07/19/2023 | 07/19/2023 | Design ENTHINK ENGINEERS LLC Owner LEMX CORP Contractor LEMX CORP | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHAL… |
| M00570785 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 08/06/2021 | 05/15/2023 | Design PATUXENT ENGINEERING LLC Contractor MANHATTAN D ENTERPRISES | INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN PROTECTION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC CC. NO CHANGE IN USE, EGREES,… |
| M00719278 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 04/21/2022 | 04/19/2023 | Design KZ ENGINEERING, P.C Contractor PRESERV BLD RESTOR MGT IN | Installation of temporary material hoist per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress… |
| M00569053 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 12/01/2021 | 03/14/2023 | Design SOCOTEC, INC. Contractor PRESERV BLD RESTOR MGT IN Filer VIDARIS, INC | Facade restoration. No change in egress, use or occupancy. |
| M00817737 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 01/27/2023 | 01/27/2023 | Design ENTHINK ENGINEERS LLC Owner LEMX CORP Contractor LEMX CORP | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHAL… |
| M00627705 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 11/22/2021 | 11/17/2022 | Design KZ ENGINEERING, P.C Owner LEMX CORP Contractor LEMX CORP | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| M00750701 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 06/27/2022 | 07/01/2022 | Contractor NUCOR CONSTRUCTION CORP Filer JM ZONING, LLC. | Interior renovation of ground floor library including non-structural interior partitions, new lighting and switches. no change of use, egres… |
| M00534961 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 06/10/2021 | 07/15/2021 | Design AKA STUDIO LLC Contractor SPK/LEWIS CONSTRUCTION LL Filer AKA STUDIO LLC | RELOCATE EXISTING PLUMBING FIXTURES AND SPRINKLER HEADS AS PER OF INTERIOR RENOVATION OF EXISTING PHOTO WORK STUDIO. NO CHANGE IN USE, OCCUP… |
| M00350055 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 06/09/2020 | 02/05/2021 | Design MG ENGINEERING D.P.C. Contractor MANHATTAN BUSINESS INTERIORS Filer JM ZONING, LLC. | MH FILING IN CONJUNCTION WITH ALT-2 RENOVATION OF FOURTH FLOOR |
| M00350086 | 7 EAST 7TH STREET MANHATTAN | Alteration | Signed-off | 06/09/2020 | 10/28/2020 | Design MG ENGINEERING D.P.C. Contractor MAC FELDER INC Filer JM ZONING, LLC. | PL AND SP WORK FILED IN CONJUNCTION WITH ALTERATION-2 TO RENOVATE THE FOURTH FLOOR OF SCHOOL |
| Building | Filings | Most Recent |
|---|---|---|
| 7 EAST 7TH STREET ↗ | 13 | 04/30/2025 |