Back
Tenant
National Labor Relations Board
Tenant
BROOKLYN · 5
1 building
5
Total Filings
5
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Signed off5100%
By project type
Alteration5
Most active buildings
All buildings →
1 METROTECH CENTERBROOKLYN · latest 12/05/2023
5 projects
Key relationships
Everyone →
Design firms
Filing representatives
4 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B00927076 ↗1 METROTECH CENTER
BROOKLYN
AlterationSigned-off11/28/202312/05/2023STRUCTURAL FRAMING ON 20TH FLOOR (NLRB) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00927040 ↗1 METROTECH CENTER
BROOKLYN
AlterationSigned-off11/17/202311/28/2023REMOVAL AND INSTALLATION OF AIR HANDLERS, DIFFUSERS, ASSOCIATED DUCTWORK & GRILLES ON 20TH FLOOR (NLRB) AS PER PLANS FILED HEREWITH. NO CHAN…
B00927054 ↗1 METROTECH CENTER
BROOKLYN
AlterationSigned-off11/17/202311/28/2023REMOVAL AND INSTALLATION OF PLUMBING FIXTURES ASSOCIATED WITH RENOVATION ON 20TH FLOOR (NLRB) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCU…
B00927060 ↗1 METROTECH CENTER
BROOKLYN
AlterationSigned-off11/17/202311/27/2023MODIFICATION OF SPRINKLER HEADS ON 20TH FLOOR (NLRB) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00927027 ↗1 METROTECH CENTER
BROOKLYN
AlterationSigned-off11/17/202311/21/2023INTERIOR REMOVAL AND INSTALLATION OF NON-BEARING PARTITIONS ASSOCIATED WITH THE RENOVATION ON 20TH FLOOR (NLRB) AS PER PLANS FILED HEREWITH.…
Counts cover all 5 projects (5 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
AMA Consulting Engineers305/22/2024
Gilsanz Murray Steficek111/28/2023
TPG Architecture111/17/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Turner Construction Company311/28/2023
Abco-Peerless Sprinkler105/22/2024
Tristate Plumbing Services111/17/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Forest City Jay Street Associates405/22/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Jam Consultants405/22/2024
5 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 5Signed off 5
5 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B00927076 ↗1 METROTECH CENTER
BROOKLYN
AlterationSigned-off11/28/202312/05/2023STRUCTURAL FRAMING ON 20TH FLOOR (NLRB) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00927040 ↗1 METROTECH CENTER
BROOKLYN
AlterationSigned-off11/17/202311/28/2023REMOVAL AND INSTALLATION OF AIR HANDLERS, DIFFUSERS, ASSOCIATED DUCTWORK & GRILLES ON 20TH FLOOR (NLRB) AS PER PLANS FILED HEREWITH. NO CHAN…
B00927054 ↗1 METROTECH CENTER
BROOKLYN
AlterationSigned-off11/17/202311/28/2023REMOVAL AND INSTALLATION OF PLUMBING FIXTURES ASSOCIATED WITH RENOVATION ON 20TH FLOOR (NLRB) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCU…
B00927060 ↗1 METROTECH CENTER
BROOKLYN
AlterationSigned-off11/17/202311/27/2023MODIFICATION OF SPRINKLER HEADS ON 20TH FLOOR (NLRB) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00927027 ↗1 METROTECH CENTER
BROOKLYN
AlterationSigned-off11/17/202311/21/2023INTERIOR REMOVAL AND INSTALLATION OF NON-BEARING PARTITIONS ASSOCIATED WITH THE RENOVATION ON 20TH FLOOR (NLRB) AS PER PLANS FILED HEREWITH.…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
1 METROTECH CENTER ↗505/22/2024
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026B00927054-I1 · 1 METROTECH CENTEROpen ↗
08/26/2026B00927027-I1 · 1 METROTECH CENTEROpen ↗
08/26/2026B00927040-I1 · 1 METROTECH CENTEROpen ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/24/2026B00927040-I1 · 1 METROTECH CENTEROpen ↗
08/24/2026B00927040-I1 · 1 METROTECH CENTEROpen ↗
08/23/2026B00927027-I1 · 1 METROTECH CENTEROpen ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026B00927054-I1 · 1 METROTECH CENTEROpen ↗
08/24/2026B00927040-I1 · 1 METROTECH CENTEROpen ↗
08/23/2026B00927060-P1 · 1 METROTECH CENTEROpen ↗