| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01174197 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Permit Issued | 03/18/2025 | 02/17/2026 | Design THE VSA GROUP Contractor D&E REFRIGERATION & AIR C Filer VSA | REMOVE EX. 90 TON CHILLER & 2 AIR HANDLERS. INSTALL 2- 60 TON CHILLERS W/ 2 NEW AIR HANDLERS. INSTALL PUMPS W/ PIPING MODIFIACTIONS. INSTAL… |
| M01171511 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Permit Issued | 01/31/2025 | 03/27/2025 | Design MCLAREN ENGINEERING GROUP Contractor DYNAMIC SHEET METAL | structural work including trusses installation for the run of the show REDWOOD at the front of the house as shown on plans filed herewith. N… |
| M01131500 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Signed-off | 10/25/2024 | 11/08/2024 | Design LHOTSE CORP Contractor LHOTSE CORP | Facade Restoration Via Suspended Scaffolding |
| M01117217 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Signed-off | 09/26/2024 | 09/27/2024 | Design ASHRAF CORP Contractor ANDAMIO SCAFFOLDING LLC | Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change … |
| M01117253 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Signed-off | 09/26/2024 | 09/27/2024 | Design ASHRAF CORP Contractor ANDAMIO SCAFFOLDING LLC | Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use… |
| M00555081 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Signed-off | 07/21/2021 | 07/27/2021 | Design THE VSA GROUP Contractor ETNA CONTRACTING INC Filer VSA | Floor slab replacement at Orchestra Level as shown in filed drawings. No change in use, occupancy and egress. |
| Name | Projects together | Most recent |
|---|---|---|
| Ashraf | 2 | 09/26/2024 |
| The Vsa Group | 2 | 03/27/2025 |
| Baileys Engineering | 1 | 02/21/2018 |
| Carl Guinta Associates | 1 | 10/18/2019 |
| Lhotse | 1 | 10/25/2024 |
| McLaren Engineering Group | 1 | 01/31/2025 |
| Murdoch Engineering | 1 | 07/13/2018 |
| Sterling Engineering Services | 1 | 03/27/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Andamio Scaffolding | 2 | 09/26/2024 |
| D&E Refrigeration & Air | 1 | 03/27/2025 |
| Dynamic Sheet Metal | 1 | 01/31/2025 |
| Etna Contracting | 1 | 07/21/2021 |
| Everest Scaffolding | 1 | 02/21/2018 |
| Interboro Sign & Electrical Maintenance | 1 | 07/13/2018 |
| Upright Fire Protctn | 1 | 10/18/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| Nederlander Producing Company | 6 | 03/27/2025 |
| Nederlander | 1 | 02/21/2018 |
| Name | Projects together | Most recent |
|---|---|---|
| Rigid Structural Design | 2 | 09/26/2024 |
| VSA | 2 | 03/27/2025 |
| AE Design Solution | 1 | 02/21/2018 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01174197 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Permit Issued | 03/18/2025 | 02/17/2026 | Design THE VSA GROUP Contractor D&E REFRIGERATION & AIR C Filer VSA | REMOVE EX. 90 TON CHILLER & 2 AIR HANDLERS. INSTALL 2- 60 TON CHILLERS W/ 2 NEW AIR HANDLERS. INSTALL PUMPS W/ PIPING MODIFIACTIONS. INSTAL… |
| M01171511 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Permit Issued | 01/31/2025 | 03/27/2025 | Design MCLAREN ENGINEERING GROUP Contractor DYNAMIC SHEET METAL | structural work including trusses installation for the run of the show REDWOOD at the front of the house as shown on plans filed herewith. N… |
| M01131500 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Signed-off | 10/25/2024 | 11/08/2024 | Design LHOTSE CORP Contractor LHOTSE CORP | Facade Restoration Via Suspended Scaffolding |
| M01117217 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Signed-off | 09/26/2024 | 09/27/2024 | Design ASHRAF CORP Contractor ANDAMIO SCAFFOLDING LLC | Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change … |
| M01117253 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Signed-off | 09/26/2024 | 09/27/2024 | Design ASHRAF CORP Contractor ANDAMIO SCAFFOLDING LLC | Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use… |
| M00555081 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Signed-off | 07/21/2021 | 07/27/2021 | Design THE VSA GROUP Contractor ETNA CONTRACTING INC Filer VSA | Floor slab replacement at Orchestra Level as shown in filed drawings. No change in use, occupancy and egress. |
| M00244125 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Permit Issued | 10/18/2019 | 11/06/2019 | Design CARL GUINTA ASSOCIATES Contractor H.J. FLOOD INC. Filer NYCCODE LLC | Installation of a new stage deluge system that includes 7 new sprinkler heads, deluge valve and control valve for the run of the show LEHMAN… |
| M00044928 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Permit Issued | 07/13/2018 | 07/13/2018 | Design MURDOCH ENGINEERING Contractor INTERBORO SIGN &ELECL MAI | Erect illuminated LEd advertising projecting sign on wall. No change of use, egress or occupancy. Structure filed under separate application |
| M00020900 ↗ | 208 WEST 41ST STREET MANHATTAN | Alteration | Signed-off | 02/21/2018 | 04/03/2018 | Design BAILEYS ENGINEERING PC Owner NEDERLANDER Contractor EVEREST SCAFFOLDING INC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Building | Filings | Most Recent |
|---|---|---|
| 208 WEST 41ST STREET ↗ | 9 | 03/27/2025 |