Back
Tenant
New Auto Paint Mixing & Equipment Co
Tenant
BROOKLYN · 2
1 building
2
Total Filings
2
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Signed off2100%
By project type
Alteration2
Most active buildings
All buildings →
102 HUNTINGTON STREETBROOKLYN · latest 03/10/2023
2 projects
Key relationships
Everyone →
Design firms
Contractors
Owners
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B00775554 ↗102 HUNTINGTON STREET
BROOKLYN
AlterationSigned-off07/28/202203/10/2023INSTALLATION AND ASSEMBLY OF PAINT SPRAY BOOTH AND INSTALLATION OF (3) GAS SPACE HEATERS
B00775627 ↗102 HUNTINGTON STREET
BROOKLYN
AlterationSigned-off07/28/202202/10/2023INSTALLATION OF (3) GAS SPACE HEATERS AND INSTALLATION OF SPRINKLER HEADS FOR SPRAY BOOTH
Counts cover all 2 projects (2 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Draft Master Engineering207/27/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Bypass Mechanical106/22/2023
Liberty NY Restoration107/27/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Huntington St Holding207/27/2023
2 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 2Signed off 2
2 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B00775554 ↗102 HUNTINGTON STREET
BROOKLYN
AlterationSigned-off07/28/202203/10/2023INSTALLATION AND ASSEMBLY OF PAINT SPRAY BOOTH AND INSTALLATION OF (3) GAS SPACE HEATERS
B00775627 ↗102 HUNTINGTON STREET
BROOKLYN
AlterationSigned-off07/28/202202/10/2023INSTALLATION OF (3) GAS SPACE HEATERS AND INSTALLATION OF SPRINKLER HEADS FOR SPRAY BOOTH
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
102 HUNTINGTON STREET ↗207/27/2023
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B00775554-P1 · 102 HUNTINGTON STREETOpen ↗
09/01/2026B00775554-P1 · 102 HUNTINGTON STREETOpen ↗
09/01/2026B00775554-P1 · 102 HUNTINGTON STREETOpen ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00775554-P1 · 102 HUNTINGTON STREETOpen ↗
09/01/2026B00775554-P1 · 102 HUNTINGTON STREETOpen ↗
08/26/2026B00775627-P1 · 102 HUNTINGTON STREETOpen ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026B00775554-P1 · 102 HUNTINGTON STREETOpen ↗
08/29/2026B00775554-I1 · 102 HUNTINGTON STREETOpen ↗
08/29/2026B00775627-P1 · 102 HUNTINGTON STREETOpen ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026B00775554-P1 · 102 HUNTINGTON STREETOpen ↗
08/29/2026B00775627-P1 · 102 HUNTINGTON STREETOpen ↗
08/15/2026B00775627-I1 · 102 HUNTINGTON STREETOpen ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type