| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| S01251733 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 08/18/2025 | 10/17/2025 | Contractor EMES SOLAR INC | INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK |
| S00711007 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 04/08/2022 | 02/25/2025 | Design HANSEN ENGINEERING, PC Owner NEW WORLD PREP Contractor SISCA NORTHEAST ASSOCIATE Filer EA DESIGN GROUP, INC. | Application filed for underpinning as per plans filed herewith |
| S00895612 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 07/19/2023 | 02/13/2025 | Design HANSEN ENGINEERING, PC Owner NEW WORLD PREP Contractor SISCA NORTHEAST ASSOCIATE | INSTALLATION OF UNDERGROUND FUEL STORAGE TANK AND ASSOCIATED FUEL OIL PIPING |
| S00885690 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Permit Issued | 08/18/2023 | 02/12/2025 | Owner NEW WORLD PREP Contractor SISCA NORTHEAST ASSOCIATE | Proposed 21' curb cut |
| S00885718 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Permit Issued | 08/18/2023 | 02/12/2025 | Owner NEW WORLD PREP Contractor SISCA NORTHEAST ASSOCIATE | Proposed 21' curb cut |
| S00902043 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Permit Issued | 08/18/2023 | 02/12/2025 | Owner NEW WORLD PREP Contractor SISCA NORTHEAST ASSOCIATE | Proposed 25'- 10 curb cut. |
| Name | Projects together | Most recent |
|---|---|---|
| Rampulla Associate Architects | 4 | 05/06/2025 |
| Ashraf | 3 | 04/27/2023 |
| Hansen Engineering | 3 | 01/12/2024 |
| Project Tactical Solutions | 3 | 04/14/2022 |
| KZ Engineering | 2 | 02/07/2024 |
| Babylon Eco-Construction | 1 | 08/18/2025 |
| Cameron Engineering | 1 | 05/06/2025 |
| Ospino Engineering | 1 | 06/10/2022 |
| Patuxent Engineering | 1 | 07/24/2024 |
| Zee Structural Engineering | 1 | 05/06/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Sisca Northeast Associate | 9 | 05/06/2025 |
| Vanquish Group | 3 | 04/14/2022 |
| SRCC | 2 | 02/07/2024 |
| Advanced Scaffold Services | 1 | 07/24/2024 |
| Arsenal Scaffold | 1 | 04/27/2023 |
| David Constructing NY | 1 | 01/12/2024 |
| DHS Fraco | 1 | 02/08/2022 |
| Donato | 1 | 05/06/2025 |
| Emes Solar | 1 | 08/18/2025 |
| Fluid Mechanics | 1 | 05/06/2025 |
| Regal Reconstruction | 1 | 09/22/2021 |
| Stuart N Schwartz | 1 | 01/12/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| New World Prep | 14 | 05/06/2025 |
| DHS Fraco | 1 | 02/08/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| Rampulla Associates Architects | 4 | 05/06/2025 |
| EA Design Group | 3 | 07/08/2022 |
| KD Designs | 3 | 04/27/2023 |
| Synergy Building Consultants | 2 | 02/07/2024 |
| Haider Engineering, P.E | 1 | 04/14/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| S01251733 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 08/18/2025 | 10/17/2025 | Contractor EMES SOLAR INC | INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK |
| S00711007 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 04/08/2022 | 02/25/2025 | Design HANSEN ENGINEERING, PC Owner NEW WORLD PREP Contractor SISCA NORTHEAST ASSOCIATE Filer EA DESIGN GROUP, INC. | Application filed for underpinning as per plans filed herewith |
| S00895612 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 07/19/2023 | 02/13/2025 | Design HANSEN ENGINEERING, PC Owner NEW WORLD PREP Contractor SISCA NORTHEAST ASSOCIATE | INSTALLATION OF UNDERGROUND FUEL STORAGE TANK AND ASSOCIATED FUEL OIL PIPING |
| S00885690 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Permit Issued | 08/18/2023 | 02/12/2025 | Owner NEW WORLD PREP Contractor SISCA NORTHEAST ASSOCIATE | Proposed 21' curb cut |
| S00885718 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Permit Issued | 08/18/2023 | 02/12/2025 | Owner NEW WORLD PREP Contractor SISCA NORTHEAST ASSOCIATE | Proposed 21' curb cut |
| S00902043 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Permit Issued | 08/18/2023 | 02/12/2025 | Owner NEW WORLD PREP Contractor SISCA NORTHEAST ASSOCIATE | Proposed 25'- 10 curb cut. |
| S00463244 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 03/10/2021 | 12/26/2024 | Design CAMERON ENGINEERING Owner NEW WORLD PREP Contractor SISCA NORTHEAST ASSOCIATE | Subsequent Structural to Proposed addition to an existing school building |
| S01075985 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 07/24/2024 | 07/25/2024 | Design PATUXENT ENGINEERING LLC Contractor ADVANCED SCAFFOLD SER.LLC | INSTALLATION OF SUPPORTED SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. |
| S00865388 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 04/27/2023 | 04/09/2024 | Design ASHRAF CORP Owner NEW WORLD PREP Contractor ARSENAL SCAFFOLD INC Filer KD DESIGNS | INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCU… |
| S00842610 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 03/13/2023 | 03/20/2024 | Design ASHRAF CORP Owner NEW WORLD PREP Contractor SISCA NORTHEAST ASSOCIATE Filer KD DESIGNS | INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL CO… |
| S00867799 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 05/30/2023 | 11/15/2023 | Design KZ ENGINEERING, P.C Owner NEW WORLD PREP Contractor SRCC CORP | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg… |
| S00671309 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 02/08/2022 | 11/14/2023 | Design ASHRAF CORP Owner DHS FRACO LLC Contractor SISCA NORTHEAST ASSOCIATE Filer KD DESIGNS | INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL CO… |
| S00875254 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 06/05/2023 | 06/05/2023 | Design KZ ENGINEERING, P.C Owner NEW WORLD PREP Contractor SRCC CORP | Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in u… |
| S00771517 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 07/08/2022 | 02/24/2023 | Design HANSEN ENGINEERING, PC Owner NEW WORLD PREP Contractor SISCA NORTHEAST ASSOCIATE Filer EA DESIGN GROUP, INC. | Application filed for support of excavation to related underpinning application # S00711007-I1 as per plans filed herewith. |
| S00752794 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Filed — no permit on record | 06/10/2022 | — | Design OSPINO ENGINEERING PLLC Owner NEW WORLD PREP Filer EA DESIGN GROUP, INC. | — |
| S00659820 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 01/14/2022 | 01/27/2022 | Owner NEW WORLD PREP Contractor VANQUISH GROUP INC Filer HAIDER ENGINEERING, P.E. | Demolition of Structural and Non-Structural Elements in Existing Structure. Filing in Conjunction with Primary Alteration Application: 52046… |
| S00592980 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 10/19/2021 | 10/22/2021 | Contractor VANQUISH GROUP INC | Interior Demolition of Non-Structural Elements in Existing Structure. Filing in Conjunction with Primary Alteration Application: 520460279. |
| S00348431 | 26 SHARPE AVENUE STATEN ISLAND | Alteration | Signed-off | 07/20/2020 | 09/25/2021 | Owner NEW WORLD PREP Contractor VANQUISH GROUP INC Filer HAIDER ENGINEERING, P.E. | A CONSTRUCTION FENCE SHALL BE ERECTED AROUND THE PROPERTY LINE SPANNING MORE THAN 3'-0 BEYOND THE PROPERTY LINE. PROJECT IS IN CONJUNCTION W… |
| Building | Filings | Most Recent |
|---|---|---|
| 26 SHARPE AVENUE ↗ | 18 | 08/18/2025 |