| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00757421 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 06/15/2022 | 08/18/2026 | Contractor EXTERIOR WALL & BUILDING | INSTALLATION OF TEMPORARY SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH CHOATER 33 OF THE NYC BC.… |
| M01003832 | 1086 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/12/2024 | 05/19/2026 | Design STRUCTUAL PRESV SYSTEM Contractor STRUCTUAL PRESV SYSTEM | FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Prim… |
| M01379826 | 100 EAST 77TH STREET MANHATTAN | Alteration | Permit Issued | 04/21/2026 | 05/14/2026 | Design LIZARDOS ENGINEERING Contractor L.F. DRISCOLL COMPANY LLC | Northwell Lenox Hill: HVAC upgrades for Central Sterile Supply area, as per plans filed herewith. |
| M01379851 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 04/17/2026 | 05/12/2026 | Design GILSANZ MURRAY STEFICEK LLP Contractor L.F. DRISCOLL COMPANY LLC Filer UPRIGHT EXPEDITERS, INC. | Northwell Lenox Hill: minor Structural scope in conjunction with Central Sterile HVAC upgrades. |
| M01379825 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 04/20/2026 | 05/11/2026 | Contractor L.F. DRISCOLL COMPANY LLC Filer UPRIGHT EXPEDITERS, INC. | Northwell Lenox Hill: minor architectural scope in conjunction with Central Sterile Supply HVAC upgrades, as per plans filed herewith. No ch… |
| M01390346 | 100 EAST 77TH STREET MANHATTAN | Alteration | Permit Issued | 04/27/2026 | 05/04/2026 | Design LIZARDOS ENGINEERING Contractor L.F. DRISCOLL COMPANY LLC Filer UPRIGHT EXPEDITERS, INC. | Northwell Lenox Hill Chiller # 2 and # 3 Replacement Project: rearrange interior, non-bearing partition(s), install hung ceiling, wall and f… |
| Name | Projects together | Most recent |
|---|---|---|
| Lizardos Engineering | 5 | 04/27/2026 |
| Gilsanz Murray Steficek | 3 | 04/17/2026 |
| Structural Preservation System | 3 | 02/16/2024 |
| Enthink Engineers | 2 | 10/25/2023 |
| H.F. Lenz Company | 2 | 12/22/2021 |
| Jaros Baum & Bolles | 2 | 09/26/2025 |
| Merritt Engineering Consultants | 2 | 05/13/2024 |
| Pamela A. Smith | 2 | 10/13/2022 |
| Patuxent Engineering | 2 | 09/15/2021 |
| Tohfaz Uddin PE | 2 | 07/15/2019 |
| FL&M Engineering Design & Inspection | 1 | 06/15/2022 |
| Leon Skvirsky PE | 1 | 01/05/2026 |
| Mascioni & Behrmann, Architecture | 1 | 04/20/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Central Consulting & Cont | 4 | 10/17/2022 |
| L.F. Driscoll Company | 4 | 04/27/2026 |
| Capital Contracting P&H | 3 | 08/29/2023 |
| Manhattan D Enterprises | 3 | 06/15/2022 |
| Empire General Contracting | 2 | 09/26/2025 |
| Kaufman Manufacturing Group | 2 | 05/13/2024 |
| MNK Enterprises NY | 2 | 10/25/2023 |
| York Scaffold Equipment | 2 | 07/15/2019 |
| Aljer Plumbing & Heating | 1 | 12/22/2021 |
| Alliance Plumbing | 1 | 01/19/2022 |
| Brosna Construction | 1 | 01/12/2022 |
| Exterior Wall & Building | 1 | 06/15/2022 |
| FM95 NY | 1 | 01/05/2026 |
| Park Contracting Group | 1 | 10/25/2023 |
| Structural Preservation System | 1 | 02/12/2024 |
| Urban Intelligence | 1 | 06/15/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| Northwell Health Lenox Hill Hospita | 8 | 04/27/2026 |
| Northwell Health | 6 | 05/13/2024 |
| MNK Enterprises NY | 1 | 10/25/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Upright Expediters | 6 | 04/27/2026 |
| Smep Design & Consultation | 3 | 02/16/2024 |
| Support Buildings of New York | 3 | 08/29/2023 |
| Merritt Engineering Consultant | 2 | 05/13/2024 |
| Direct Access Expediting | 1 | 12/22/2021 |
| Patuxent Engineering | 1 | 09/15/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00757421 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 06/15/2022 | 08/18/2026 | Contractor EXTERIOR WALL & BUILDING | INSTALLATION OF TEMPORARY SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH CHOATER 33 OF THE NYC BC.… |
| M01003832 | 1086 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/12/2024 | 05/19/2026 | Design STRUCTUAL PRESV SYSTEM Contractor STRUCTUAL PRESV SYSTEM | FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Prim… |
| M01379826 | 100 EAST 77TH STREET MANHATTAN | Alteration | Permit Issued | 04/21/2026 | 05/14/2026 | Design LIZARDOS ENGINEERING Contractor L.F. DRISCOLL COMPANY LLC | Northwell Lenox Hill: HVAC upgrades for Central Sterile Supply area, as per plans filed herewith. |
| M01379851 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 04/17/2026 | 05/12/2026 | Design GILSANZ MURRAY STEFICEK LLP Contractor L.F. DRISCOLL COMPANY LLC Filer UPRIGHT EXPEDITERS, INC. | Northwell Lenox Hill: minor Structural scope in conjunction with Central Sterile HVAC upgrades. |
| M01379825 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 04/20/2026 | 05/11/2026 | Contractor L.F. DRISCOLL COMPANY LLC Filer UPRIGHT EXPEDITERS, INC. | Northwell Lenox Hill: minor architectural scope in conjunction with Central Sterile Supply HVAC upgrades, as per plans filed herewith. No ch… |
| M01390346 | 100 EAST 77TH STREET MANHATTAN | Alteration | Permit Issued | 04/27/2026 | 05/04/2026 | Design LIZARDOS ENGINEERING Contractor L.F. DRISCOLL COMPANY LLC Filer UPRIGHT EXPEDITERS, INC. | Northwell Lenox Hill Chiller # 2 and # 3 Replacement Project: rearrange interior, non-bearing partition(s), install hung ceiling, wall and f… |
| M01333902 | 130 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 01/05/2026 | 01/30/2026 | Design LEON SKVIRSKY PE Contractor RED HOOK SIGN AND ELECT | NON-ILLUMINATED NON-ADVERTISING ACCESSORY BANNER FOR A COMMUNITY USE FACILITY - IN PROPERTY LINES - LENOX HILL HOSPITAL. NO CHANGE OF USE, E… |
| M00628021 | 100 EAST 77TH STREET MANHATTAN | Alteration | Permit Issued | 01/19/2022 | 12/10/2025 | Design JAROS BAUM & BOLLES Contractor CARDOZA PLUMBING WMBE Filer UPRIGHT EXPEDITERS, INC. | Lenox Hill Hospital Lachman 5th Floor Emergency Power project: modify plumbing & sprinkler systems to conform with interior renovations as p… |
| M01280595 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 09/26/2025 | 11/05/2025 | Design JAROS BAUM & BOLLES Contractor EMPIRE GENERAL CONTRACTIN Filer UPRIGHT EXPEDITERS, INC. | Lenox Hill Hospital: replacement in kind of Chiller in conjunction with hospital MRI, as per plans filed herewith. |
| M00952420 | 120 EAST 77TH STREET MANHATTAN | Alteration | Permit Issued | 10/25/2023 | 07/28/2025 | Design ENTHINK ENGINEERS LLC Owner MNK ENTERPRISES NY INC Contractor MNK ENTERPRISES NY INC | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAP… |
| M00951470 | 130 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 10/24/2023 | 10/23/2024 | Design ENTHINK ENGINEERS LLC Contractor MNK ENTERPRISES NY INC | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAP… |
| M01059515 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 06/07/2024 | 06/10/2024 | Design GILSANZ MURRAY STEFICEK LLP Contractor EMPIRE GENERAL CONTRACTIN | Lenox Hill Hospital Wollman/Lachman: removal of interior, non-bearing partition at portion of 4th floor, as per plans filed herewith. No cha… |
| M01003833 | 120 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 02/16/2024 | 03/08/2024 | Design STRUCTUAL PRESV SYSTEM Contractor STRUCTUAL PRESV SYSTEM | FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Prim… |
| M01003834 | 130 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 02/16/2024 | 03/08/2024 | Contractor STRUCTUAL PRESV SYSTEM | FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Prima… |
| M01003835 | 841 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/16/2024 | 03/08/2024 | Contractor STRUCTUAL PRESV SYSTEM | FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Prima… |
| M01003830 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 02/12/2024 | 02/16/2024 | Design STRUCTUAL PRESV SYSTEM Contractor STRUCTUAL PRESV SYSTEM | FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Prima… |
| M01003831 | 111 EAST 76TH STREET MANHATTAN | Alteration | Signed-off | 02/12/2024 | 02/16/2024 | Contractor STRUCTUAL PRESV SYSTEM | FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Prim… |
| M08007104 | 120 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 10/24/2022 | 01/16/2024 | Owner NORTHWELL HEALTH Contractor KAUFMAN MANUFACTURING GRO | Installation of a side mounted railing on existing parapet at 2nd floor set back. No change in use, egress or occupancy. |
| M08007086 | 1086 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 10/24/2022 | 11/13/2023 | Owner NORTHWELL HEALTH Contractor KAUFMAN MANUFACTURING GRO | Installation of a side mounted railing on existing parapet at 10th floor roof. No change in use, egress or occupancy. |
| M00463957 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 02/22/2021 | 11/09/2022 | Design H.F. LENZ COMPANY Contractor CAPITAL CONTR P&H CORP | PLUMBING & PIPING ASSOCIATED WITH BULK OXYGEN SYSTEM UPGRADES AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. |
| M00630140 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 01/12/2022 | 11/09/2022 | Design PAMELA A. SMITH Contractor BROSNA CONSTRUCTION CORPO Filer UPRIGHT EXPEDITERS, INC. | Lenox Hill Hospital Lachman 5th floor Emergency Power Project: rearrange interior, non-bearing partitions, install wall and floor finishes, … |
| M08011173 | 130 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 10/17/2022 | 11/09/2022 | Design GILSANZ MURRAY STEFICEK LLP Contractor CENTRAL CONSULTING & CONT | Structural work associated with LINAC Replacement. Concrete slab, steel support for the equipment No change in use egress or occupancy. |
| M08011695 | 130 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 10/14/2022 | 10/31/2022 | Design LIZARDOS ENGINEERING Contractor CENTRAL CONSULTING & CONT | Linear Accelerator Equipment Replacement No change in use or egress |
| M08011154 | 130 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 10/04/2022 | 10/26/2022 | Design PAMELA A. SMITH Owner NORTHWELL HEALTH Contractor CENTRAL CONSULTING & CONT | General construction work associated with LINAC Replacement. No change in use egress or occupancy MH, ST an PL SP work associated with the L… |
| M08011716 | 130 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 10/13/2022 | 10/20/2022 | Design LIZARDOS ENGINEERING Owner NORTHWELL HEALTH Contractor CAPITAL CONTR P & H CORP | Relocate 4 sprinkler heads within therapy vault. No change in use or egress |
| M08011747 | 130 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 10/13/2022 | 10/20/2022 | Design LIZARDOS ENGINEERING Owner NORTHWELL HEALTH Contractor CAPITAL CONTR P&H CORP | Pluming work associated with Linear Accelerator Equipment Replacement No change in use or egress. |
| M00463948 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 02/22/2021 | 03/18/2022 | Design H.F. LENZ COMPANY Contractor CENTRAL CONSULTING & CONT | GENERAL CONSTRUCTION & STRUCTURAL ALTERATIONS IN CONNECTION WITH BULK OXYGEN SYSTEM UPGRADES AS PER PLANS. NO CHANGE TO EGRESS, USE, OR OCC… |
| M00591860 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 09/13/2021 | 09/14/2021 | Design PATUXENT ENGINEERING LLC Owner NORTHWELL HEALTH Contractor MANHATTAN D ENTERPRISES | INSTALLATION OF TEMPORARY SUPPORT FOR O2 SUPPLY LINES OVER SIDEWALK TO REMOVE ANY PEDESTRIAN OBSTRUCTIONS AND PROVIDE PROTECTION FOR EXISTIN… |
| M00432651 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 11/30/2020 | 11/30/2020 | Design PATUXENT ENGINEERING LLC Contractor MANHATTAN D ENTERPRISES | INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH NYCC 2014 CHAPTER 33 . NO CHANGE IN… |
| M00184916 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 07/15/2019 | 07/19/2019 | Design TOHFAZ UDDIN PE PC Contractor YORK SCAFFOLD EQUIPMENT CORP. | INSTALLATION OF SYSTEM SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANC… |
| M00184891 | 100 EAST 77TH STREET MANHATTAN | Alteration | Signed-off | 07/02/2019 | 07/02/2019 | Design TOHFAZ UDDIN PE PC Contractor YORK SCAFFOLD EQUIPMENT CORP. | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NY… |
| Building | Filings | Most Recent |
|---|---|---|
| 100 EAST 77TH STREET ↗ | 16 | 04/27/2026 |
| 130 EAST 77TH STREET ↗ | 8 | 01/05/2026 |
| 1086 LEXINGTON AVENUE ↗ | 2 | 05/13/2024 |
| 120 EAST 77TH STREET ↗ | 3 | 02/16/2024 |
| 841 PARK AVENUE ↗ | 1 | 02/16/2024 |
| 111 EAST 76TH STREET ↗ | 1 | 02/12/2024 |