| B00838825 | 111 BERRIMAN STREET BROOKLYN | Alteration | Signed-off | 03/06/2023 | 01/02/2025 | Design SOLID ENGINEERING PC Contractor SH 5 CONSTRUCTION CORP | SUPPORT OF EXCAVATION TO RUN PERFORATED PIPE FOUNDATION DRAIN ALONG PERIMETER OF THE EXISTING ELEVATOR SHAFT AND ALSO WATERPROOF THE EXTERIO… |
| B00812320 | 111 BERRIMAN STREET BROOKLYN | Alteration | Signed-off | 02/04/2023 | 09/09/2024 | Design SOLID ENGINEERING PC Contractor TOP CITY CONTRACTING CORP | INSTALLATION OF PIPE SCAFFOLD FOR PS 345K AT 111 BERRIMAN STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRES… |
| B00812319 | 111 BERRIMAN STREET BROOKLYN | Alteration | Signed-off | 02/04/2023 | 08/16/2024 | Design SOLID ENGINEERING PC Contractor SH 5 CONSTRUCTION CORP | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 345K AT 111 BERRIMAN STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN… |
| B00812314 | 111 BERRIMAN STREET BROOKLYN | Alteration | Signed-off | 02/04/2023 | 06/01/2023 | Design SOLID ENGINEERING PC Contractor EVERLAST SCAFFOLDING | INSTALLATION OF NEW SIDEWALK SHED FOR PS 345K AT 111 BERRIMAN STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EG… |
| Name | Projects together | Most recent |
|---|---|---|
| Solid Engineering | 4 | 02/13/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| Everlast Scaffolding | 2 | 02/04/2023 |
| SH 5 Construction | 2 | 02/13/2024 |
| Top City Contracting | 1 | 02/04/2023 |
| Tri-State Paving | 1 | 02/13/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| NYC School Construction Authority | 2 | 02/13/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| AK Consulting Services | 1 | 02/04/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00838825 | 111 BERRIMAN STREET BROOKLYN | Alteration | Signed-off | 03/06/2023 | 01/02/2025 | Design SOLID ENGINEERING PC Contractor SH 5 CONSTRUCTION CORP | SUPPORT OF EXCAVATION TO RUN PERFORATED PIPE FOUNDATION DRAIN ALONG PERIMETER OF THE EXISTING ELEVATOR SHAFT AND ALSO WATERPROOF THE EXTERIO… |
| B00812320 | 111 BERRIMAN STREET BROOKLYN | Alteration | Signed-off | 02/04/2023 | 09/09/2024 | Design SOLID ENGINEERING PC Contractor TOP CITY CONTRACTING CORP | INSTALLATION OF PIPE SCAFFOLD FOR PS 345K AT 111 BERRIMAN STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRES… |
| B00812319 | 111 BERRIMAN STREET BROOKLYN | Alteration | Signed-off | 02/04/2023 | 08/16/2024 | Design SOLID ENGINEERING PC Contractor SH 5 CONSTRUCTION CORP | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 345K AT 111 BERRIMAN STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN… |
| B00812314 | 111 BERRIMAN STREET BROOKLYN | Alteration | Signed-off | 02/04/2023 | 06/01/2023 | Design SOLID ENGINEERING PC Contractor EVERLAST SCAFFOLDING | INSTALLATION OF NEW SIDEWALK SHED FOR PS 345K AT 111 BERRIMAN STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EG… |
| Building | Filings | Most Recent |
|---|---|---|
| 111 BERRIMAN STREET ↗ | 4 | 02/13/2024 |