| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01386388 | 1 PACE PLAZA MANHATTAN | Alteration | Permit Issued | 04/24/2026 | 09/29/2026 | Design KOHLER RONAN, LLC Owner PACE UNIVERSITY Contractor PREMIER FIRE SPRNKLR CO Filer WALTER T. GORMAN, PE, PC | PROPOSED NEW STANDPIPE SYSTEM IN STAIR J, STAGE AREA, AND FLOOR, ALL AS PER PLAN. NO CHANGE TO EGRESS, OCCUPANCY, OR USE. |
| M01415541 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 06/24/2026 | 06/25/2026 | Owner PACE UNIVERSITY Contractor PALLADIUM WINDOW SOLUTION | Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy. |
| M01021932 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 04/04/2024 | 04/22/2026 | Design ASHRAF CORP Owner KINGS GROUP NY CORP Contractor KINGS GROUP NY CORP Filer KMA DESIGNS LLC | INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF N… |
| M00907240 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 07/24/2023 | 04/21/2026 | Design KOHLER RONAN, LLC Owner PACE UNIVERSITY Contractor TURNER CONSTRUCTION COMPANY Filer WALTER T. GORMAN, PE, PC | Removal of plumbing fixtures with all related piping, gas appliances removal, cut and cap all the service water, gas and sanitary sewer pipi… |
| M01322205 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 12/10/2025 | 01/08/2026 | Design BEDNASH CONSULTING, INC. Owner PACE UNIVERSITY Contractor JANSONS ASSOICATES, INC | Permanent structural framing and supports for the installation of a kitchen exhaust riser under parent Mechanical Job # M00976708-S4. |
| M00959676 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 11/17/2023 | 01/06/2026 | Design KOHLER RONAN, LLC Contractor RAEL AUTOMATIC SPR.CO INC | Modification of existing standpipe system to Temporary standpipe system during construction, all as per plan. no change of use, egress, or o… |
| Name | Projects together | Most recent |
|---|---|---|
| Kohler Ronan | 7 | 06/09/2026 |
| Brand Access Solutions | 6 | 12/18/2024 |
| JFK & M Consulting Engineers | 4 | 02/12/2025 |
| Fxcollaborative Architects | 3 | 06/09/2026 |
| Douglas P. Gonzalez | 2 | 06/18/2024 |
| James H. Fahey | 2 | 10/04/2023 |
| KZ Engineering | 2 | 05/20/2025 |
| Loci Architecture | 2 | 01/17/2024 |
| Tectonic Engineering | 2 | 03/21/2019 |
| Asda Architecture + Design | 1 | 03/11/2025 |
| Ashraf | 1 | 04/04/2024 |
| Bednash Consulting | 1 | 12/10/2025 |
| Highland Associates | 1 | 06/08/2023 |
| Howard I Shapiro & Associates | 1 | 05/15/2024 |
| KMB Design Group | 1 | 06/13/2022 |
| Leon Skvirsky PE | 1 | 02/11/2019 |
| Lombardo Professional Engineering | 1 | 06/24/2026 |
| Mohammad Ahead, PE | 1 | 05/09/2023 |
| PS Engineers | 1 | 06/19/2025 |
| Reuther Bowen | 1 | 10/01/2019 |
| Tarek M. Zeid, PE | 1 | 06/24/2026 |
| The MTM Design Group | 1 | 02/15/2021 |
| VS Consulting Engineering | 1 | 06/09/2026 |
| Ysrael A. Seinuk | 1 | 02/13/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| Safway Atlantic | 6 | 12/18/2024 |
| Turner Construction Company | 5 | 06/09/2026 |
| Almar Plumbing & Heating | 3 | 06/09/2026 |
| Kings Group NY | 3 | 05/20/2025 |
| Premier Fire Sprinkler Co | 3 | 06/09/2026 |
| Rael Automatic Sprinkler Co | 3 | 05/14/2026 |
| Jansons Assoicates | 2 | 06/09/2026 |
| Tribute Restoration | 2 | 01/17/2024 |
| Arsenal Scaffold | 1 | 05/20/2024 |
| Ashlar Mechanical | 1 | 06/08/2023 |
| Benchmark Builders | 1 | 06/08/2023 |
| Comcell Construction | 1 | 09/18/2018 |
| Domum | 1 | 06/19/2025 |
| Eighty Seven Develpmt | 1 | 10/04/2023 |
| Five Town Neon Sign Co | 1 | 02/11/2019 |
| J.V.S. Contracting Group | 1 | 10/01/2019 |
| KMM Telecommunications | 1 | 10/04/2023 |
| L.e.c.inc | 1 | 02/15/2021 |
| Levest Electric | 1 | 03/21/2019 |
| Mac Felder | 1 | 02/18/2020 |
| Manengeering Bureau | 1 | 08/21/2021 |
| Metro RF Services | 1 | 01/29/2018 |
| Pace Plumbing | 1 | 02/12/2025 |
| Palladium Window Solution | 1 | 06/24/2026 |
| PTS Data Center Solution* | 1 | 06/01/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Pace University | 22 | 06/24/2026 |
| Kings Group NY | 3 | 05/20/2025 |
| Safway Atlantic | 3 | 12/18/2024 |
| AT&T Mobility | 1 | 03/21/2019 |
| Safway Atlantic | 1 | 02/10/2020 |
| T-Mobile | 1 | 06/13/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| Walter T. Gorman, PE | 9 | 06/09/2026 |
| A1 Expediting Service | 3 | 12/18/2024 |
| Synergy Building Consultants | 2 | 05/20/2025 |
| Arsenal Building Consultants | 1 | 05/09/2023 |
| Building Brothers | 1 | 02/11/2019 |
| CCM Consulting Group | 1 | 03/21/2019 |
| Construction Permit Services | 1 | 02/15/2021 |
| GC1 Expediting | 1 | 06/13/2022 |
| Howard I. Shapiro & Associates | 1 | 05/15/2024 |
| JMV Associates | 1 | 06/24/2026 |
| Kma Designs | 1 | 04/04/2024 |
| Lombardo Building Consultants | 1 | 06/24/2026 |
| PS Engineers | 1 | 06/19/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01386388 | 1 PACE PLAZA MANHATTAN | Alteration | Permit Issued | 04/24/2026 | 09/29/2026 | Design KOHLER RONAN, LLC Owner PACE UNIVERSITY Contractor PREMIER FIRE SPRNKLR CO Filer WALTER T. GORMAN, PE, PC | PROPOSED NEW STANDPIPE SYSTEM IN STAIR J, STAGE AREA, AND FLOOR, ALL AS PER PLAN. NO CHANGE TO EGRESS, OCCUPANCY, OR USE. |
| M01415541 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 06/24/2026 | 06/25/2026 | Owner PACE UNIVERSITY Contractor PALLADIUM WINDOW SOLUTION | Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy. |
| M01021932 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 04/04/2024 | 04/22/2026 | Design ASHRAF CORP Owner KINGS GROUP NY CORP Contractor KINGS GROUP NY CORP Filer KMA DESIGNS LLC | INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF N… |
| M00907240 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 07/24/2023 | 04/21/2026 | Design KOHLER RONAN, LLC Owner PACE UNIVERSITY Contractor TURNER CONSTRUCTION COMPANY Filer WALTER T. GORMAN, PE, PC | Removal of plumbing fixtures with all related piping, gas appliances removal, cut and cap all the service water, gas and sanitary sewer pipi… |
| M01322205 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 12/10/2025 | 01/08/2026 | Design BEDNASH CONSULTING, INC. Owner PACE UNIVERSITY Contractor JANSONS ASSOICATES, INC | Permanent structural framing and supports for the installation of a kitchen exhaust riser under parent Mechanical Job # M00976708-S4. |
| M00959676 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 11/17/2023 | 01/06/2026 | Design KOHLER RONAN, LLC Contractor RAEL AUTOMATIC SPR.CO INC | Modification of existing standpipe system to Temporary standpipe system during construction, all as per plan. no change of use, egress, or o… |
| M00976708 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 12/18/2023 | 01/06/2026 | Design KOHLER RONAN, LLC Owner PACE UNIVERSITY Contractor TURNER CONSTRUCTION COMPANY Filer WALTER T. GORMAN, PE, PC | Proposed to modify existing HVAC system and install new HVAC units and exhaust system with associate piping and ducts all as per plan. No ch… |
| M00960574 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 12/18/2023 | 10/21/2025 | Owner PACE UNIVERSITY Contractor TURNER CONSTRUCTION COMPANY Filer WALTER T. GORMAN, PE, PC | Proposed Interior structural modification, new foundation all as per plan. No change of egress, occupancy or use. |
| M00954692 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 10/30/2023 | 09/26/2025 | Design BRAND ACCESS SOLUTIONS Owner SAFWAY ATLANTIC, LLC Contractor SAFWAY ATLANTIC, LLC | CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER T… |
| M00960073 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 11/08/2023 | 09/26/2025 | Design BRAND ACCESS SOLUTIONS Owner SAFWAY ATLANTIC, LLC Contractor SAFWAY ATLANTIC, LLC | TEMPORARY OVERHEAD PROTECTION DURING BLDG ALTERATION, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN US… |
| M01142428 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 11/14/2024 | 09/26/2025 | Design BRAND ACCESS SOLUTIONS Owner SAFWAY ATLANTIC, LLC Contractor SAFWAY ATLANTIC, LLC | TEMPORARY QUIK DECK PLATFORM AS PER DRAWINGS. QUICK DECK PLATFORM SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, … |
| M01234767 | 1 PACE PLAZA MANHATTAN | Alteration | Permit Issued | 06/04/2025 | 08/11/2025 | Design TAREK M. ZEID, PE, PLLC Owner PACE UNIVERSITY Contractor SERVICE SIGN ERECTORS CO Filer JMV ASSOCIATES LLC | STRUCTURAL APPLICATION FOR PROPOSED INSTALLATION OF A NON-ILLUMINATED BANNER ACCESSORY BUSINESS SIGN (56'-6 X 54'-5) WALL MOUNTED, ACCESSORY… |
| M01215384 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 05/20/2025 | 06/05/2025 | Design KZ ENGINEERING, P.C Owner KINGS GROUP NY CORP Contractor KINGS GROUP NY CORP | Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in u… |
| M00930848 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 01/17/2024 | 05/15/2025 | Design LOCI ARCHITECTURE PLLC Owner PACE UNIVERSITY Contractor TRIBUTE RESTORATION INC Filer WALTER T. GORMAN, PE, PC | Proposed facade repair as per plan for East building and Tower. No change of use, egress or occupancy. |
| M01036881 | 1 PACE PLAZA MANHATTAN | Alteration | Permit Issued | 05/20/2024 | 05/15/2025 | Design PS ENGINEERS, INC. Owner PACE UNIVERSITY Contractor TRIBUTE RESTORATION INC Filer PS ENGINEERS INC | File-SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION. |
| M01183379 | 1 PACE PLAZA MANHATTAN | Alteration | Filed — no permit on record | 03/11/2025 | — | Design ASDA ARCHITECTURE + DESIGN | — |
| M00997698 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 02/02/2024 | 02/19/2025 | Owner PACE UNIVERSITY Contractor TITAN INDUSTRIAL SVC CORP | USE OF MECHANICAL DEMO EQUIPMENT DURING PARTIAL DEMO, FILED SEPARATELY UNDER M00997698-I1. |
| M01074187 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 07/22/2024 | 12/09/2024 | Design BRAND ACCESS SOLUTIONS Contractor SAFWAY ATLANTIC, LLC | INSTALLATION OF DUAL 7000# CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG ALTERATION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC B… |
| M00920573 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 09/08/2023 | 10/04/2024 | Design DOUGLAS P. GONZALEZ Owner PACE UNIVERSITY Contractor TURNER CONSTRUCTION COMPANY Filer WALTER T. GORMAN, PE, PC | Removal of existing stairs and stringer in Stairwell J for future construction. No change to use, occupancy or egress. |
| M01076111 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 08/14/2024 | 08/15/2024 | Design JFK&M CONSULTING ENGINEERS Contractor MANENGEERING BUREAU, INC | Proposed Sprinkler System in Mechanical room on the 4th floor, all as per plan. No change of use, occupancy or egress. |
| M01050168 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 05/20/2024 | 05/22/2024 | Design KZ ENGINEERING, P.C Owner PACE UNIVERSITY Contractor ARSENAL SCAFFOLD INC | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg… |
| M00223996 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 07/29/2020 | 04/17/2024 | Design JAMES H. FAHEY Owner PACE UNIVERSITY Contractor KMM TELECOMMUNICATIONS | Modification to existing VERIZON site on the roof. Replacement of (11) antennas, (3) distribution boxes and (12) RRH units. Installation of … |
| M00919640 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 09/08/2023 | 03/14/2024 | Design KOHLER RONAN, LLC Contractor ALMAR PLUMBING & HTG CORP | Cut /cap/remove existing sprinkler. storm and sanitary piping and sewage ejector pump, Steam WH and house pumps within mechanical room in ce… |
| M00919590 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 09/07/2023 | 10/20/2023 | Design KOHLER RONAN, LLC Owner PACE UNIVERSITY Contractor TURNER CONSTRUCTION COMPANY Filer WALTER T. GORMAN, PE, PC | Cut and remove existing mechanical duct work in cellar, all as per plan. No change of use or egress or occupancy. |
| M00880047 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 06/01/2023 | 09/06/2023 | Design KOHLER RONAN, LLC Owner PACE UNIVERSITY Contractor PTS DATA CENTER SOLUTION* Filer WALTER T. GORMAN, PE, PC | Install colling units in existing MDF room on 2nd floor with condensing units on roof. No change to use, occupancy or use. |
| M00882109 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 06/08/2023 | 06/30/2023 | Design HIGHLAND ASSOCIATES Owner PACE UNIVERSITY Contractor BENCHMARK BUILDERS LLC Filer WALTER T. GORMAN, PE, PC | Proposed modification of sprinkler heads within partial 2nd and third floor, all as per plans. No change to use, occupancy or egress. |
| M00656814 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 03/04/2022 | 05/12/2023 | Design LOCI ARCHITECTURE PLLC Contractor TRIBUTE RESTORATION INC | Proposed facade repair as per plan. No change of use, egress or occupancy. |
| M00871678 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 05/09/2023 | 05/09/2023 | Design MOHAMMAD AHEAD, PE Owner KINGS GROUP NY CORP Contractor KINGS GROUP NY CORP | INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF N… |
| M00741662 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 06/13/2022 | 06/23/2022 | Design KMB DESIGN GROUP, LLC Owner T-MOBILE Contractor SQUAN CONSTRUCTION SERVIC Filer GC1 EXPEDITING LLC | Carrier: Sprint & CW. Decom of existing telecom equipment. Removal of equipment on roof and utility disconnect in the basement. Initial inst… |
| M00568121 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 08/03/2021 | 08/03/2021 | Design BRAND ACCESS SOLUTIONS Contractor SAFWAY ATLANTIC, LLC | INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS … |
| M00274343 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 02/27/2020 | 06/02/2021 | Design JFK&M CONSULTING ENGINEERS Owner PACE UNIVERSITY Contractor MANENGEERING BUREAU INC Filer WALTER T. GORMAN, PE, PC | Modification to existing sprinkler system as per plan. No change in use, occupancy and egress. |
| M00277477 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 02/24/2020 | 03/30/2021 | Design JFK&M CONSULTING ENGINEERS Owner PACE UNIVERSITY Contractor SHAWMUT WOODWORKING & SUPPLY Filer WALTER T. GORMAN, PE, PC | Modification of existing mechanical system on 4th, 5th, 6th and roof as per plan. No change to use, occupancy or egress |
| M00458818 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 02/15/2021 | 03/08/2021 | Design THE MTM DESIGN GROUP, LLC Owner PACE UNIVERSITY Contractor L.E.C.INC | DECOMMISSION OF EXISTING NYCWIN TELECOM SITE. REMOVE ALL ANTENNAS AND EQUIPMENT FROM THE PENTHOUSE AND ROOF. NO CHANGE IN USE, EGRESS OR OCC… |
| M00274507 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 02/18/2020 | 10/27/2020 | Design JFK&M CONSULTING ENGINEERS Contractor MAC FELDER INC | Removal and Installation of plumbing fixtures. No change in use, occupancy or egress |
| M00311930 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 02/10/2020 | 09/22/2020 | Design BRAND ACCESS SOLUTIONS Owner SAFWAY ATLANTIC LLC Contractor SAFWAY ATLANTIC, LLC | INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EG… |
| M00277916 | 1 PACE PLAZA MANHATTAN | Alteration | Filed — no permit on record | 02/13/2020 | — | Design YSRAEL A. SEINUK, P.C. Owner PACE UNIVERSITY Filer WALTER T. GORMAN, PE, PC | — |
| M00202319 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 10/01/2019 | 11/06/2019 | Design REUTHER BOWEN Owner PACE UNIVERSITY Contractor J.V.S. CONTRACTING GROUP Filer WALTER T. GORMAN, PE, PC | Re-installation of the existing Pace University letters on the exterior wall with new support anchorage. No change to use, occupancy or use. |
| M00100710 | 1 PACE PLAZA MANHATTAN | Alteration | Permit Issued | 03/21/2019 | 04/18/2019 | Design TECTONIC ENGINEERING Owner AT&T MOBILITY Contractor LEVEST ELECTRIC CORP | AT&T - Modification to existing telecommunication facility. Removal of existing telecommunication equipment cabinets on existing equipment p… |
| M00117610 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 02/11/2019 | 03/14/2019 | Design LEON SKVIRSKY PE Owner PACE UNIVERSITY Contractor ENRICO PASSARO Filer BUILDING BROTHERS INC. | INSTALL NON-ILLUMINATED WALL SIGN (PACE UNIVERSITY) |
| M00064890 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 09/18/2018 | 01/09/2019 | Design JAMES H. FAHEY Contractor COMCELL CONSTRUCTION CORP | Modification of existing Verizon telecommunications site. Replace 3 antennas on roof. All in conformance with TPPN 5/98. No change in use, e… |
| M00006434 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 01/29/2018 | 04/18/2018 | Design TECTONIC ENGINEERING Contractor METRO RF SERVICES INC | Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Installation/retrofit of cabinets in… |
| Building | Filings | Most Recent |
|---|---|---|
| 1 PACE PLAZA ↗ | 41 | 06/24/2026 |