4 projects with open permitsMANHATTAN · 41
1 building
41
Total Filings
41
Projects on File
1
Buildings Worked
4
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Projects by first filing month41 projects all-time
0246Jan '18 · 1Sep '18 · 1Feb '19 · 1Mar '19 · 1Oct '19 · 1Feb '20 · 5Jul '20 · 1Feb '21 · 1Aug '21 · 1Mar '22 · 1Jun '22 · 1May '23 · 1Jun '23 · 2Jul '23 · 1Sep '23 · 3Oct '23 · 1Nov '23 · 2Dec '23 · 2Jan '24 · 1Feb '24 · 1Apr '24 · 1May '24 · 2Jul '24 · 1Aug '24 · 1Nov '24 · 1Mar '25 · 1May '25 · 1Jun '25 · 1Dec '25 · 1Apr '26 · 1Jun '26 · 1201820192020202120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit410%
Signed off3585%
Filed only25%
By project type
Alteration41
Most active buildings
All buildings →
1 PACE PLAZAMANHATTAN · 4 open · latest 09/29/2026
41 projects
Key relationships
Everyone →
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M013863881 PACE PLAZA
MANHATTAN
AlterationPermit Issued04/24/202609/29/2026PROPOSED NEW STANDPIPE SYSTEM IN STAIR J, STAGE AREA, AND FLOOR, ALL AS PER PLAN. NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
M014155411 PACE PLAZA
MANHATTAN
AlterationSigned-off06/24/202606/25/2026Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M010219321 PACE PLAZA
MANHATTAN
AlterationSigned-off04/04/202404/22/2026
Owner KINGS GROUP NY CORP
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF N…
M009072401 PACE PLAZA
MANHATTAN
AlterationSigned-off07/24/202304/21/2026Removal of plumbing fixtures with all related piping, gas appliances removal, cut and cap all the service water, gas and sanitary sewer pipi…
M013222051 PACE PLAZA
MANHATTAN
AlterationSigned-off12/10/202501/08/2026Permanent structural framing and supports for the installation of a kitchen exhaust riser under parent Mechanical Job # M00976708-S4.
M009596761 PACE PLAZA
MANHATTAN
AlterationSigned-off11/17/202301/06/2026Modification of existing standpipe system to Temporary standpipe system during construction, all as per plan. no change of use, egress, or o…
Counts cover all 41 projects (41 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Kohler Ronan706/09/2026
Brand Access Solutions612/18/2024
JFK & M Consulting Engineers402/12/2025
Fxcollaborative Architects306/09/2026
Douglas P. Gonzalez206/18/2024
James H. Fahey210/04/2023
KZ Engineering205/20/2025
Loci Architecture201/17/2024
Tectonic Engineering203/21/2019
Asda Architecture + Design103/11/2025
Ashraf104/04/2024
Bednash Consulting112/10/2025
Highland Associates106/08/2023
Howard I Shapiro & Associates105/15/2024
KMB Design Group106/13/2022
Leon Skvirsky PE102/11/2019
Lombardo Professional Engineering106/24/2026
Mohammad Ahead, PE105/09/2023
PS Engineers106/19/2025
Reuther Bowen110/01/2019
Tarek M. Zeid, PE106/24/2026
The MTM Design Group102/15/2021
VS Consulting Engineering106/09/2026
Ysrael A. Seinuk102/13/2020
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Safway Atlantic612/18/2024
Turner Construction Company506/09/2026
Almar Plumbing & Heating306/09/2026
Kings Group NY305/20/2025
Premier Fire Sprinkler Co306/09/2026
Rael Automatic Sprinkler Co305/14/2026
Jansons Assoicates206/09/2026
Tribute Restoration201/17/2024
Arsenal Scaffold105/20/2024
Ashlar Mechanical106/08/2023
Benchmark Builders106/08/2023
Comcell Construction109/18/2018
Domum106/19/2025
Eighty Seven Develpmt110/04/2023
Five Town Neon Sign Co102/11/2019
J.V.S. Contracting Group110/01/2019
KMM Telecommunications110/04/2023
L.e.c.inc102/15/2021
Levest Electric103/21/2019
Mac Felder102/18/2020
Manengeering Bureau108/21/2021
Metro RF Services101/29/2018
Pace Plumbing102/12/2025
Palladium Window Solution106/24/2026
PTS Data Center Solution*106/01/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Pace University2206/24/2026
Kings Group NY305/20/2025
Safway Atlantic312/18/2024
AT&T Mobility103/21/2019
Safway Atlantic102/10/2020
T-Mobile106/13/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Walter T. Gorman, PE906/09/2026
A1 Expediting Service312/18/2024
Synergy Building Consultants205/20/2025
Arsenal Building Consultants105/09/2023
Building Brothers102/11/2019
CCM Consulting Group103/21/2019
Construction Permit Services102/15/2021
GC1 Expediting106/13/2022
Howard I. Shapiro & Associates105/15/2024
JMV Associates106/24/2026
Kma Designs104/04/2024
Lombardo Building Consultants106/24/2026
PS Engineers106/19/2025
41 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 41Open permit 4Signed off 35Filed only 2
41 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M013863881 PACE PLAZA
MANHATTAN
AlterationPermit Issued04/24/202609/29/2026PROPOSED NEW STANDPIPE SYSTEM IN STAIR J, STAGE AREA, AND FLOOR, ALL AS PER PLAN. NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
M014155411 PACE PLAZA
MANHATTAN
AlterationSigned-off06/24/202606/25/2026Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M010219321 PACE PLAZA
MANHATTAN
AlterationSigned-off04/04/202404/22/2026
Owner KINGS GROUP NY CORP
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF N…
M009072401 PACE PLAZA
MANHATTAN
AlterationSigned-off07/24/202304/21/2026Removal of plumbing fixtures with all related piping, gas appliances removal, cut and cap all the service water, gas and sanitary sewer pipi…
M013222051 PACE PLAZA
MANHATTAN
AlterationSigned-off12/10/202501/08/2026Permanent structural framing and supports for the installation of a kitchen exhaust riser under parent Mechanical Job # M00976708-S4.
M009596761 PACE PLAZA
MANHATTAN
AlterationSigned-off11/17/202301/06/2026Modification of existing standpipe system to Temporary standpipe system during construction, all as per plan. no change of use, egress, or o…
M009767081 PACE PLAZA
MANHATTAN
AlterationSigned-off12/18/202301/06/2026Proposed to modify existing HVAC system and install new HVAC units and exhaust system with associate piping and ducts all as per plan. No ch…
M009605741 PACE PLAZA
MANHATTAN
AlterationSigned-off12/18/202310/21/2025Proposed Interior structural modification, new foundation all as per plan. No change of egress, occupancy or use.
M009546921 PACE PLAZA
MANHATTAN
AlterationSigned-off10/30/202309/26/2025
Owner SAFWAY ATLANTIC, LLC
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER T…
M009600731 PACE PLAZA
MANHATTAN
AlterationSigned-off11/08/202309/26/2025
Owner SAFWAY ATLANTIC, LLC
TEMPORARY OVERHEAD PROTECTION DURING BLDG ALTERATION, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN US…
M011424281 PACE PLAZA
MANHATTAN
AlterationSigned-off11/14/202409/26/2025
Owner SAFWAY ATLANTIC, LLC
TEMPORARY QUIK DECK PLATFORM AS PER DRAWINGS. QUICK DECK PLATFORM SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, …
M012347671 PACE PLAZA
MANHATTAN
AlterationPermit Issued06/04/202508/11/2025STRUCTURAL APPLICATION FOR PROPOSED INSTALLATION OF A NON-ILLUMINATED BANNER ACCESSORY BUSINESS SIGN (56'-6 X 54'-5) WALL MOUNTED, ACCESSORY…
M012153841 PACE PLAZA
MANHATTAN
AlterationSigned-off05/20/202506/05/2025
Owner KINGS GROUP NY CORP
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in u…
M009308481 PACE PLAZA
MANHATTAN
AlterationSigned-off01/17/202405/15/2025Proposed facade repair as per plan for East building and Tower. No change of use, egress or occupancy.
M010368811 PACE PLAZA
MANHATTAN
AlterationPermit Issued05/20/202405/15/2025File-SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
M011833791 PACE PLAZA
MANHATTAN
AlterationFiled — no permit on record03/11/2025——
M009976981 PACE PLAZA
MANHATTAN
AlterationSigned-off02/02/202402/19/2025USE OF MECHANICAL DEMO EQUIPMENT DURING PARTIAL DEMO, FILED SEPARATELY UNDER M00997698-I1.
M010741871 PACE PLAZA
MANHATTAN
AlterationSigned-off07/22/202412/09/2024INSTALLATION OF DUAL 7000# CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG ALTERATION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC B…
M009205731 PACE PLAZA
MANHATTAN
AlterationSigned-off09/08/202310/04/2024Removal of existing stairs and stringer in Stairwell J for future construction. No change to use, occupancy or egress.
M010761111 PACE PLAZA
MANHATTAN
AlterationSigned-off08/14/202408/15/2024Proposed Sprinkler System in Mechanical room on the 4th floor, all as per plan. No change of use, occupancy or egress.
M010501681 PACE PLAZA
MANHATTAN
AlterationSigned-off05/20/202405/22/2024Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg…
M002239961 PACE PLAZA
MANHATTAN
AlterationSigned-off07/29/202004/17/2024Modification to existing VERIZON site on the roof. Replacement of (11) antennas, (3) distribution boxes and (12) RRH units. Installation of …
M009196401 PACE PLAZA
MANHATTAN
AlterationSigned-off09/08/202303/14/2024Cut /cap/remove existing sprinkler. storm and sanitary piping and sewage ejector pump, Steam WH and house pumps within mechanical room in ce…
M009195901 PACE PLAZA
MANHATTAN
AlterationSigned-off09/07/202310/20/2023Cut and remove existing mechanical duct work in cellar, all as per plan. No change of use or egress or occupancy.
M008800471 PACE PLAZA
MANHATTAN
AlterationSigned-off06/01/202309/06/2023Install colling units in existing MDF room on 2nd floor with condensing units on roof. No change to use, occupancy or use.
M008821091 PACE PLAZA
MANHATTAN
AlterationSigned-off06/08/202306/30/2023Proposed modification of sprinkler heads within partial 2nd and third floor, all as per plans. No change to use, occupancy or egress.
M006568141 PACE PLAZA
MANHATTAN
AlterationSigned-off03/04/202205/12/2023Proposed facade repair as per plan. No change of use, egress or occupancy.
M008716781 PACE PLAZA
MANHATTAN
AlterationSigned-off05/09/202305/09/2023
Owner KINGS GROUP NY CORP
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF N…
M007416621 PACE PLAZA
MANHATTAN
AlterationSigned-off06/13/202206/23/2022
Owner T-MOBILE
Carrier: Sprint & CW. Decom of existing telecom equipment. Removal of equipment on roof and utility disconnect in the basement. Initial inst…
M005681211 PACE PLAZA
MANHATTAN
AlterationSigned-off08/03/202108/03/2021INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS …
M002743431 PACE PLAZA
MANHATTAN
AlterationSigned-off02/27/202006/02/2021Modification to existing sprinkler system as per plan. No change in use, occupancy and egress.
M002774771 PACE PLAZA
MANHATTAN
AlterationSigned-off02/24/202003/30/2021Modification of existing mechanical system on 4th, 5th, 6th and roof as per plan. No change to use, occupancy or egress
M004588181 PACE PLAZA
MANHATTAN
AlterationSigned-off02/15/202103/08/2021
Contractor L.E.C.INC
DECOMMISSION OF EXISTING NYCWIN TELECOM SITE. REMOVE ALL ANTENNAS AND EQUIPMENT FROM THE PENTHOUSE AND ROOF. NO CHANGE IN USE, EGRESS OR OCC…
M002745071 PACE PLAZA
MANHATTAN
AlterationSigned-off02/18/202010/27/2020
Contractor MAC FELDER INC
Removal and Installation of plumbing fixtures. No change in use, occupancy or egress
M003119301 PACE PLAZA
MANHATTAN
AlterationSigned-off02/10/202009/22/2020
Owner SAFWAY ATLANTIC LLC
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EG…
M002779161 PACE PLAZA
MANHATTAN
AlterationFiled — no permit on record02/13/2020——
M002023191 PACE PLAZA
MANHATTAN
AlterationSigned-off10/01/201911/06/2019Re-installation of the existing Pace University letters on the exterior wall with new support anchorage. No change to use, occupancy or use.
M001007101 PACE PLAZA
MANHATTAN
AlterationPermit Issued03/21/201904/18/2019AT&T - Modification to existing telecommunication facility. Removal of existing telecommunication equipment cabinets on existing equipment p…
M001176101 PACE PLAZA
MANHATTAN
AlterationSigned-off02/11/201903/14/2019
Contractor ENRICO PASSARO
INSTALL NON-ILLUMINATED WALL SIGN (PACE UNIVERSITY)
M000648901 PACE PLAZA
MANHATTAN
AlterationSigned-off09/18/201801/09/2019Modification of existing Verizon telecommunications site. Replace 3 antennas on roof. All in conformance with TPPN 5/98. No change in use, e…
M000064341 PACE PLAZA
MANHATTAN
AlterationSigned-off01/29/201804/18/2018Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Installation/retrofit of cabinets in…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
1 PACE PLAZA ↗4106/24/2026
▾Documents — 496 on file (BIS + DOB NOW)
▸Plans & Drawings84
▸DOB NOWPlans/Sketch68
09/06/2026M01386388-I1 · 1 PACE PLAZARequest digital key ↗
09/06/2026M00006434-I1 · 1 PACE PLAZARequest digital key ↗
09/06/2026M00064890-I1 · 1 PACE PLAZARequest digital key ↗
Showing 3 of 68 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/05/2026M00274343-P2 · 1 PACE PLAZARequest digital key ↗
08/15/2026M00274343-P1 · 1 PACE PLAZARequest digital key ↗
08/15/2026M00274343-I1 · 1 PACE PLAZARequest digital key ↗
▸DOB NOWPlans/Sketch - Antenna3
09/02/2026M00223996-P2 · 1 PACE PLAZARequest digital key ↗
08/15/2026M00223996-P1 · 1 PACE PLAZARequest digital key ↗
08/14/2026M00223996-I1 · 1 PACE PLAZARequest digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/05/2026M00202319-I1 · 1 PACE PLAZARequest digital key ↗
09/05/2026M00277916-I1 · 1 PACE PLAZARequest digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00311930-I1 · 1 PACE PLAZARequest digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00117610-I1 · 1 PACE PLAZARequest digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00274507-I1 · 1 PACE PLAZARequest digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00458818-I1 · 1 PACE PLAZARequest digital key ↗
▸Seals & Professional Certifications267
▸DOB NOWProgress Inspector Seal & Signature108
10/05/2026M00277477-P3 · 1 PACE PLAZAOpen ↗
10/05/2026M00277477-P3 · 1 PACE PLAZAOpen ↗
10/05/2026M00277477-P3 · 1 PACE PLAZAOpen ↗
Showing 3 of 108 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature84
09/06/2026M01386388-I1 · 1 PACE PLAZAOpen ↗
09/05/2026M00100710-I1 · 1 PACE PLAZAOpen ↗
09/05/2026M00277916-I1 · 1 PACE PLAZAOpen ↗
Showing 3 of 84 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature75
10/05/2026M00277477-P3 · 1 PACE PLAZAOpen ↗
10/05/2026M00277477-P3 · 1 PACE PLAZAOpen ↗
10/05/2026M00277477-P3 · 1 PACE PLAZAOpen ↗
Showing 3 of 75 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWFDNY: Letter of No Objection4
08/17/2026M00907240-P5 · 1 PACE PLAZAOpen ↗
Showing 1 of 4 on file for this type
▸Safety & Tenant Protection13
▸DOB NOWTenant Protection Plan13
09/05/2026M00274343-P1 · 1 PACE PLAZAOpen ↗
09/02/2026M00223996-P2 · 1 PACE PLAZAOpen ↗
08/15/2026M00274343-I1 · 1 PACE PLAZAOpen ↗
Showing 3 of 13 on file for this type
▸Environmental & Asbestos37
▸DOB NOWDEP ACP-5: Asbestos Assessment Report25
09/06/2026M01386388-I1 · 1 PACE PLAZAOpen ↗
09/05/2026M00274507-I1 · 1 PACE PLAZAOpen ↗
09/05/2026M00274343-P1 · 1 PACE PLAZAOpen ↗
Showing 3 of 25 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form12
08/28/2026M00960574-I1 · 1 PACE PLAZAOpen ↗
08/28/2026M00960574-S1 · 1 PACE PLAZAOpen ↗
08/17/2026M00907240-I1 · 1 PACE PLAZAOpen ↗
Showing 3 of 12 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/14/2026M00223996-I1 · 1 PACE PLAZAOpen ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs79
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter71
09/06/2026M01386388-I1 · 1 PACE PLAZAOpen ↗
09/05/2026M00277916-I1 · 1 PACE PLAZAOpen ↗
09/05/2026M00274507-I1 · 1 PACE PLAZAOpen ↗
Showing 3 of 71 on file for this type
▸DOB NOWDEP Variance (V5) letter8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸Other Documents10
▸DOB NOWManufacturer's Specifications4
08/16/2026M01415541-I1 · 1 PACE PLAZAOpen ↗
08/13/2026M01036881-P2 · 1 PACE PLAZAOpen ↗
08/13/2026M01036881-I1 · 1 PACE PLAZAOpen ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/16/2026M01415541-I1 · 1 PACE PLAZAOpen ↗
08/13/2026M01036881-I1 · 1 PACE PLAZAOpen ↗
08/13/2026M01036881-P2 · 1 PACE PLAZAOpen ↗
Showing 3 of 4 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStructural Peer Review Report1
08/13/2026M00202319-I1 · 1 PACE PLAZAOpen ↗