| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01392317 | 260 WILLOUGHBY AVENUE BROOKLYN | Alteration | Permit Issued | 05/04/2026 | 07/28/2026 | Design Always Fast Services Corp Owner SRCC CORP Contractor ANDAMIO SCAFFOLDING LLC | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAP… |
| B01392318 | 260 WILLOUGHBY AVENUE BROOKLYN | Alteration | Permit Issued | 05/04/2026 | 05/04/2026 | Design Always Fast Services Corp Owner SRCC CORP Contractor ANDAMIO SCAFFOLDING LLC | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE I… |
| B01356204 | 395 DEKALB AVENUE BROOKLYN | Alteration | Permit Issued | 04/03/2026 | 04/23/2026 | Design CALLISONRTKL Contractor DEBORAH BRADLEY CONS & MG | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE INFILTRATION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIV… |
| B01260279 | 395 DEKALB AVENUE BROOKLYN | Alteration | Permit Issued | 08/06/2025 | 01/26/2026 | Contractor SRCC CORP | Repairs to facade and subgrade waterproofing, replacement of scuppers, replacement of exterior pads and stoop. |
| B01323911 | 135 EMERSON PLACE BROOKLYN | Alteration | Permit Issued | 12/02/2025 | 12/09/2025 | Design PEDROL CONTRACTING INC Owner SHR GROUP INC Contractor PEDROL CONTRACTING INC | Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy. |
| B00968225 | 229 CLINTON AVENUE BROOKLYN | Alteration | Permit Issued | 05/24/2024 | 10/29/2025 | Design SCOTT HENSON ARCHITECT LLC Contractor NOVA CONSTRUCTION SERVICE Filer EDG | Facade alterations as shown on the drawings filed herewith. No change in use, egress, or occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| Paul Perdek, Prof. Engineering | 7 | 04/04/2025 |
| Rigid Structural Design | 6 | 06/19/2025 |
| Polise Consulting Engineers | 5 | 12/12/2024 |
| Thornton Tomasetti | 4 | 05/07/2024 |
| 2LS Consulting Engineering | 3 | 02/08/2022 |
| Nicolas Baratto Architect | 3 | 07/28/2025 |
| Ame Services | 2 | 02/07/2022 |
| Always Fast Services | 2 | 06/03/2026 |
| Callisonrtkl | 2 | 04/03/2026 |
| Lombardo Professional Engineering | 2 | 04/19/2023 |
| Otj Architects | 2 | 12/22/2025 |
| Royal Engineering | 2 | 06/12/2019 |
| SYNC Architecture | 2 | 06/26/2024 |
| AMA Consulting Engineers | 1 | 06/09/2025 |
| Asr Engineering | 1 | 12/15/2022 |
| Baileys Engineering | 1 | 08/21/2018 |
| Burns Engineering | 1 | 07/07/2025 |
| EDG | 1 | 07/26/2023 |
| Gensler | 1 | 11/25/2024 |
| Gilsanz Murray Steficek | 1 | 06/09/2025 |
| Graf & Lewent Architects | 1 | 06/16/2022 |
| Hoffmann Architects | 1 | 01/13/2026 |
| Levin Engineering | 1 | 08/06/2021 |
| Lawrence K. Shapiro & Associates | 1 | 01/13/2026 |
| Martin H. Kapell | 1 | 02/04/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| SHR Group | 10 | 06/19/2025 |
| Nova Construction Service | 7 | 04/04/2025 |
| Talisen Construction | 6 | 12/22/2025 |
| Andamio Scaffolding | 2 | 06/03/2026 |
| Army Construction | 2 | 02/07/2022 |
| John's Plumbing & Heating | 2 | 12/12/2024 |
| L & M Construction/DRY WA | 2 | 12/12/2024 |
| NY Tent | 2 | 06/26/2024 |
| Phoenix Sutton STR | 2 | 06/12/2019 |
| SRCC | 2 | 01/13/2026 |
| American Standard Plumbing | 1 | 11/25/2024 |
| Ashlar Mechanical | 1 | 06/24/2022 |
| Bedrock Mechanical | 1 | 06/09/2025 |
| Bedrock Plumbing & Heating | 1 | 06/09/2025 |
| Cobalt Mechanical | 1 | 11/25/2024 |
| Complete Plumbing Safety | 1 | 11/25/2024 |
| Consolidated Scaffolding | 1 | 07/25/2019 |
| Deborah Bradley Cons & MG | 1 | 04/03/2026 |
| DHS Fraco | 1 | 02/05/2018 |
| Enobrac Plumbing | 1 | 11/25/2024 |
| Galvin Brothers | 1 | 07/08/2024 |
| Go Pro Fire Protection | 1 | 11/25/2024 |
| Lexington Maintenance | 1 | 08/21/2018 |
| Pedrol Contracting | 1 | 12/02/2025 |
| Preserv BLD Restoration Management | 1 | 04/25/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| SHR Group | 6 | 12/02/2025 |
| Phoenix Sutton STR | 2 | 06/12/2019 |
| SRCC | 2 | 06/03/2026 |
| Consolidated Scaffolding | 1 | 07/25/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| AE Design Solution | 7 | 04/04/2025 |
| Rigid Structural Design | 4 | 12/02/2025 |
| Design 2147 | 3 | 01/13/2026 |
| EDG | 2 | 02/04/2025 |
| KM Associates of New York | 2 | 04/25/2023 |
| Lombardo Building Consultants | 2 | 04/19/2023 |
| Metropolis Group | 2 | 07/27/2022 |
| Yao W Guo Architect | 2 | 12/12/2024 |
| Eurocelt Expediting | 1 | 07/25/2019 |
| Levin Engineering | 1 | 08/06/2021 |
| LMS-Ace Services | 1 | 07/26/2023 |
| Lawrence K. Shapiro & Associates | 1 | 01/13/2026 |
| Mbe Code & Zoning | 1 | 11/25/2024 |
| Municipal Building Consultants | 1 | 06/26/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01392317 | 260 WILLOUGHBY AVENUE BROOKLYN | Alteration | Permit Issued | 05/04/2026 | 07/28/2026 | Design Always Fast Services Corp Owner SRCC CORP Contractor ANDAMIO SCAFFOLDING LLC | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAP… |
| B01392318 | 260 WILLOUGHBY AVENUE BROOKLYN | Alteration | Permit Issued | 05/04/2026 | 05/04/2026 | Design Always Fast Services Corp Owner SRCC CORP Contractor ANDAMIO SCAFFOLDING LLC | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE I… |
| B01356204 | 395 DEKALB AVENUE BROOKLYN | Alteration | Permit Issued | 04/03/2026 | 04/23/2026 | Design CALLISONRTKL Contractor DEBORAH BRADLEY CONS & MG | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE INFILTRATION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIV… |
| B01260279 | 395 DEKALB AVENUE BROOKLYN | Alteration | Permit Issued | 08/06/2025 | 01/26/2026 | Contractor SRCC CORP | Repairs to facade and subgrade waterproofing, replacement of scuppers, replacement of exterior pads and stoop. |
| B01323911 | 135 EMERSON PLACE BROOKLYN | Alteration | Permit Issued | 12/02/2025 | 12/09/2025 | Design PEDROL CONTRACTING INC Owner SHR GROUP INC Contractor PEDROL CONTRACTING INC | Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy. |
| B00968225 | 229 CLINTON AVENUE BROOKLYN | Alteration | Permit Issued | 05/24/2024 | 10/29/2025 | Design SCOTT HENSON ARCHITECT LLC Contractor NOVA CONSTRUCTION SERVICE Filer EDG | Facade alterations as shown on the drawings filed herewith. No change in use, egress, or occupancy. |
| B01089770 | 229 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 08/19/2024 | 09/04/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Contractor NOVA CONSTRUCTION SERVICE Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01089825 | 229 CLINTON AVENUE BROOKLYN | Alteration | Permit Issued | 08/19/2024 | 08/20/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Contractor NOVA CONSTRUCTION SERVICE Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01089810 | 229 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 08/15/2024 | 08/05/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Contractor NOVA CONSTRUCTION SERVICE Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY SHANTY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01089835 | 229 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 08/15/2024 | 08/05/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Contractor NOVA CONSTRUCTION SERVICE Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01258326 | 369 DEKALB AVENUE BROOKLYN | Alteration | Filed — no permit on record | 07/28/2025 | — | — | |
| B01086483 | 536 MYRTLE AVENUE BROOKLYN | Alteration CO | Permit Issued | 11/11/2024 | 07/15/2025 | Design OTJ ARCHITECTS Contractor TALISEN CONSTRUCTION CORP Filer DESIGN 2147, LTD | Interior renovation of plan east of 3rd floor. New interior partitions and finishes. Minimal addition of plumbing fixtures and minimal struc… |
| B01224837 | 379 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 07/07/2025 | 07/14/2025 | Design BURNS ENGINEERING, PC Contractor SRCC CORP Filer DESIGN 2147, LTD | HEREWITH FILING PARAPET AND FACADE WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| B01242812 | 220 WILLOUGHBY AVENUE BROOKLYN | Alteration | Signed-off | 06/19/2025 | 06/24/2025 | Design RIGID STRUCTURAL DESIGN, LLC Owner SHR GROUP INC Contractor SHR GROUP INC | Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use… |
| B01242713 | 181 STEUBEN STREET BROOKLYN | Alteration | Signed-off | 06/19/2025 | 06/23/2025 | Design RIGID STRUCTURAL DESIGN, LLC Contractor SHR GROUP INC | Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use… |
| B01242839 | 369 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 06/17/2025 | 06/18/2025 | Design RIGID STRUCTURAL DESIGN, LLC Contractor SHR GROUP INC | Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use… |
| B01236457 | 369 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 06/16/2025 | 06/17/2025 | Design RIGID STRUCTURAL DESIGN, LLC Owner SHR GROUP INC Contractor SHR GROUP INC | Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change … |
| B01236391 | 181 STEUBEN STREET BROOKLYN | Alteration | Signed-off | 06/16/2025 | 06/16/2025 | Design RIGID STRUCTURAL DESIGN, LLC Contractor SHR GROUP INC | Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change … |
| B01235589 | 220 WILLOUGHBY AVENUE BROOKLYN | Alteration | Signed-off | 06/13/2025 | 06/13/2025 | Design RIGID STRUCTURAL DESIGN, LLC Owner SHR GROUP INC Contractor SHR GROUP INC | Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change … |
| B00976418 | 395 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 02/02/2024 | 05/19/2025 | Contractor RICHTER & RATNER CONTRACTING Filer MBE CODE & ZONING LLC | Removal and installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change of use, egress, o… |
| B01158620 | 536 MYRTLE AVENUE BROOKLYN | Alteration | Signed-off | 01/31/2025 | 05/05/2025 | Design AMA CONSULTING ENGINEERS, PC Contractor TALISEN CONSTRUCTION CORP Filer DESIGN 2147, LTD | Structural modifications as per plans filed herewith. |
| B01190524 | 229 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 03/12/2025 | 03/19/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Contractor NOVA CONSTRUCTION SERVICE Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY SCAFFOLD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01184026 | 229 CLINTON AVENUE BROOKLYN | Alteration | Filed — no permit on record | 02/24/2025 | — | Design PAUL PERDEK, PROF. ENG. PLLC Filer AE DESIGN SOLUTION INC. | — |
| B01146213 | 224 RYERSON STREET BROOKLYN | Alteration | Permit Issued | 12/12/2024 | 01/21/2025 | Contractor L & M CONSTRUCTION/DRY WA Filer YAO W GUO ARCHITECT, PC | HEREWITH FILING FOR SPRINKLER HEADS MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01095322 | 61 ST JAMES PLACE BROOKLYN | Alteration | Signed-off | 11/04/2024 | 12/31/2024 | Contractor L & M CONSTRUCTION/DRY WA Filer YAO W GUO ARCHITECT, PC | HEREWITH FILING FOR MECHANICAL SYSTEM MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B00975429 | 229 CLINTON AVENUE BROOKLYN | Alteration | Filed — no permit on record | 11/25/2024 | — | Design OLD STRUCTURES ENGINEERING | — |
| B01135789 | 229 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 11/11/2024 | 11/18/2024 | Design PAUL PERDEK, PROF. ENG. PLLC Contractor NOVA CONSTRUCTION SERVICE Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY SHANTY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01055204 | 203 GRAND AVENUE BROOKLYN | Alteration | Signed-off | 07/08/2024 | 07/12/2024 | Design CALLISONRTKL Contractor GALVIN BROTHERS INC | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE INFILTRATION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIV… |
| B01072415 | 224 RYERSON STREET BROOKLYN | Alteration | Signed-off | 06/26/2024 | 07/01/2024 | Design SYNC ARCHITECTURE P.C Contractor NY TENT, LLC | Temporary tents in the outdoor Rose Garden for accessory dining use, removed at the end of the programing. No changes to existing structure… |
| B08020043 | 61 ST JAMES PLACE BROOKLYN | Alteration | Permit Issued | 04/25/2023 | 06/13/2024 | Design THORNTON TOMASETTI Contractor PRESERV BLD RESTOR MGT IN | Concrete slab and tile repairs as per plans filed herewith. no change to use, egress or occupancy. |
| B00696643 | 61 ST JAMES PLACE BROOKLYN | Alteration | Signed-off | 04/08/2022 | 06/29/2023 | Design THORNTON TOMASETTI Contractor SHR GROUP INC | Facade repairs and roofing replacement as per plans submitted herewith. No change in use, egress or occupancy. |
| B00697496 | 215 RYERSON STREET BROOKLYN | Alteration | Permit Issued | 03/15/2022 | 06/29/2023 | Owner SHR GROUP INC Contractor SHR GROUP INC | TEMPORARY SIDEWALK SHED INSTALLATION AND USE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00767527 | 61 ST JAMES PLACE BROOKLYN | Alteration | Permit Issued | 06/30/2022 | 06/29/2023 | Owner SHR GROUP INC Contractor SHR GROUP INC | INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B00836531 | 215 RYERSON STREET BROOKLYN | Alteration | Signed-off | 05/04/2023 | 06/29/2023 | Design THORNTON TOMASETTI Contractor SHR GROUP INC Filer EDG | Repairs to existing facade as shown on the drawings filed herewith. No change in use, egress, or occupancy. |
| B00671570 | 250 CLASSON AVENUE BROOKLYN | Alteration | Permit Issued | 02/07/2022 | 04/14/2023 | Design AME SERVICES INC Contractor ARMY CONSTRUCTION LLC | Filing for installation of pipe scaffolding on behalf of contractor |
| B00672129 | 250 CLASSON AVENUE BROOKLYN | Alteration | Permit Issued | 02/04/2022 | 04/14/2023 | Design AME SERVICES INC Contractor ARMY CONSTRUCTION LLC | Filing for installation of construction fence on behalf of contractor |
| B00706097 | 229 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 03/28/2022 | 03/29/2023 | Design SYNC ARCHITECTURE P.C Contractor NY TENT, LLC | Temporary tent accessory to the Pratt House, removed at the end of the programing. No changes to existing structures, use or egress. |
| B00815976 | 369 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 01/27/2023 | 03/23/2023 | Design EDG Contractor TETRA CONTRACTING CORP Filer LMS-ACE SERVICES | PROPOSED REPAIRS OF EXISTING FIRE ESCAPES AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00746291 | 395 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 07/27/2022 | 02/17/2023 | Contractor TALISEN CONSTRUCTION CORP Filer METROPOLIS GROUP INC | Hereby filing removal and installation of duct work, diffusers, A/C units and related mechanical piping. |
| B08054582 | 369 DEKALB AVENUE BROOKLYN | Alteration | Permit Issued | 12/15/2022 | 12/16/2022 | Design ASR ENGINEERING PC Contractor TOPLINE NYC CONTRACTING | PROPOSED INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CO… |
| B00746284 | 395 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 06/24/2022 | 10/13/2022 | Contractor ASHLAR MECHANICAL CORP | NEW SPRINKLERS TO COVER SCOPE OF WORK AREAS. NEW SPRINKLER COVERAGE FOR UNDER DROP DOWN CEILING AREAS, AS WELL ASSPACE BETWEEN DROP DOWN CEI… |
| B00746298 | 395 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 06/16/2022 | 07/20/2022 | Contractor TALISEN CONSTRUCTION CORP Filer METROPOLIS GROUP INC | FILING TO DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, DOORS AND CEILINGS, FOR THE ATHLETIC OFFICE SPACE RENOVATION, AS SHOWN ON PLANS FILED … |
| B00662499 | 536 MYRTLE AVENUE BROOKLYN | Alteration | Signed-off | 02/08/2022 | 04/11/2022 | Contractor WILLIAM C. GERAKARIS P&H Filer DESIGN 2147, LTD | Modification to existing plumbing fixtures as per plans. No change in use, egress, or occupancy. |
| B00662555 | 536 MYRTLE AVENUE BROOKLYN | Alteration | Signed-off | 02/08/2022 | 03/17/2022 | Contractor TALISEN CONSTRUCTION CORP | Filed herein modification to existing associated mechanical systems as per plans. No change to use, egress, or occupancy. |
| B00662593 | 536 MYRTLE AVENUE BROOKLYN | Alteration | Signed-off | 02/07/2022 | 02/22/2022 | Contractor STANDARD FIRE SUPP CORP | Installation & modification to existing plumbing-sprinkler fixture layout as per plans. No change to use, egress, or occupancy |
| B00662118 | 536 MYRTLE AVENUE BROOKLYN | Alteration | Signed-off | 02/04/2022 | 02/17/2022 | Design MARTIN H. KAPELL Contractor TALISEN CONSTRUCTION CORP | INTERIOR RENOVATION TO EXISTING COLLEGE/UNIVERSITY. (PRATT - MYRTLE HALL, 3RD FLOOR). AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS,… |
| B00641546 | 61 ST JAMES PLACE BROOKLYN | Alteration | Signed-off | 01/03/2022 | 01/27/2022 | Design THORNTON TOMASETTI Contractor SJS CONSTRUCTION CO., INC | Filing for removal of indicated existing bearing walls at the basement level. Installation of new streel framing to re-support 1st floor. No… |
| B00524316 | 203 GRAND AVENUE BROOKLYN | Alteration | Signed-off | 06/04/2021 | 06/17/2021 | Design LEVIN ENGINEERING PLLC Contractor G.A. PLBG & HTG INC Filer LEVIN ENGINEERING PLLC | INSTALLATION OF NEW GAS PIPING . NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00116496 | 135 EMERSON PLACE BROOKLYN | Alteration | Signed-off | 01/08/2019 | 06/26/2019 | Design PACE ENGINEERING P.C. Owner CONSOLIDATED SCAFFOLDING INC Contractor CONSOLIDATED SCAFFOLDING Filer EUROCELT EXPEDITING, INC | INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO CO… |
| B00173025 | 135 EMERSON PLACE BROOKLYN | Alteration | Signed-off | 05/28/2019 | 05/29/2019 | Design ROYAL ENGINEERING, P.C Owner PHOENIX SUTTON STR INC Contractor PHOENIX SUTTON STR INC | INSTALLATION OF TEMPORARY 14' HIGH WORKING PLATFORM ORIGINATING (OFF BUILDING FLOORS)FOR NEW BUILDING CONSTRUCTION WORK AS PER PLAN. NO CHAN… |
| B00016690 | 135 EMERSON PLACE BROOKLYN | Alteration | Signed-off | 02/05/2018 | 05/22/2019 | Design PATUXENT ENGINEERING LLC Contractor DHS FRACO | INSTALLATION OF SCAFFOLD DURING NB CONSTRUCTION AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USB, EGRESS… |
| B00092213 | 135 EMERSON PLACE BROOKLYN | Alteration | Signed-off | 10/25/2018 | 10/29/2018 | Design ROYAL ENGINEERING, P.C Owner PHOENIX SUTTON STR INC Contractor PHOENIX SUTTON STR INC | INSTALLATION OF TEMPORARY (60'-130') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCC… |
| B00067774 | 135 EMERSON PLACE BROOKLYN | Alteration | Signed-off | 08/21/2018 | 08/22/2018 | Design BAILEYS ENGINEERING PC Contractor LEXINGTON MAINTENANCE LLC | INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Building | Filings | Most Recent |
|---|---|---|
| 260 WILLOUGHBY AVENUE ↗ | 2 | 06/03/2026 |
| 395 DEKALB AVENUE ↗ | 6 | 04/03/2026 |
| 536 MYRTLE AVENUE ↗ | 6 | 12/22/2025 |
| 135 EMERSON PLACE ↗ | 6 | 12/02/2025 |
| 369 DEKALB AVENUE ↗ | 5 | 07/28/2025 |
| 379 DEKALB AVENUE ↗ | 1 | 07/07/2025 |
| 220 WILLOUGHBY AVENUE ↗ | 2 | 06/19/2025 |
| 181 STEUBEN STREET ↗ | 2 | 06/19/2025 |
| 229 CLINTON AVENUE ↗ | 10 | 04/04/2025 |
| 224 RYERSON STREET ↗ | 2 | 12/12/2024 |
| 61 ST JAMES PLACE ↗ | 5 | 11/04/2024 |
| 203 GRAND AVENUE ↗ | 2 | 07/08/2024 |
| 215 RYERSON STREET ↗ | 2 | 05/07/2024 |
| 250 CLASSON AVENUE ↗ | 2 | 02/07/2022 |