| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00287539 ↗ | 125 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 01/30/2020 | 02/02/2022 | Design DAGHER ENGINEERING PLLC Contractor AJC SPRINKLER CORP | MODIFICATION TO EXISTING SPRINKLER SYSTEM FOR SUITE 300 LOCATED ON THE 3RD FLOOR, NO CHANGE TO USE OCCUPANCY OR EGRESS |
| M00288261 ↗ | 125 5TH AVENUE MANHATTAN | Alteration | Signed-off | 02/05/2020 | 06/17/2020 | Design DAGHER ENGINEERING PLLC Owner REAL COLLABORATIVE, INC. Contractor GREEN MECHANICAL OF NY | MODIFICATION TO DUCT WORK FOR EXISTING HVAC SYSTEM ON THE 3RD FLOOR , SUITE 300. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| Name | Projects together | Most recent |
|---|---|---|
| Dagher Engineering | 2 | 02/05/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| Amn Sprinkler | 1 | 01/30/2020 |
| Green Mechanical of New Y | 1 | 02/05/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| Real Collaborative | 1 | 02/05/2020 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00287539 ↗ | 125 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 01/30/2020 | 02/02/2022 | Design DAGHER ENGINEERING PLLC Contractor AJC SPRINKLER CORP | MODIFICATION TO EXISTING SPRINKLER SYSTEM FOR SUITE 300 LOCATED ON THE 3RD FLOOR, NO CHANGE TO USE OCCUPANCY OR EGRESS |
| M00288261 ↗ | 125 5TH AVENUE MANHATTAN | Alteration | Signed-off | 02/05/2020 | 06/17/2020 | Design DAGHER ENGINEERING PLLC Owner REAL COLLABORATIVE, INC. Contractor GREEN MECHANICAL OF NY | MODIFICATION TO DUCT WORK FOR EXISTING HVAC SYSTEM ON THE 3RD FLOOR , SUITE 300. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| Building | Filings | Most Recent |
|---|---|---|
| 125 5TH AVENUE ↗ | 2 | 02/05/2020 |