| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01026286 | 150 EAST 91ST STREET MANHATTAN | Alteration | Permit Issued | 04/05/2024 | 04/08/2024 | Design PCS ENGINEERING Contractor CUSTOM METAL CRAFTERS INC | FACADE AND WINDOW RESTORATION VIA SUSPENDED SCAFFOLDS |
| M00577178 | 150 EAST 91ST STREET MANHATTAN | Alteration | Signed-off | 01/24/2022 | 03/29/2024 | Design COSENTINI ASSOCIATES Contractor H M SPRINKLER INC | Installation of temporary standpipe system during construction. In conjunction with NB M00553463-I1 |
| M00811516 | 150 EAST 91ST STREET MANHATTAN | Alteration | Signed-off | 03/07/2023 | 03/06/2024 | Design TOHFAZ UDDIN PE PC Contractor ROCKLEDGE SCAFFOLD CORP | INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO… |
| M00832667 | 150 EAST 91ST STREET MANHATTAN | Alteration | Signed-off | 02/24/2023 | 01/06/2024 | Design PATUXENT ENGINEERING LLC Contractor URBAN INTELLIGENCE, INC | INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. |
| M00945941 | 150 EAST 91ST STREET MANHATTAN | Alteration | Signed-off | 10/10/2023 | 10/11/2023 | Design ASHRAF CORP Contractor ARSENAL SCAFFOLD INC Filer KD DESIGNS | INSTALLATION OF PIPE SCAFFOLDING USED AS A WORKING PLATFORM AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE… |
| M00854711 | 150 EAST 91ST STREET MANHATTAN | Alteration | Signed-off | 04/05/2023 | 04/06/2023 | Design TOHFAZ UDDIN PE PC Contractor ROCKLEDGE SCAFFOLD CORP | TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BLDG… |
| Name | Projects together | Most recent |
|---|---|---|
| Tohfaz Uddin PE | 2 | 04/05/2023 |
| Ashraf | 1 | 11/03/2023 |
| Cosentini Associates | 1 | 01/24/2022 |
| McLaren Engineering Group | 1 | 08/05/2019 |
| Patuxent Engineering | 1 | 02/24/2023 |
| PCS Engineering | 1 | 04/19/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| Rockledge Scaffold | 2 | 04/05/2023 |
| Arsenal Scaffold | 1 | 11/03/2023 |
| Custom Metal Crafters | 1 | 04/19/2024 |
| K.R.S. Renovation | 1 | 08/05/2019 |
| KG Sprinkler | 1 | 01/24/2022 |
| Peak Fire Protection | 1 | 01/24/2022 |
| Urban Intelligence | 1 | 02/24/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Redeemer Presbyterian Church | 6 | 04/19/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| A1 Expediting Service | 1 | 04/05/2023 |
| KD Designs | 1 | 11/03/2023 |
| Patuxent Engineering | 1 | 02/24/2023 |
| Rigging Consultants | 1 | 04/19/2024 |
| William Vitacco Associates | 1 | 01/24/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01026286 | 150 EAST 91ST STREET MANHATTAN | Alteration | Permit Issued | 04/05/2024 | 04/08/2024 | Design PCS ENGINEERING Contractor CUSTOM METAL CRAFTERS INC | FACADE AND WINDOW RESTORATION VIA SUSPENDED SCAFFOLDS |
| M00577178 | 150 EAST 91ST STREET MANHATTAN | Alteration | Signed-off | 01/24/2022 | 03/29/2024 | Design COSENTINI ASSOCIATES Contractor H M SPRINKLER INC | Installation of temporary standpipe system during construction. In conjunction with NB M00553463-I1 |
| M00811516 | 150 EAST 91ST STREET MANHATTAN | Alteration | Signed-off | 03/07/2023 | 03/06/2024 | Design TOHFAZ UDDIN PE PC Contractor ROCKLEDGE SCAFFOLD CORP | INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO… |
| M00832667 | 150 EAST 91ST STREET MANHATTAN | Alteration | Signed-off | 02/24/2023 | 01/06/2024 | Design PATUXENT ENGINEERING LLC Contractor URBAN INTELLIGENCE, INC | INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. |
| M00945941 | 150 EAST 91ST STREET MANHATTAN | Alteration | Signed-off | 10/10/2023 | 10/11/2023 | Design ASHRAF CORP Contractor ARSENAL SCAFFOLD INC Filer KD DESIGNS | INSTALLATION OF PIPE SCAFFOLDING USED AS A WORKING PLATFORM AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE… |
| M00854711 | 150 EAST 91ST STREET MANHATTAN | Alteration | Signed-off | 04/05/2023 | 04/06/2023 | Design TOHFAZ UDDIN PE PC Contractor ROCKLEDGE SCAFFOLD CORP | TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BLDG… |
| M00199029 | 150 WEST 83RD STREET MANHATTAN | Alteration | Signed-off | 08/05/2019 | 08/19/2019 | Design MCLAREN ENGINEERING GROUP Contractor KRS RENOVATION Filer M.G. MCLAREN, P.C. | INSALLATION OF 4 PERMANENT RIGGING POINTS TO SUPPORT A SPEAKER STACK WEIGHING 550 LBS AT EACH STAGE LEFT AND RIGHT SIDES OF THE EXISTING STA… |
| Building | Filings | Most Recent |
|---|---|---|
| 150 EAST 91ST STREET ↗ | 6 | 04/19/2024 |
| 150 WEST 83RD STREET ↗ | 1 | 08/05/2019 |