| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01330888 ↗ | 1221 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 02/03/2026 | 02/09/2026 | Design TPG ARCHITECTURE, LLP Owner ROCKEFELLER GROUP, INC. Contractor ICON INTERIORS INC Filer RIZZO GROUP | General construction on 20th floor (and associated stair work between 19 and 20) as per plans filed herewith. No change to use, egress or oc… |
| M01330935 ↗ | 1221 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 02/04/2026 | 02/09/2026 | Owner ROCKEFELLER GROUP, INC. Contractor ICON INTERIORS INC Filer RIZZO GROUP | Structural framing and modifications on floors 19-21 as per plans filed herewith. No changes to use, egress or occupancy. |
| M01330971 ↗ | 1221 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 02/05/2026 | 02/06/2026 | Design AMA CONSULTING ENGINEERS, PC Owner ROCKEFELLER GROUP, INC. Contractor ABCO-PEERLESS SPRKLR CORP Filer RIZZO GROUP | Modifications to the existing sprinkler system on 20th floor as per plans filed herewith. No changes in use, egress or occupancy. |
| M01330945 ↗ | 1221 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 02/03/2026 | 02/05/2026 | Design AMA CONSULTING ENGINEERS, PC Owner ROCKEFELLER GROUP, INC. Contractor PREFERRED MECHANICAL INC Filer RIZZO GROUP | Modifications to the existing plumbing system on the 20th floor (and connection to existing piping on 19th fl) as per plans filed herewith. … |
| M00281322 ↗ | 1221 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 02/18/2020 | 07/02/2020 | Owner Rockefeller Group Contractor ICON INTERIORS INC | Structural alterations for communicating stair as per plans filed here with. no change in egress, use or occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| ACTIVE DESIGN GROUP ENGINEERING | 2 | 02/04/2026 |
| AMA CONSULTING ENGINEERS, PC | 2 | 06/02/2026 |
| TPG ARCHITECTURE, LLP | 1 | 02/03/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| ICON INTERIORS INC | 3 | 02/04/2026 |
| ABCO-PEERLESS SPRKLR CORP | 1 | 02/05/2026 |
| PREFERRED MECHANICAL INC | 1 | 06/02/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Rockefeller Group | 5 | 06/02/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| RIZZO GROUP | 4 | 06/02/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01330888 ↗ | 1221 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 02/03/2026 | 02/09/2026 | Design TPG ARCHITECTURE, LLP Owner ROCKEFELLER GROUP, INC. Contractor ICON INTERIORS INC Filer RIZZO GROUP | General construction on 20th floor (and associated stair work between 19 and 20) as per plans filed herewith. No change to use, egress or oc… |
| M01330935 ↗ | 1221 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 02/04/2026 | 02/09/2026 | Owner ROCKEFELLER GROUP, INC. Contractor ICON INTERIORS INC Filer RIZZO GROUP | Structural framing and modifications on floors 19-21 as per plans filed herewith. No changes to use, egress or occupancy. |
| M01330971 ↗ | 1221 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 02/05/2026 | 02/06/2026 | Design AMA CONSULTING ENGINEERS, PC Owner ROCKEFELLER GROUP, INC. Contractor ABCO-PEERLESS SPRKLR CORP Filer RIZZO GROUP | Modifications to the existing sprinkler system on 20th floor as per plans filed herewith. No changes in use, egress or occupancy. |
| M01330945 ↗ | 1221 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 02/03/2026 | 02/05/2026 | Design AMA CONSULTING ENGINEERS, PC Owner ROCKEFELLER GROUP, INC. Contractor PREFERRED MECHANICAL INC Filer RIZZO GROUP | Modifications to the existing plumbing system on the 20th floor (and connection to existing piping on 19th fl) as per plans filed herewith. … |
| M00281322 ↗ | 1221 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 02/18/2020 | 07/02/2020 | Owner Rockefeller Group Contractor ICON INTERIORS INC | Structural alterations for communicating stair as per plans filed here with. no change in egress, use or occupancy. |
| Building | Filings | Most Recent |
|---|---|---|
| 1221 AVENUE OF THE AMER ↗ | 5 | 06/02/2026 |