← Back
Entity
The Door
Tenant
MANHATTAN · 3
1 building
3
Total Filings
3
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Signed off3100%
By project type
Alteration3
Most active buildings
All buildings →
121 AVENUE OF THE AMERMANHATTAN · latest 01/03/2024
3 projects
Key relationships
Everyone →
Design firms
Filing representatives
Contractors
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00961872 ↗121 AVENUE OF THE AMER
MANHATTAN
AlterationSigned-off12/06/202301/03/2024Modifications to sprinkler system for new architectural layout. No change to use, egress, or occupancy.
M00961744 ↗121 AVENUE OF THE AMER
MANHATTAN
AlterationSigned-off12/06/202301/02/2024
Design STUDIO1200
Renovation/minor alteration project includes removal of interior non-load bearing partitions, acoustical ceiling grid & tile, finishes, & li…
M00961835 ↗121 AVENUE OF THE AMER
MANHATTAN
AlterationSigned-off12/08/202312/27/2023Existing chilled water fan coil units to remain. Distribution ductwork to be altered and extended. One new outside air intake fan to be in…
Counts cover all 3 projects (3 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
AMA CONSULTING ENGINEERS, PC204/09/2024
STUDIO1200103/12/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
DEMAR PLUMBING CORP204/09/2024
TAURINO MANAGEMENT, INC103/12/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
A1 EXPEDITING SERVICE CORP.304/09/2024
3 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 3Signed off 3
3 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00961872 ↗121 AVENUE OF THE AMER
MANHATTAN
AlterationSigned-off12/06/202301/03/2024Modifications to sprinkler system for new architectural layout. No change to use, egress, or occupancy.
M00961744 ↗121 AVENUE OF THE AMER
MANHATTAN
AlterationSigned-off12/06/202301/02/2024
Design STUDIO1200
Renovation/minor alteration project includes removal of interior non-load bearing partitions, acoustical ceiling grid & tile, finishes, & li…
M00961835 ↗121 AVENUE OF THE AMER
MANHATTAN
AlterationSigned-off12/08/202312/27/2023Existing chilled water fan coil units to remain. Distribution ductwork to be altered and extended. One new outside air intake fan to be in…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
121 AVENUE OF THE AMER ↗304/09/2024
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026M00961872-I1 · 121 AVENUE OF THE AMEROpen ↗
08/28/2026M00961872-P1 · 121 AVENUE OF THE AMEROpen ↗
08/28/2026M00961835-P2 · 121 AVENUE OF THE AMEROpen ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M00961744-I1 · 121 AVENUE OF THE AMEROpen ↗
08/26/2026M00961835-P2 · 121 AVENUE OF THE AMEROpen ↗
08/23/2026M00961744-P2 · 121 AVENUE OF THE AMEROpen ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M00961744-I1 · 121 AVENUE OF THE AMEROpen ↗
08/26/2026M00961835-P2 · 121 AVENUE OF THE AMEROpen ↗
08/23/2026M00961744-P2 · 121 AVENUE OF THE AMEROpen ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026M00961872-P1 · 121 AVENUE OF THE AMEROpen ↗
08/28/2026M00961872-I1 · 121 AVENUE OF THE AMEROpen ↗
08/28/2026M00961835-I1 · 121 AVENUE OF THE AMEROpen ↗
Showing 3 of 7 on file for this type