| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01435810 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Filed — no permit on record | 07/27/2026 | — | Design JACK GREEN ASSOCIATES Owner University Club Filer EDG | — |
| M01304764 | 3 WEST 54TH STREET MANHATTAN | Alteration | Signed-off | 01/09/2026 | 01/29/2026 | Design ICOR ASSOCIATES Owner THE UNIVERSITY CLUB Contractor GREEN MECHANICAL CORP Filer NYCCODE LLC | Mechanical exhaust system for the existing kitchen on a second floor. No change of use, egress or occupancy. |
| M00963330 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Permit Issued | 11/17/2023 | 09/12/2025 | Design G. BLINN CONSULTING, LLC Contractor S&E BRIDGE & SCAFFOLD LLC | TEMPORARY ROOF PROTECTION AS PER DRAWINGS DURING NB CONSTRUCTION AT 18 WEST 55 STREET, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 O… |
| M01089292 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Signed-off | 08/04/2024 | 07/29/2025 | Design ASHRAF CORP Contractor PLATINUM SERVICES NY LLC | INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CH… |
| M00617805 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Permit Issued | 12/02/2021 | 12/19/2024 | Design MORRIS ADJMI ARCHITECTS Contractor SKYLINE DEVELOPERS CONSTR | Structural work associated with closing lot line windows. |
| M01085649 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Permit Issued | 07/30/2024 | 08/07/2024 | Design KN3 ENGINEERING LLC Owner THE UNIVERSITY CLUB Contractor JUNO CONTRACTING CORP Filer AE DESIGN SOLUTION INC. | Installation of suspended scaffold for facade work or inspection |
| Name | Projects together | Most recent |
|---|---|---|
| Jonathan Raible Architect | 4 | 07/22/2024 |
| Icor Associates | 2 | 01/09/2026 |
| New York Engineering Associates | 2 | 04/14/2023 |
| Patuxent Engineering | 2 | 09/27/2021 |
| Ashraf | 1 | 08/04/2024 |
| EDG | 1 | 07/27/2026 |
| G. Blinn Consulting | 1 | 11/17/2023 |
| Jack Green Associates | 1 | 07/27/2026 |
| KN3 Engineering | 1 | 07/30/2024 |
| Morris Adjmi Architects | 1 | 05/31/2022 |
| Sullivan Engineering | 1 | 04/06/2022 |
| TYLin | 1 | 09/08/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| Carlitos Contracting | 2 | 09/27/2021 |
| Juno Contracting | 2 | 07/30/2024 |
| M & S Mechanical Services | 2 | 04/14/2023 |
| Nicholson & Galloway | 2 | 04/06/2022 |
| Windsor AR | 2 | 04/05/2022 |
| Cattro Consulting Group | 1 | 03/20/2023 |
| Green Mechanical | 1 | 01/09/2026 |
| Platinum Services NY | 1 | 08/04/2024 |
| S&E Bridge & Scaffold | 1 | 11/17/2023 |
| Skyline Developers Construction | 1 | 05/31/2022 |
| United Chimney | 1 | 10/24/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| The University Club | 9 | 07/27/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Agouti Construction Consulting | 2 | 07/22/2024 |
| Noel Building Consulting | 2 | 03/20/2023 |
| AE Design Solution | 1 | 07/30/2024 |
| EDG | 1 | 07/27/2026 |
| New York Engineering | 1 | 04/14/2023 |
| Nyccode | 1 | 01/09/2026 |
| Patuxent Engineering | 1 | 09/27/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01435810 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Filed — no permit on record | 07/27/2026 | — | Design JACK GREEN ASSOCIATES Owner University Club Filer EDG | — |
| M01304764 | 3 WEST 54TH STREET MANHATTAN | Alteration | Signed-off | 01/09/2026 | 01/29/2026 | Design ICOR ASSOCIATES Owner THE UNIVERSITY CLUB Contractor GREEN MECHANICAL CORP Filer NYCCODE LLC | Mechanical exhaust system for the existing kitchen on a second floor. No change of use, egress or occupancy. |
| M00963330 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Permit Issued | 11/17/2023 | 09/12/2025 | Design G. BLINN CONSULTING, LLC Contractor S&E BRIDGE & SCAFFOLD LLC | TEMPORARY ROOF PROTECTION AS PER DRAWINGS DURING NB CONSTRUCTION AT 18 WEST 55 STREET, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 O… |
| M01089292 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Signed-off | 08/04/2024 | 07/29/2025 | Design ASHRAF CORP Contractor PLATINUM SERVICES NY LLC | INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CH… |
| M00617805 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Permit Issued | 12/02/2021 | 12/19/2024 | Design MORRIS ADJMI ARCHITECTS Contractor SKYLINE DEVELOPERS CONSTR | Structural work associated with closing lot line windows. |
| M01085649 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Permit Issued | 07/30/2024 | 08/07/2024 | Design KN3 ENGINEERING LLC Owner THE UNIVERSITY CLUB Contractor JUNO CONTRACTING CORP Filer AE DESIGN SOLUTION INC. | Installation of suspended scaffold for facade work or inspection |
| M01059079 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Signed-off | 07/22/2024 | 08/06/2024 | Owner THE UNIVERSITY CLUB Contractor JUNO CONTRACTING | Window lintel repair, removal & replacement of parapet coping and flashing, removal and replacement of masonry, and miscellaneous masonry re… |
| M00709306 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Signed-off | 04/05/2022 | 07/24/2024 | Owner THE UNIVERSITY CLUB Contractor WINDSOR AR, INC | MINOR INTERIOR RENOVATION TO SUITE 506 ADMINISTRATIVE OFFICE. WORK TO INCLUDE DEMOLITON, GENERAL CONSTRUCTION, FINISHES, REPLACE EXISTING FA… |
| M08005882 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Signed-off | 03/20/2023 | 04/30/2024 | Owner THE UNIVERSITY CLUB Contractor CATTRO CONSULTING GROUP | Installation of a safety guard rail at the main roof perimeter. No change of use, egress, or occupancy under this application. |
| M08005998 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Filed — no permit on record | 03/20/2023 | — | Owner THE UNIVERSITY CLUB | — |
| M00797514 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Signed-off | 10/24/2022 | 01/06/2023 | Contractor UNITED CHIMNEY CORP | INSTALL NEW CHIMNEY LINERS AS PER PLANS. |
| M00797406 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Signed-off | 09/09/2022 | 12/02/2022 | Owner THE UNIVERSITY CLUB Contractor M & S MECHANICAL SVCS INC Filer NEW YORK ENGINEERING | INSTALL NEW GAS FIREPLACE LOG SETS IN EXISTING FIREPLACES AND EXTEND GAS RISERS. |
| M00470970 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Signed-off | 03/04/2021 | 10/29/2021 | Design ICOR ASSOCIATES Contractor WINDSOR AR, INC | Structural work associated with the gas piping enclosure installation. No change of use, egress or occupancy. |
| M00580858 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Signed-off | 09/08/2021 | 10/07/2021 | Design TYLin Contractor NICHOLSON & GALLOWAY, INC. | HEREBY FILING STRUCTURAL WORK TO 7TH FLOOR ROOF TERRACE AS PER PLANS. NO CHANGE IN USE EGRESS, OR OCCUPANCY. |
| M00448249 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Signed-off | 01/21/2021 | 06/04/2021 | Design SULLIVAN ENGINEERING Contractor NICHOLSON & GALLOWAY, INC. | HEREBY FILING FACADE ALTERATION AND PARTIAL ROOF REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| M00486148 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Signed-off | 04/23/2021 | 04/23/2021 | Design PATUXENT ENGINEERING LLC Owner THE UNIVERSITY CLUB Contractor CARLITOS CONTRACTING CORP | INSTALLATION OF SUPPORTED SCAFFOLDING IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. |
| M00486130 ↗ | 3 WEST 54TH STREET MANHATTAN | Alteration | Signed-off | 03/29/2021 | 03/30/2021 | Design PATUXENT ENGINEERING LLC Contractor CARLITOS CONTRACTING CORP | INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. |
| Building | Filings | Most Recent |
|---|---|---|
| 3 WEST 54TH STREET ↗ | 17 | 07/27/2026 |