Back
Tenant
Velocity Capital
Tenant
MANHATTAN · 3
1 building
3
Total Filings
3
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Signed off3100%
By project type
Alteration3
Most active buildings
All buildings →
250 WEST 34 STREETMANHATTAN · latest 09/16/2024
3 projects
Key relationships
Everyone →
Filing representatives
Contractors
1 projects
1 projects
Owners
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01092627 ↗250 WEST 34 STREET
MANHATTAN
AlterationSigned-off09/06/202409/16/2024
Contractor MAC FELDER INC
Plumbing work on the 44th floor (Elevate) as indicated on drawings.
M01092602 ↗250 WEST 34 STREET
MANHATTAN
AlterationSigned-off09/09/202409/10/2024Mechanical work on the 44th floor (Elevate) as indicated on drawings.
M01092633 ↗250 WEST 34 STREET
MANHATTAN
AlterationSigned-off09/06/202409/06/2024Sprinkler work on the 44th floor (Elevate) as indicated on drawings.
Counts cover all 3 projects (3 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Goldman Copeland Associates209/09/2024
Goldman Copeland Associates104/02/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Clune Construction Co109/09/2024
Mac Felder109/06/2024
PSI Partners104/02/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Vornado Realty Trust104/02/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Archetype Consultants104/02/2025
3 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 3Signed off 3
3 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01092627 ↗250 WEST 34 STREET
MANHATTAN
AlterationSigned-off09/06/202409/16/2024
Contractor MAC FELDER INC
Plumbing work on the 44th floor (Elevate) as indicated on drawings.
M01092602 ↗250 WEST 34 STREET
MANHATTAN
AlterationSigned-off09/09/202409/10/2024Mechanical work on the 44th floor (Elevate) as indicated on drawings.
M01092633 ↗250 WEST 34 STREET
MANHATTAN
AlterationSigned-off09/06/202409/06/2024Sprinkler work on the 44th floor (Elevate) as indicated on drawings.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
250 WEST 34 STREET ↗304/02/2025
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026M01092627-I1 · 250 WEST 34 STREETOpen ↗
08/24/2026M01092633-I1 · 250 WEST 34 STREETOpen ↗
08/24/2026M01092633-P2 · 250 WEST 34 STREETOpen ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/17/2026M01092633-P2 · 250 WEST 34 STREETOpen ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026M01092627-I1 · 250 WEST 34 STREETOpen ↗
08/24/2026M01092633-I1 · 250 WEST 34 STREETOpen ↗
08/24/2026M01092633-P2 · 250 WEST 34 STREETOpen ↗
Showing 3 of 4 on file for this type