← Back
Entity
White Castle
Tenant
1 project with open permitsMANHATTAN · 3
1 building
3
Total Filings
3
Projects on File
1
Buildings Worked
1
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Open permit133%
Signed off267%
By project type
Alteration3
Most active buildings
All buildings →
2082 ADAM C POWELL BLVDMANHATTAN · 1 open · latest 04/05/2024
3 projects
Key relationships
Everyone →
Filing representatives
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00508005 ↗2082 ADAM C POWELL BLVD
MANHATTAN
AlterationSigned-off08/17/202104/05/2024PAA FILED TO AMEND DRAWING M-2 TO INDICATE EXHAUST AIR-INTAKE PENETRATION AT ROOF FOR NAVIEN HWH
M00507965 ↗2082 ADAM C POWELL BLVD
MANHATTAN
AlterationPermit Issued08/18/202102/09/2022PAA FILED TO AMEND PLUMBING SCOPE FROM 2 GAS METERS TO 1 GAS METER.
M00507890 ↗2082 ADAM C POWELL BLVD
MANHATTAN
AlterationSigned-off08/19/202110/07/2021INTERIOR RENOVATION OF EXSISTING RESTAURANT. WORK TO INCLUDE REMOVAL OF NON-BEARING PARTITIONS, DROPP CEILING, COUNTERS,FURNITURE AND KITCHE…
Counts cover all 3 projects (3 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
CHIA-LING YUAN108/19/2021
DON PENN CONSULTING ENGINEER112/16/2022
GEMINI ENGINEERING GROUP107/16/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ACE CLIMATE ENTERPRISE CO107/16/2025
ARIANA CONTRACTING INC112/16/2022
ARLINGTON CONSTRUCTION108/19/2021
COPPER PLUMBING INC112/16/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BLDG MANAGEMENT CO., INC.212/16/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
PCA DESIGN CONSULTANTS212/16/2022
3 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 3Open permit 1Signed off 2
3 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00508005 ↗2082 ADAM C POWELL BLVD
MANHATTAN
AlterationSigned-off08/17/202104/05/2024PAA FILED TO AMEND DRAWING M-2 TO INDICATE EXHAUST AIR-INTAKE PENETRATION AT ROOF FOR NAVIEN HWH
M00507965 ↗2082 ADAM C POWELL BLVD
MANHATTAN
AlterationPermit Issued08/18/202102/09/2022PAA FILED TO AMEND PLUMBING SCOPE FROM 2 GAS METERS TO 1 GAS METER.
M00507890 ↗2082 ADAM C POWELL BLVD
MANHATTAN
AlterationSigned-off08/19/202110/07/2021INTERIOR RENOVATION OF EXSISTING RESTAURANT. WORK TO INCLUDE REMOVAL OF NON-BEARING PARTITIONS, DROPP CEILING, COUNTERS,FURNITURE AND KITCHE…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
2082 ADAM C POWELL BLVD ↗307/16/2025
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
Showing 3 of 8 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
09/02/2026M00507965-P3 · 2082 ADAM C POWELL BLVDOpen ↗
09/02/2026M00507965-P1 · 2082 ADAM C POWELL BLVDOpen ↗
09/02/2026M00507965-I1 · 2082 ADAM C POWELL BLVDOpen ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026M00507965-P1 · 2082 ADAM C POWELL BLVDOpen ↗
08/31/2026M00507890-I1 · 2082 ADAM C POWELL BLVDOpen ↗
08/31/2026M00507890-I1 · 2082 ADAM C POWELL BLVDOpen ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026M00508005-I1 · 2082 ADAM C POWELL BLVDOpen ↗
09/03/2026M00508005-P1 · 2082 ADAM C POWELL BLVDOpen ↗
09/03/2026M00508005-P2 · 2082 ADAM C POWELL BLVDOpen ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M00507965-P1 · 2082 ADAM C POWELL BLVDOpen ↗
08/31/2026M00507890-I1 · 2082 ADAM C POWELL BLVDOpen ↗
08/31/2026M00507890-I1 · 2082 ADAM C POWELL BLVDOpen ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/03/2026M00508005-I1 · 2082 ADAM C POWELL BLVDOpen ↗
Showing 1 of 2 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00507890-I1 · 2082 ADAM C POWELL BLVDOpen ↗