← Back
Entity
Wieden + Kennedy
Tenant
MANHATTAN · 1
1 building
1
Total Filings
1
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Signed off1100%
By project type
Alteration1
Most active buildings
All buildings →
150 VARICK STREETMANHATTAN · latest 01/29/2026
1 projects
Key relationships
Everyone →
Filing representatives
Contractors
Owners
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01115514 ↗150 VARICK STREET
MANHATTAN
AlterationSigned-off12/19/202401/29/2026
Contractor VERUS INC
SPRINKLER WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION TO 8TH FLOOR OFFICES. MODIFY EXISTING SPRINKLER SYSTEM FOR NEW ARCHITECTURAL LA…
Counts cover all 1 projects (1 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
CONTEXTUS ARCHITECTURE AND DESIGN110/24/2025
SOUTHPORT ENGINEERING ASSOCIATES110/24/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ADVANCED PLBG LLC110/24/2025
ADVANCED PLUMBING LLC110/24/2025
VERUS INC110/24/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
W.&M. OPERATING, LLC110/24/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ANZALONE ARCHITECTURE, PLLC110/24/2025
1 DOB NOW project, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 1Signed off 1
1 project
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01115514 ↗150 VARICK STREET
MANHATTAN
AlterationSigned-off12/19/202401/29/2026
Contractor VERUS INC
SPRINKLER WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION TO 8TH FLOOR OFFICES. MODIFY EXISTING SPRINKLER SYSTEM FOR NEW ARCHITECTURAL LA…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
150 VARICK STREET ↗110/24/2025
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature12
08/29/2026M01115514-P2 · 150 VARICK STREETOpen ↗
08/29/2026M01115514-P2 · 150 VARICK STREETOpen ↗
08/29/2026M01115514-P2 · 150 VARICK STREETOpen ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/30/2026M01115514-P3 · 150 VARICK STREETOpen ↗
09/30/2026M01115514-P3 · 150 VARICK STREETOpen ↗
08/29/2026M01115514-P2 · 150 VARICK STREETOpen ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWOER: Notice to Proceed5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type