| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01209685 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/09/2025 | 06/03/2026 | Design GENSLER Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Miscellaneous Demolition and replacement of existing fireproofing; Installation of new partitions, doors, finishes and ceilings on the 45th … |
| M01209615 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/09/2025 | 06/02/2026 | Design GENSLER Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Miscellaneous Demolition and replacement of existing fireproofing; Installation of new partitions, doors, finishes and suspended ceilings on… |
| M01209668 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/15/2025 | 06/02/2026 | Design GENSLER Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Miscellaneous Demolition and replacement of existing fireproofing. Installation of new partitions, doors, finishes and suspended ceilings on… |
| M01209696 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/12/2025 | 05/14/2026 | Design GENSLER Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Miscellaneous Demolition and replacement of existing fireproofing. Installation of new partitions, doors, finishes and suspended ceilings on… |
| M01209769 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/02/2025 | 05/14/2026 | Design SEVERUD ASSOCIATES Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Structural Modifications on the 36th Floor as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy. |
| M01209772 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/02/2025 | 05/14/2026 | Design SEVERUD ASSOCIATES Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Structural Modifications on the 45-46th Floor as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| ROBERT DERECTOR ASSOCIATES | 36 | 05/27/2026 |
| GENSLER | 18 | 06/10/2026 |
| SEVERUD ASSOCIATES | 6 | 04/20/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| JAMES E FITZGERALD INC | 32 | 06/10/2026 |
| PREFERRED SPKLR AND MECH | 14 | 05/27/2026 |
| PREFERRED MECHANICAL INC | 7 | 12/16/2025 |
| GENERAL PLUMBING CORP | 1 | 01/22/2025 |
| PAR FIRE PROTECTION LLC | 1 | 11/13/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| RIZZO GROUP | 32 | 06/10/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01209685 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/09/2025 | 06/03/2026 | Design GENSLER Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Miscellaneous Demolition and replacement of existing fireproofing; Installation of new partitions, doors, finishes and ceilings on the 45th … |
| M01209615 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/09/2025 | 06/02/2026 | Design GENSLER Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Miscellaneous Demolition and replacement of existing fireproofing; Installation of new partitions, doors, finishes and suspended ceilings on… |
| M01209668 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/15/2025 | 06/02/2026 | Design GENSLER Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Miscellaneous Demolition and replacement of existing fireproofing. Installation of new partitions, doors, finishes and suspended ceilings on… |
| M01209696 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/12/2025 | 05/14/2026 | Design GENSLER Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Miscellaneous Demolition and replacement of existing fireproofing. Installation of new partitions, doors, finishes and suspended ceilings on… |
| M01209769 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/02/2025 | 05/14/2026 | Design SEVERUD ASSOCIATES Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Structural Modifications on the 36th Floor as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy. |
| M01209772 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/02/2025 | 05/14/2026 | Design SEVERUD ASSOCIATES Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Structural Modifications on the 45-46th Floor as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy. |
| M01209777 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/02/2025 | 05/14/2026 | Design SEVERUD ASSOCIATES Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Structural Modifications on the 36-37, 43-44th Floors as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy… |
| M01209820 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/01/2025 | 05/14/2026 | Design ROBERT DERECTOR ASSOCIATES Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Modifications to the existing HVAC System and redistribution of ductwork and associated accessories on the 45th Floor as per plans (Willkie … |
| M01209739 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/02/2025 | 05/13/2026 | Design SEVERUD ASSOCIATES Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Structural Modifications and installation of stairs on the 34-36th Floors as per plans (Willkie Farr Gallagher - Phase 1.) No change to use,… |
| M01209788 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/01/2025 | 05/13/2026 | Design ROBERT DERECTOR ASSOCIATES Contractor JAMES E FITZGERALD INC | Modifications to the existing HVAC System and redistribution of ductwork and associated accessories on the 34 and 35th Floors as per plans (… |
| M01209804 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/01/2025 | 05/13/2026 | Design ROBERT DERECTOR ASSOCIATES Contractor JAMES E FITZGERALD INC | Modifications to the existing HVAC System and redistribution of ductwork and associated accessories on the 36th Floor as per plans (Willkie … |
| M01318144 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/16/2025 | 12/30/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED MECHANICAL INC | Install new plumbing fixtures (2) HWH, (2) WC, (2) Lavs, (3) DF/BF, (2) Sinks, (1) CM, (1) IM, (1) DW and associated CW/sanitary piping on t… |
| M01318186 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/16/2025 | 12/30/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED SPKLR AND MECH | Remove existing sprinkler heads; Install temporary heads and permanent heads and associated sprinkler piping on the 39 and 46th Floors as pe… |
| M01318195 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/16/2025 | 12/30/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED SPKLR AND MECH | Modifications to the existing Standpipe System; Remove (1) FHC per floor, and Install one (1) new Fire Hose Cabinet and associated Standpipe… |
| M01315399 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/19/2025 | 12/26/2025 | Design GENSLER Contractor JAMES E FITZGERALD INC | Miscellaneous Demolition; Installation of new partitions, doors, finishes and suspended ceilings on the 34th Floor as per plans (Willkie Far… |
| M01315673 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/19/2025 | 12/26/2025 | Design GENSLER Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Miscellaneous Demolition; Installation of new partitions, doors, finishes and suspended ceilings on the 39 and 46th Floors as per plans (Wil… |
| M01316938 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/16/2025 | 12/24/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED MECHANICAL INC Filer RIZZO GROUP | Install new fixtures: (2) HWH, (2) WC, (2) Lavs, (3) DF/BFs, (2) sinks, (1) CM, (1) DW, (1) IM and associated CW/sanitary piping on 40-42, 4… |
| M01316942 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/16/2025 | 12/24/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED SPKLR AND MECH | Remove existing sprinkler heads; Install temporary head and permanent heads and associated sprinkler piping on the 40-42nd and 47th Floors a… |
| M01316945 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/16/2025 | 12/24/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED SPKLR AND MECH | Modifications to the existing Standpipe System; Remove (1) FHC per floor, and Install one (1) new Fire Hose Cabinet and associated Standpipe… |
| M01315755 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/16/2025 | 12/23/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED MECHANICAL INC Filer RIZZO GROUP | Install new fixtures: (1) HWH, (1) grease interceptor, (2) DFs, (2) sinks, (1) IM, (1) CM, (1) DW and associated CW/sanitary piping on the 3… |
| M01315761 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/16/2025 | 12/23/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED SPKLR AND MECH | Remove (253) existing heads and piping; Install (280) new heads and (42) temporary heads and associated sprinkler piping on the 34th Floor a… |
| M01315800 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/16/2025 | 12/23/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED SPKLR AND MECH | Modifications to the existing Standpipe System; Remove (1) FHC per floor, and Install one (1) new Fire Hose Cabinet and associated Standpipe… |
| M01315403 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/17/2025 | 12/19/2025 | Design SEVERUD ASSOCIATES Contractor JAMES E FITZGERALD INC | Structural Modifications on the 34th & 41st Floors as per plans (Willkie Farr Gallagher - Phase 2/ Package #11 and Package #12.) No change t… |
| M01315407 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/16/2025 | 12/19/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor JAMES E FITZGERALD INC | Modifications to the existing HVAC System and redistribution of ductwork and associated accessories on the 34th Floor as per plans (Willkie … |
| M01315702 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/17/2025 | 12/19/2025 | Design SEVERUD ASSOCIATES Contractor JAMES E FITZGERALD INC | Structural Modifications on the 39th Floor Floor as per plans (Willkie Farr Gallagher - Phase 3/ Package #13.) No change to use, egress or o… |
| M01315811 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/16/2025 | 12/19/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Modifications to the existing HVAC System: Furnish & install ductwork, HVAC Units and BMS Controls throughout the 39th and 46th Floors as pe… |
| M01316934 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/16/2025 | 12/19/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor JAMES E FITZGERALD INC | Modifications to the existing HVAC System and redistribution of ductwork and associated accessories on the 40-42nd and 47th Floor as per pla… |
| M01209712 ↗ | 787 7 AVENUE MANHATTAN | Alteration CO | Permit Issued | 05/07/2025 | 08/14/2025 | Design GENSLER Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Modifications to add Places of Assembly on the 35th, 36th and 45th Floors as per plans (Willkie Farr Gallagher - Phase 1.) |
| M01209802 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/01/2025 | 07/17/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED SPKLR AND MECH Filer RIZZO GROUP | Install (100) new sprinkler heads and associated piping on the 35th Floor; Remove(20) existing heads, Install (6) temporary and (1) new head… |
| M01209842 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/01/2025 | 07/17/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED SPKLR AND MECH Filer RIZZO GROUP | Modifications to the existing Sprinkler System: Remove (225) sprinkler heads, Install (36) temporary heads and (242) new heads and associate… |
| M01209814 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/01/2025 | 07/16/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED SPKLR AND MECH Filer RIZZO GROUP | Modifications to the existing Sprinkler System: Remove (242) existing heads, Install (39) temporary heads and (273) new heads and piping on … |
| M01209847 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/01/2025 | 07/16/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED MECHANICAL INC Filer RIZZO GROUP | Furnish and install new plumbing fixtures throughout space and associated CW/sanitary piping on the 37, 43-44th Floor as per plans (Willkie … |
| M01209848 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/01/2025 | 07/16/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED SPKLR AND MECH Filer RIZZO GROUP | Install (271) new heads, (40) temp heads, remove (251) heads on 37th Floor, Install (238) new, (36) temp and remove (219) on 43rd Floor, Ins… |
| M01209799 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/01/2025 | 07/15/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED MECHANICAL INC | Install New: (2) grease interceptors, (7) FDs, (2) HWH, (1) hand sink, (2) DFs, (4) lavatories, (4) WCs and associated CW/sanitary piping on… |
| M01209809 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/01/2025 | 07/15/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED MECHANICAL INC Filer RIZZO GROUP | Install new fixtures: (9) Lavatories, (6) WCs, (2) UR, (3) DFs, (1) CM, (1) IM, (1) DW, (3) sinks, (12) FDs and associated CW/sanitary pipin… |
| M01209826 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/01/2025 | 07/15/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED MECHANICAL INC Filer RIZZO GROUP | Install (10) FDs, (8) Lavs, (8) WCs, (1) MS, (2) DFs, (1) HWH, (2) HS's and associated CW/sanitary piping on the 45th Floor as per plans (Wi… |
| M01212703 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/01/2025 | 07/15/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED SPKLR AND MECH Filer RIZZO GROUP | Modifications to the existing Standpipe System; Remove (1) FHC and Install one (1) new Fire Hose Cabinet and associated Standpipe Piping on … |
| M01212716 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/01/2025 | 07/15/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED SPKLR AND MECH Filer RIZZO GROUP | Modifications to the existing Standpipe System; Remove (1) FHC, and Install one (1) new Fire Hose Station, angle valve, 125 ft of hose assem… |
| M01212753 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/01/2025 | 07/15/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED SPKLR AND MECH Filer RIZZO GROUP | Modifications to the existing Standpipe System; Remove (1) FHC per floor, and Install one (1) new Fire Hose Cabinet and associated Standpipe… |
| M01213655 ↗ | 787 7 AVENUE MANHATTAN | No Work | Filed — no permit on record | 05/28/2025 | — | Design GENSLER | — |
| M01213669 ↗ | 787 7 AVENUE MANHATTAN | No Work | Filed — no permit on record | 05/28/2025 | — | Design GENSLER | — |
| M01213681 ↗ | 787 7 AVENUE MANHATTAN | No Work | Filed — no permit on record | 05/28/2025 | — | Design GENSLER | — |
| M01213698 ↗ | 787 7 AVENUE MANHATTAN | No Work | Filed — no permit on record | 05/28/2025 | — | Design GENSLER | — |
| M01209845 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/01/2025 | 05/06/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Modifications to the existing HVAC System and redistribution of ductwork and associated accessories on the 37, 43-44th Floors as per plans (… |
| M01161528 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 01/22/2025 | 03/05/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor GENERAL PLUMBING CORP | Modifications to the existing plumbing system on the (34, 35, 36, 37, 43, 44, 45 Floors - Willkie Farr) as per plans. No change to use, egre… |
| M01164169 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 01/22/2025 | 02/13/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor PREFERRED SPKLR AND MECH Filer RIZZO GROUP | Modifications to the existing sprinkler/ standpipe system on the (34, 35, 36, 37, 43, 44, 45 Floors - Willkie Farr) as per plans. No change … |
| M01161437 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 01/29/2025 | 02/04/2025 | Design GENSLER Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (34, 35, 36, 37, 43, 44, 45 Floors- Will… |
| M01161486 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 01/22/2025 | 01/24/2025 | Design ROBERT DERECTOR ASSOCIATES Contractor JAMES E FITZGERALD INC | Modifications to the existing HVAC system on the (34, 35, 36, 37, 43, 44, 45 Floors - Willkie Farr) as per plans. No change to use, egress o… |
| M01135303 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 11/08/2024 | 11/18/2024 | Design ROBERT DERECTOR ASSOCIATES Contractor LAWRENCE J. LEVINE Filer RIZZO GROUP | Modifications to the existing sprinkler system on the (37th Floor- WFG Mockup) as per plans. No change to use, egress or occupancy. |
| M01135300 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 11/08/2024 | 11/15/2024 | Design ROBERT DERECTOR ASSOCIATES Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Modifications to the existing HVAC system on the (37th Floor- WTF Mockup) as per plans. No change to use, egress or occupancy. |
| M01135291 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 11/07/2024 | 11/13/2024 | Design GENSLER Contractor JAMES E FITZGERALD INC | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (37th Floor- WFG Mockup) as per plans. N… |
| M08010332 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 10/07/2022 | 10/12/2022 | Design ROBERT DERECTOR ASSOCIATES Contractor JAMES E FITZGERALD INC | Modifications to the existing HVAC System: Cut & Cap; F&I Ductwork with insulation, grilles, diffusers, VAV box and provide air balancing of… |
| M08010261 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 10/07/2022 | — | Design GENSLER Filer RIZZO GROUP | — |
| M00668781 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 02/18/2022 | 02/23/2022 | Design GENSLER Contractor JAMES E FITZGERALD INC | Minor interior demolition. Installation of demountable partitions, suspended ceilings, sheetrock partitions, HM & hardware, flooring and fin… |
| M00526245 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 10/14/2021 | 10/22/2021 | Design GENSLER Contractor JAMES E FITZGERALD INC | Minor interior demo & removal of carpet; Installation of new suspended ceilings, walls, flooring and finishes as per plans (Tenant Work - Wi… |
| M00551675 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 07/27/2021 | 10/14/2021 | Design GENSLER Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Minor interior demolition. Installation of new pantry fixtures, partitions, flooring, suspended ceilings and finishes as per plans (Willkie … |
| M00575218 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 08/30/2021 | 10/13/2021 | Design GENSLER Contractor JAMES E FITZGERALD INC | Minor interior demolition. Installation of new flooring, partitions, suspended ceilings, finishes and millwork as per plans (Willkie Farr - … |
| M00552822 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 07/27/2021 | 07/27/2021 | Design ROBERT DERECTOR ASSOCIATES Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Modifications to the existing HVAC System; Install new AC Unit including BMS Controls and Provide boot and tap at pantries as per plans (Wil… |
| M00229768 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Permit Issued | 10/11/2019 | 10/22/2019 | Design ROBERT DERECTOR ASSOCIATES Contractor JAMES E FITZGERALD INC Filer RIZZO GROUP | Modifications to the existing HVAC system: Install new duct work, boot and taps, VAV boxes, Grilles, Diffusers and controls as per plans (Wi… |
| M00212060 ↗ | 787 7 AVENUE MANHATTAN | Alteration | Signed-off | 08/28/2019 | 09/27/2019 | Design ROBERT DERECTOR ASSOCIATES Contractor JAMES E FITZGERALD INC | Removal of AC Unit and all associated duct work, air outlets, piping and power controls as per plans (Willkie Farr - Early Demo Phase.) No c… |
| Building | Filings | Most Recent |
|---|---|---|
| 787 7 AVENUE ↗ | 60 | 06/10/2026 |