| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01351282 ↗ | 135-31 40TH ROAD QUEENS | Alteration | Permit Issued | 01/30/2026 | 04/15/2026 | Design A & T ENGINEERING, P.C. Contractor ZCREW CONSTRUCTION CORP | Emergency Ordinary Structural Repair to remediate fire damage on the 2nd and 3rd floors, pursuant to an Order to Remedy issued by the DOB Em… |
| Q01288686 ↗ | 135-31 40TH ROAD QUEENS | Alteration | Signed-off | 09/19/2025 | 09/30/2025 | Contractor DYKER SOLUTIONS Filer YBL NY INC | ALTERATION TYPE 2 (DIRECTIVE 14/1975) APPLICATION FILED FOR INSTALLATION COMMERCIAL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM. |
| Q00618185 ↗ | 135-31 40TH ROAD QUEENS | Alteration | Signed-off | 11/09/2021 | 11/14/2023 | Contractor MPS PLUMBING & HEATING IN Filer YBL NY INC | MODIFY SPRINKLER SYSTEM ACCORDING TO NEW LAYOUT ON THE CELLAR & 1ST FLOOR IN CONJUCTION WITH JOB#Q00687075. NO CHANGE IN USE, EGRESS AND OCC… |
| Q00687075 ↗ | 135-31 40TH ROAD QUEENS | Alteration CO | Permit Issued | 03/02/2022 | 05/23/2023 | Contractor SHUN XING CAPITAL IMPT IN Filer YBL NY INC | JOB FILED TO CHANGE THE CEL USE IN THE EXISTING 3-STORY BUILIDNG AS PER PLAN AND GET NEW CERTIFICATE OF OCCUPANCY. |
| Q00071526 ↗ | 41-07 BELL BOULEVARD QUEENS | Alteration | Signed-off | 09/12/2018 | 02/21/2019 | Design D&E BUILD EVERGREEN INC. Contractor NEPTUNE SIGNS&AWNINGS INC | EXTERIOR RENOVATION ON AN EXISTING BUILDING WITH LEGALIZING 2 ILLUMINATES SIGNS(NON-FLASH) FOR STOREFRONT; TO REMOVE E.C.B. VIOLATION: 35347… |
| Name | Projects together | Most recent |
|---|---|---|
| Urban Architectural Design | 3 | 06/11/2026 |
| A & T Engineering | 1 | 07/31/2026 |
| A&B World Consulting | 1 | 07/05/2023 |
| D&E Build Evergreen | 1 | 09/12/2018 |
| Name | Projects together | Most recent |
|---|---|---|
| Dyker Solutions | 1 | 09/19/2025 |
| M. International Engineering | 1 | 07/05/2023 |
| MPS Plumbing & Heating | 1 | 07/05/2023 |
| Neptune Signs & Awnings | 1 | 09/12/2018 |
| Shun Xing Capital Impt | 1 | 06/11/2026 |
| Zcrew Construction | 1 | 07/31/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| YO Garden Xiao Long Bao | 4 | 07/31/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| YBL NY | 3 | 06/11/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01351282 ↗ | 135-31 40TH ROAD QUEENS | Alteration | Permit Issued | 01/30/2026 | 04/15/2026 | Design A & T ENGINEERING, P.C. Contractor ZCREW CONSTRUCTION CORP | Emergency Ordinary Structural Repair to remediate fire damage on the 2nd and 3rd floors, pursuant to an Order to Remedy issued by the DOB Em… |
| Q01288686 ↗ | 135-31 40TH ROAD QUEENS | Alteration | Signed-off | 09/19/2025 | 09/30/2025 | Contractor DYKER SOLUTIONS Filer YBL NY INC | ALTERATION TYPE 2 (DIRECTIVE 14/1975) APPLICATION FILED FOR INSTALLATION COMMERCIAL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM. |
| Q00618185 ↗ | 135-31 40TH ROAD QUEENS | Alteration | Signed-off | 11/09/2021 | 11/14/2023 | Contractor MPS PLUMBING & HEATING IN Filer YBL NY INC | MODIFY SPRINKLER SYSTEM ACCORDING TO NEW LAYOUT ON THE CELLAR & 1ST FLOOR IN CONJUCTION WITH JOB#Q00687075. NO CHANGE IN USE, EGRESS AND OCC… |
| Q00687075 ↗ | 135-31 40TH ROAD QUEENS | Alteration CO | Permit Issued | 03/02/2022 | 05/23/2023 | Contractor SHUN XING CAPITAL IMPT IN Filer YBL NY INC | JOB FILED TO CHANGE THE CEL USE IN THE EXISTING 3-STORY BUILIDNG AS PER PLAN AND GET NEW CERTIFICATE OF OCCUPANCY. |
| Q00071526 ↗ | 41-07 BELL BOULEVARD QUEENS | Alteration | Signed-off | 09/12/2018 | 02/21/2019 | Design D&E BUILD EVERGREEN INC. Contractor NEPTUNE SIGNS&AWNINGS INC | EXTERIOR RENOVATION ON AN EXISTING BUILDING WITH LEGALIZING 2 ILLUMINATES SIGNS(NON-FLASH) FOR STOREFRONT; TO REMOVE E.C.B. VIOLATION: 35347… |
| Building | Filings | Most Recent |
|---|---|---|
| 135-31 40TH ROAD ↗ | 4 | 07/31/2026 |
| 41-07 BELL BOULEVARD ↗ | 1 | 09/12/2018 |