← Back
Other college and university
Wagner College
631 HOWARD AVENUE · BIN 5113454
💬 Discuss this project
1921Year Built
2Stories
W6Building Class
R3-1Zoning
521,405 sfGross Floor Area
1Units
Rent Stabilized13 Open Violations ▸FISP: SAFEFDNY Report ↗
Other college and university · 2,299,578 sf lot · 0.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof8p · 4 filings · 20 docs
Floor 42p · 1 filing · 12 docs
Floor 31p · 1 filing · 12 docs
Floor 2
Floor 130p · 3 filings · 20 docs
Cellar3p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WAGNER COLLEGE10807/08/2026
TRIBORO CONTRACTING REMODELING5307/08/2026
NEW AMERICAN CONSTRUCTION INC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES1203/21/2026
OUTSOURCE CONSULTANTS, INC.1003/21/2026
ATLANTIC BUILDING SUPPLY INC.603/21/2026
WLA ENGINEERING P C203/21/2026
KAS203/21/2026
TOTAL EXPEDITING203/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIBORO CONTRACTING & REMGeneral Contractor3007/08/2026
TORCON, INCGeneral Contractor2107/08/2026
DNP BUILDERS LLCGeneral Contractor1007/08/2026
SOLUTION MECH CONTNG LLCPlumbing307/08/2026
GAGAN G.C. INCGeneral Contractor303/21/2026
SCARAN OIL SERVICE INCGeneral Contractor203/21/2026
PERFECTAIRE CO INCGeneral Contractor203/21/2026
COMCELL CONSTRUCTION CORP.General Contractor107/08/2026
LAURA ELEC'L LIGHTING &Electrical103/22/2026
CLINTON COURTNEYElectrical103/21/2026
POWER COOLING INCGeneral Contractor107/08/2026
JOSEPH BONURAElectrical103/21/2026
HESCOTT, CARDINALElectrical103/21/2026
SCARAN PLUMBING INCPlumbing107/08/2026
SMART PLBG & HTG CORPPlumbing107/08/2026
ARCHER CONSULTANTS GROUPFire Protection107/08/2026
RAMSARRAN, RAMESHElectrical103/21/2026
PACE PLUMBING CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IKRA CONSULTING LLC7032210/28/2025
OUTSOURCE SPECIAL INSPECT2827906/16/2025
NEW AGE ENGINEERING PLLC7746211/14/2024
EMPIRE DESIGN CORP5474203/12/2024
RELIANCE ENGINEERING, P.C322206/22/2022
WINTON GROUP ARCHITECTURE4343207/12/2021
ELEVATED ENGINEERING PLLC3692206/21/2021
A TECH ENGINEERING NYC, P6738109/25/2020
Building Lifecycle
All (223)Filed (35)Permit Issued (53)Signed Off (18)Facade (FISP) (12)Violation (60)Inspection (11)Objection (4)Special Inspection (30)
10/28/2025
Filed — Alteration
S01299412-I1
10/28/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 1 CAMPUS ROAD, STATEN ISLAND AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
S01299403-I1
10/28/2025
Permit issued — Supported Scaffold
S01299403-I1-SF
10/28/2025
Permit issued — Sidewalk Shed
S01299412-I1-SH
10/07/2025
Special inspection requirement — Post-installed Anchors
MD MOSTAFA
09/18/2025
Signed off — Alteration
MECHANICAL WORK AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
S00848824-I1
09/17/2025
Permit issued — Plumbing
S01133375-S1-PL
09/11/2025
Signed off — Alteration
INTERIOR PLUMBING WORK FOR WAGNER COLLEGE AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
S00848736-I1
09/11/2025
Signed off — Alteration
RENOVATION OF EXISTING DORM BUILDING ON WAGNER COLLEGE CAMPUS. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
S00848208-I1
08/27/2025
Signed off — Alteration
STRUCTURAL WORK AS SHOWN HEREIWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
S00848790-I1
08/26/2025
Permit issued — General Construction
S00848208-I1-GC
08/26/2025
Permit issued — Structural
S00848790-I1-ST
08/26/2025
Permit issued — Mechanical Systems
S00848824-I1-MS
08/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/14/2025
Signed off — Alteration
ADDITION AND MODIFICATION TO EXISTING SPRINKLER SYSTEM AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
S00848687-I1
07/31/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/23/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/18/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/16/2025
Permit issued — Sprinklers
S00848687-I1-EW-SP
07/08/2025
Violation issued (FDNY_NOV, closed)
06/16/2025
Filed — Alteration
ADDITION AND MODIFICATION TO EXISTING SPRINKLER SYSTEM AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
S00848687-P1
06/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
06/16/2025
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
04/08/2025
Signed off — Alteration
herewith filing for facade and roof restoration at Guild Hall as indicated on plans. no change of egress use or occupancy .
S00824237-I1
04/08/2025
Signed off — Alteration
GENERAL CONSTRUCTION FOR FACADE/ROOF WORK AS SHOWN HEREWITH FOR GUILD HALL. NO CHANGES TO EGRESS, OCCCUPANCY OR USE.
S00825811-I1
03/06/2025
Permit issued — Structural
S00848790-I1-ST
02/06/2025
Permit issued — General Construction
S00848208-I1-GC
02/06/2025
Permit issued — Mechanical Systems
S00848824-I1-MS
02/05/2025
Permit issued — Sprinklers
S00848687-I1-EW-SP
12/26/2024
Permit issued — Sidewalk Shed
S08028781-I1-SH
12/26/2024
Permit issued — Construction Fence
S00824694-I1-FN
12/26/2024
Permit issued — Supported Scaffold
S00988825-I1-SF
12/26/2024
Permit issued — Protection and Mechanical Methods
S01017670-I1-PMM
12/02/2024
Permit issued — Mechanical Systems
S01133375-I1-MS
11/14/2024
Filed — Alteration
INSTALL NEW HEAT PUMP HOT WATER HEATING SYSTEM AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
S01133375-I1
11/14/2024
Filed — Alteration
INSTALL NEW HEAT PUMP HOT WATER HEATING SYSTEM AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
S01133375-S1
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
11/12/2024
Special inspection requirement — Maintenance information
Stephen Shishko
11/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
11/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
11/12/2024
Special inspection requirement — Maintenance information
Stephen Shishko
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
11/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
11/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
10/28/2024
Special inspection requirement — Mechanical Systems
Stephen Shishko
10/28/2024
Special inspection requirement — Final
Stephen Shishko
10/16/2024
Violation issued (FDNY_NOV, closed)
10/16/2024
Violation issued (FDNY_NOV, closed)
10/16/2024
Violation issued (FDNY_NOV, closed)
10/16/2024
Violation issued (FDNY_NOV, closed)
10/03/2024
Violation issued (FDNY_NOV, closed)
07/03/2024
Violation issued (FDNY_NOV, closed)
06/21/2024
Permit issued — Mechanical Systems
S00848824-I1-MS
06/21/2024
Permit issued — General Construction
S00848208-I1-GC
06/20/2024
Permit issued — Plumbing
S00848736-I1-PL
06/04/2024
Violation issued (FDNY_NOV, closed)
05/14/2024
Violation issued (FDNY_NOV, closed)
03/24/2024
Violation issued (FDNY_NOV, closed)
03/19/2024
Filed — Alteration
RENOVATION TO LECTURE ROOMS ON THE SECOND FLOOR, ROOMS 200, 201, 207 & 208. INTERIOR MINOR REMOVAL OF THE FOLLOWING: CARPET AND SUBFLOOR, ELECTRICAL CONDUIT, REMOVAL OF INTERIOR WALLS FOR ONE-WAY GLASS, AND CONCRETE CORING.
S01015527-I1
Latest 60 of 223 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedTRIBORO CONTRACTING & REM10/28/2025
DOB NOWSidewalk ShedPermit IssuedTRIBORO CONTRACTING & REM10/28/2025
DOB NOWPlumbingPermit IssuedSMART PLBG & HTG CORP09/17/2025
DOB NOWGeneral ConstructionSigned-offTORCON, INC08/26/2025
DOB NOWStructuralSigned-offTORCON, INC08/26/2025
DOB NOWMechanical SystemsSigned-offTORCON, INC08/26/2025
DOB NOWSprinklersSigned-offARCHER CONSULTANTS GROUP07/16/2025
DOB NOWStructuralSigned-offTORCON, INC03/06/2025
DOB NOWGeneral ConstructionSigned-offTORCON, INC02/06/2025
DOB NOWMechanical SystemsSigned-offTORCON, INC02/06/2025
DOB NOWSprinklersSigned-offMANENGEERING BUREAU, INC02/05/2025
DOB NOWSidewalk ShedPermit IssuedTRIBORO CONTRACTING & REM12/26/2024
DOB NOWConstruction FencePermit IssuedTRIBORO CONTRACTING & REM12/26/2024
DOB NOWSupported ScaffoldPermit IssuedTRIBORO CONTRACTING & REM12/26/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedTRIBORO CONTRACTING & REM12/26/2024
DOB NOWMechanical SystemsPermit IssuedPOWER COOLING INC12/02/2024
DOB NOWMechanical SystemsSigned-offTORCON, INC06/21/2024
DOB NOWGeneral ConstructionSigned-offTORCON, INC06/21/2024
DOB NOWPlumbingSigned-offSOLUTION MECH CONTNG LLC06/20/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedTRIBORO CONTRACTING & REM03/14/2024
DOB NOWGeneral ConstructionSigned-offTORCON, INC02/06/2024
DOB NOWMechanical SystemsSigned-offTORCON, INC02/06/2024
DOB NOWSupported ScaffoldPermit IssuedTRIBORO CONTRACTING & REM02/05/2024
DOB NOWSidewalk ShedPermit IssuedTRIBORO CONTRACTING & REM01/10/2024
DOB NOWConstruction FencePermit IssuedTRIBORO CONTRACTING & REM01/10/2024
DOB NOWStructuralSigned-offTORCON, INC05/25/2023
DOB NOWPlumbingSigned-offSOLUTION MECH CONTNG LLC05/24/2023
DOB NOWMechanical SystemsSigned-offTORCON, INC05/15/2023
DOB NOWGeneral ConstructionSigned-offTORCON, INC05/15/2023
DOB NOWGeneral ConstructionSigned-offTORCON, INC04/13/2023
DOB NOWGeneral ConstructionSigned-offTORCON, INC04/13/2023
DOB NOWSidewalk ShedSigned-offTRIBORO CONTRACTING & REM02/08/2023
DOB NOWConstruction FencePermit IssuedTRIBORO CONTRACTING & REM02/08/2023
DOB NOWSupported ScaffoldSigned-offTRIBORO CONTRACTING & REM02/08/2023
DOB NOWMechanical SystemsSigned-offDNP BUILDERS LLC01/09/2023
DOB NOWMechanical SystemsSigned-offSCARAN OIL SERVICE INC12/13/2022
DOB NOWSidewalk ShedPermit IssuedTRIBORO CONTRACTING & REM10/27/2022
DOB NOWMechanical SystemsSigned-offDNP BUILDERS LLC10/26/2022
DOB NOWGeneral ConstructionSigned-offTRIBORO CONTRACTING & REM08/03/2022
DOB NOWMechanical SystemsSigned-offDNP BUILDERS LLC05/04/2022
+ 53 more permits on file
1 project · most recent 12/15/2021
Gas Water/Sanitary
FiledStatusContractorScope
12/15/2021Permit IssuedSCARAN PLUMBING INCGas, Water/Sanitary
15 projects · most recent 04/25/2025
General Wiring
FiledStatusContractorScope
04/25/2025Permit IssuedMOLLOY ELECTRIC INCGeneral Wiring
09/10/2024CompleteLAURA ELEC'L LIGHTING &—
08/19/2024Permit IssuedTANACHION ELEC'L CONT'G IGeneral Wiring
08/03/2023CompleteLAURA ELEC'L LIGHTING &—
06/22/2023Permit IssuedTANACHION ELEC'L CONT'G I—
06/08/2023CompleteJSP ELECTL CNTNG CORPGeneral Wiring
05/23/2023CompleteERIN ELEC'L CONTR'G INCOR—
05/08/2023Permit IssuedLAURA ELEC'L LIGHTING &—
04/11/2023Permit IssuedLAURA ELEC'L LIGHTING &—
04/11/2023Permit IssuedLAURA ELEC'L LIGHTING &—
02/16/2023Permit IssuedLIT MODE ELECL CONTG INC—
11/16/2021CompleteDEMAND ELECTRIC INC—
10/05/2021CompleteDEMAND ELECTRIC INC—
10/27/2019Permit IssuedTANACHION ELEC'L CONT'G IGeneral Wiring
11/16/2018CompleteRICHARD NEU—
1 project · most recent 05/06/2022
FiledStatusContractorScope
05/06/2022——1 scope_items
2 projects · most recent 10/28/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/28/2025Permit IssuedTRIBORO CONTRACTING & REMScaffold
10/26/2022Permit IssuedTRIBORO CONTRACTING & REMSidewalk Shed
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
08/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/24/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/13/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
10/07/2025Post-installed AnchorsMD MOSTAFAspecial
06/16/2025Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
06/16/2025Sprinkler SystemsJONAR MADRIAGAspecial
06/16/2025Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
11/12/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
11/12/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
11/12/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
11/12/2024Maintenance informationStephen Shishkoenergy_progress
11/12/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
11/12/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
11/12/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
11/12/2024Maintenance informationStephen Shishkoenergy_progress
10/28/2024Mechanical SystemsStephen Shishkospecial
10/28/2024FinalStephen Shishkoprogress
03/10/2024Post-installed AnchorsMd Rashidspecial
03/06/2024FinalDavid Darcyprogress
03/06/2024Fire-Resistant Penetrations and Joints—special
10/23/2023Sprinkler SystemsJONAR MADRIAGAspecial
10/23/2023Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
10/23/2023Tenant Protection Plan Compliance—special
05/23/2023Concrete - Cast-In-PlaceJONAR MADRIAGAspecial
05/23/2023Post-installed AnchorsJONAR MADRIAGAspecial
05/23/2023FinalJONAR MADRIAGAprogress
05/23/2023Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
05/23/2023Structural Steel - WeldingJONAR MADRIAGAspecial
Latest 25 of 78.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Guild HallEducation—
Project S00825811 Alteration · LOC Issued · 03/01/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 608 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch30
08/26/2026S00100851-I1Request digital key ↗
08/25/2026S00552780-I1Request digital key ↗
08/25/2026S00552752-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026S00311662-I1Request digital key ↗
08/15/2026S00311662-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna2
08/25/2026S00404738-P1Request digital key ↗
08/15/2026S00404738-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026S00403490-I1Request digital key ↗
▸Applications & Permits83
▸BISPLAN / WORK APPROVAL APPLICATION44
11/13/2019520392511Open ↗
10/07/2019520392511Open ↗
11/30/2018520363990Open ↗
Showing 3 of 44 on file for this type
▸BISWORK PERMIT APPLICATION35
06/25/2021520392511Open ↗
03/25/2021520392511Open ↗
12/10/2020520392511Open ↗
Showing 3 of 35 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT- FINAL LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications208
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION50
10/07/2019520392511Open ↗
01/07/2019520363990Open ↗
11/30/2018520363990Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWProgress Inspector Seal & Signature44
09/29/2026S00848824-I1Open ↗
09/29/2026S00848824-I1Open ↗
09/29/2026S00848824-I1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
08/26/2026S00311662-I1Open ↗
08/26/2026S00311662-P1Open ↗
08/25/2026S00404738-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/30/2026S00848687-P1Open ↗
09/30/2026S00848687-P1Open ↗
09/29/2026S00848824-I1Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST20
11/13/2019520392511Open ↗
10/07/2019520392511Open ↗
11/30/2018520363990Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
11/30/2018520363990Open ↗
01/18/2018520322437Open ↗
01/18/2018520322446Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/22/2014540046047Open ↗
09/04/2013540026032Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/22/2014540046047Open ↗
09/04/2013540026032Open ↗
▸BISProfessional and Owner Certification (POC3)1
10/07/2019520392511Open ↗
▸Trade Schedules & Equipment34
▸BISSELF-CERT PLUMBING NOTICE10
04/22/2014520113010Open ↗
09/24/2013520097975Open ↗
09/18/2013520117427Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING8
09/04/2013540026032Open ↗
Showing 1 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
01/18/2018520322437Open ↗
01/18/2018520322446Open ↗
09/04/2013540026032Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/07/2019520363990Open ↗
08/01/2014520084435Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/22/2014540026032Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
07/29/2013520113010Open ↗
▸BISEQUIPMENT USE PERMITS1
08/01/2014520084435Open ↗
▸BISBOILER APPROVAL : 900A1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTenant Protection Plan and Notes1
10/07/2019520392511Open ↗
▸Environmental & Asbestos39
▸BISDEP ASBESTOS PROJECT COMPLETION FORM8
11/13/2014520194708Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/25/2026S00552752-I1Open ↗
08/25/2026S00552701-I1Open ↗
08/24/2026S00756782-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
10/07/2019520392511Open ↗
01/18/2018520322437Open ↗
04/14/2014520190356Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026S00404738-P1Open ↗
08/15/2026S00404738-I1Open ↗
08/13/2026S00711119-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS INSPECTION REPORT1
05/05/2014520194708Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Completion Form1
08/13/2026S00848687-I1Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
10/07/2019520392511Open ↗
01/07/2019520363990Open ↗
11/30/2018520363990Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
01/07/2019520363990Open ↗
12/05/2014540026032Open ↗
09/25/2014520084435Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026S00552752-I1Open ↗
08/13/2026S00552701-I1Open ↗
08/13/2026S00749271-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/29/2021520392511Open ↗
09/04/2013540026032Open ↗
▸BISTR8: Energy Code Progress Inspections1
06/06/2014520194708Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/29/2021520392511Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/22/2014540046047Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00749271-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/29/2021520392511Open ↗
04/22/2014540046047Open ↗
09/04/2013540026032Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
07/09/2014520084435Open ↗
01/09/2014520084435Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs78
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
08/25/2026S00552752-I1Open ↗
08/23/2026S00848790-I1Open ↗
08/13/2026S00311662-P1Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS20
10/07/2019520392511Open ↗
11/30/2018520363990Open ↗
01/18/2018520322437Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
11/03/2021520392511Open ↗
01/07/2019520363990Open ↗
01/05/2015540026032Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDEP Variance (V5) letter8
08/13/2026S00756782-I1Open ↗
08/13/2026S00824237-I1Open ↗
08/13/2026S00848208-I1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
12/10/2020520392511Open ↗
07/09/2014520084435Open ↗
07/09/2014520084435Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER2
06/25/2021520392511Open ↗
03/25/2021520392511Open ↗
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT39
10/07/2019520392511Open ↗
10/07/2019520392511Open ↗
10/07/2019520392511Open ↗
Showing 3 of 39 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
10/29/2021520392511Open ↗
10/29/2021520392511Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms39
▸BISEFILING COVER SHEET21
10/07/2019520392511Open ↗
11/30/2018520363990Open ↗
01/18/2018520322437Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION13
11/13/2019520392511Open ↗
07/09/2014520084435Open ↗
07/07/2014520194708Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM3
12/10/2020520392511Open ↗
10/28/2019520392511Open ↗
01/07/2019520363990Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
04/22/2014540046047Open ↗
09/04/2013540026032Open ↗
▸Other Documents4
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/25/2020520392511Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/16/2014520194708Open ↗
▸BISPROOF OF FEE EXEMPTION1
10/07/2019520392511Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026S00848687-P1Open ↗