| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01224070 ↗ | 1176 OCEAN PARKWAY BROOKLYN | Alteration | Permit Issued | 08/01/2025 | 08/19/2026 | Design THE MTM DESIGN GROUP, LLC | Modification to existing VERIZON site on the roof. Install 6 antennas, 3 RRH units, 3 OVP's, 2 GPS antennas and 1 equipment platform w/ cabi… |
| Q00034367 ↗ | 136-05 SANFORD AVENUE QUEENS | Alteration | Permit Issued | 08/31/2020 | 07/29/2026 | Design APT ENGINEERING Owner MURRAY HILL MANAGEMENT | Modification to existing VERIZON site on the roof. Replacement of (12) antennas. Removal of (6) RRH units and (6) cabinets. Installation of … |
| B00081990 ↗ | 1114 NEW YORK AVENUE BROOKLYN | Alteration | Permit Issued | 03/15/2019 | 07/10/2026 | — | VERIZON - Replacement of existing antennas on the roof. All work in compliance with TPPN 5/98. No change to occupancy, use or egress. |
| B01214723 ↗ | 1673 49 STREET BROOKLYN | Alteration | Permit Issued | 08/14/2025 | 07/06/2026 | Design FRENCH & PARRELLO ASSOCIATES | Modification to existing Verizon site. REMOVE 1 CABINET, 1 ANTENNA, AND 2 RRH's, REPLACE 2 ANTENNAS AND 2 RRH's, AND INSTALL 6 ANTENNAS, 4 R… |
| Q00886820 ↗ | 9-02 38 AVENUE QUEENS | Alteration | Permit Issued | 09/20/2023 | 06/17/2026 | Design JAMES H. FAHEY | Modification to Verizon site. Remove 3 antennas, remove cabinet. Replace 6 antennas, 6 RRH units. Install 3 antennas, 2 microwave antennas, … |
| B01263632 ↗ | 149 HAMILTON AVENUE BROOKLYN | Alteration | Signed-off | 08/21/2025 | 04/22/2026 | Modification of existing T-Mobile site. Remove 3 RRH units and 3 equipment cabinets and install 2 new equipment cabinets on roof. No change … |
| Name | Projects together | Most recent |
|---|---|---|
| KMB DESIGN GROUP, LLC | 35 | 11/12/2025 |
| JAMES H. FAHEY | 29 | 02/11/2026 |
| SCHERER DESIGN GROUP | 13 | 06/29/2026 |
| APT ENGINEERING | 12 | 08/04/2025 |
| THE MTM DESIGN GROUP, LLC | 11 | 11/14/2025 |
| TECTONIC ENGINEERING | 8 | 03/30/2023 |
| ELEVATED ENGINEERING, PLLC | 6 | 01/07/2025 |
| GRANT ENGINEERING CONSULTANTS, LLC | 6 | 10/30/2025 |
| FRENCH & PARRELLO ASSOCIATES | 4 | 11/14/2025 |
| AZIMUTH ENGINEERING | 2 | 07/23/2024 |
| KM CONSULTING ENGINEERS, INC. | 2 | 08/12/2021 |
| MICHAEL L. PINSKE | 2 | 11/05/2020 |
| SALIENT ARCHITECTS, LLC | 2 | 08/03/2022 |
| WILLIAM F. COLLINS ARCHITECTS | 2 | 08/22/2018 |
| A SAXON DESIGN GROUP | 1 | 03/25/2024 |
| COM-EX ENGINEERING OF NY, PLLC | 1 | 06/21/2021 |
| DEWBERRY ENGINEERS INC | 1 | 03/19/2021 |
| E2 PROJECT MANAGEMENT LLC | 1 | 11/05/2018 |
| Magaram Engineering Services | 1 | 10/30/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| COMCELL CONSTRUCTION CORP | 138 | 06/29/2026 |
| ODYSSIA GLOBAL COMM. CORP | 9 | 08/04/2025 |
| L.E.C.INC | 4 | 08/14/2023 |
| MULTI TELECOM CORPORATION | 4 | 10/05/2023 |
| LIVOTI ENTERPRISE LLC | 3 | 11/14/2025 |
| CEL TECH ELECTRIC INC | 2 | 02/21/2025 |
| N.W. MANAGEMENT INC | 2 | 10/07/2022 |
| TELCOM ENGINEERING GROUP | 2 | 03/30/2023 |
| TRISTRUX LLC | 2 | 10/30/2025 |
| AMP COMMUNICATIONS LLC | 1 | 11/14/2025 |
| COMMUNICATION COMPONENT S | 1 | 10/22/2019 |
| EJD WIRELESS INC | 1 | 07/23/2024 |
| FAST TRACK ELECTRIC CORP | 1 | 12/02/2021 |
| HIMALAYA TOWERS | 1 | 02/11/2026 |
| KMM TELECOMMUNICATIONS | 1 | 10/12/2021 |
| METRO RF SERVICES INC | 1 | 05/31/2022 |
| NORTH JERSEY ATMS LLC | 1 | 07/26/2023 |
| PREMIER CONSTRUCT SVC LLC | 1 | 08/22/2024 |
| RAMAPO COMMUNICATION CORP | 1 | 08/17/2022 |
| RC3 ELECTRIC, LLC | 1 | 04/21/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| STUYTOWN PROPERTY SERVICES | 3 | 11/30/2018 |
| ALMA REALTY CORP | 2 | 10/07/2022 |
| KATZ REALTY GROUP | 2 | 06/22/2023 |
| LANGSAM PROPERTY SERVICES | 2 | 12/20/2022 |
| Stryker Law LLC | 2 | 11/09/2022 |
| 1530 60TH MEMBER LLC | 1 | 06/02/2025 |
| 225 5TH AVENUE (NY), LLC | 1 | 08/17/2022 |
| 266 WASHINGTON AVENUE INVESTOR, LLC | 1 | 11/16/2022 |
| 2765 OCEAN AVENUE REALTY LLC | 1 | 07/17/2025 |
| 2857 WEST 8TH STREET DEVELOPERS LLC | 1 | 08/15/2023 |
| 41-70 REALTY LLC | 1 | 05/12/2025 |
| 4501 AVENUE N LLC | 1 | 05/31/2022 |
| 51-55 WEST 35TH STREET REALTY INC. | 1 | 06/29/2026 |
| 521 MAD | 1 | 03/25/2024 |
| 778 SENECA BH LLC | 1 | 03/02/2020 |
| ACEMANAGEMENT | 1 | 01/07/2025 |
| AM BUILDERS & DESIGNS INC | 1 | 11/12/2025 |
| ASC PROPERTIES | 1 | 10/30/2025 |
| ATLAS MANAGEMENT REALTY CORP | 1 | 07/25/2025 |
| AUSWIN REALTY | 1 | 10/12/2021 |
| BENENSON REAL ESTATE CORP | 1 | 07/11/2019 |
| BPP PCV OWNER LLC | 1 | 11/22/2023 |
| BRONSTEIN PROPERTIES LLC | 1 | 02/16/2023 |
| C/O TF CORNERSTONE INC. | 1 | 02/01/2023 |
| COMPASS PROPERTIES | 1 | 02/16/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| CONSTRUCTION PERMIT SERVICES | 56 | 06/29/2026 |
| CCM CONSULTING GROUP, INC. | 9 | 11/14/2025 |
| BROOKBRIDGE CONSULTING | 1 | 12/02/2021 |
| GC1 EXPEDITING LLC | 1 | 08/12/2021 |
| RIZZO GROUP | 1 | 07/23/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01224070 ↗ | 1176 OCEAN PARKWAY BROOKLYN | Alteration | Permit Issued | 08/01/2025 | 08/19/2026 | Design THE MTM DESIGN GROUP, LLC | Modification to existing VERIZON site on the roof. Install 6 antennas, 3 RRH units, 3 OVP's, 2 GPS antennas and 1 equipment platform w/ cabi… |
| Q00034367 ↗ | 136-05 SANFORD AVENUE QUEENS | Alteration | Permit Issued | 08/31/2020 | 07/29/2026 | Design APT ENGINEERING Owner MURRAY HILL MANAGEMENT | Modification to existing VERIZON site on the roof. Replacement of (12) antennas. Removal of (6) RRH units and (6) cabinets. Installation of … |
| B00081990 ↗ | 1114 NEW YORK AVENUE BROOKLYN | Alteration | Permit Issued | 03/15/2019 | 07/10/2026 | — | VERIZON - Replacement of existing antennas on the roof. All work in compliance with TPPN 5/98. No change to occupancy, use or egress. |
| B01214723 ↗ | 1673 49 STREET BROOKLYN | Alteration | Permit Issued | 08/14/2025 | 07/06/2026 | Design FRENCH & PARRELLO ASSOCIATES | Modification to existing Verizon site. REMOVE 1 CABINET, 1 ANTENNA, AND 2 RRH's, REPLACE 2 ANTENNAS AND 2 RRH's, AND INSTALL 6 ANTENNAS, 4 R… |
| Q00886820 ↗ | 9-02 38 AVENUE QUEENS | Alteration | Permit Issued | 09/20/2023 | 06/17/2026 | Design JAMES H. FAHEY | Modification to Verizon site. Remove 3 antennas, remove cabinet. Replace 6 antennas, 6 RRH units. Install 3 antennas, 2 microwave antennas, … |
| B01263632 ↗ | 149 HAMILTON AVENUE BROOKLYN | Alteration | Signed-off | 08/21/2025 | 04/22/2026 | Modification of existing T-Mobile site. Remove 3 RRH units and 3 equipment cabinets and install 2 new equipment cabinets on roof. No change … | |
| B01275432 ↗ | 153 HAMILTON AVENUE BROOKLYN | Alteration | Signed-off | 08/21/2025 | 04/22/2026 | Modification to existing T-Mobile site on roof. Remove 3 antennas, relocate 3 antennas, and install 3 RRH units. No change in use, egress, o… | |
| M01100396 ↗ | 55 WEST 35 STREET MANHATTAN | Alteration | Permit Issued | 10/08/2024 | 04/14/2026 | Design SCHERER DESIGN GROUP | Modification to existing Verizon site. Replace 6 antennas, remove 3 antennas, install 3 antennas, replace 9 RRH units, remove 6 RRH and 1 R… |
| Q01262366 ↗ | 156-06 ROCKAWAY BOULEVARD QUEENS | Alteration | Permit Issued | 11/14/2025 | 04/09/2026 | Design FRENCH & PARRELLO ASSOCIATES | T-Mobile : Removal & install cabinets on existing platform on roof. Replace & install antennas. Remove and install RRH on roof. All in compl… |
| B01221972 ↗ | 1514 60 STREET BROOKLYN | Alteration | Permit Issued | 06/02/2025 | 03/25/2026 | Design KMB DESIGN GROUP, LLC Owner 1530 60TH MEMBER LLC | Installation of new VERIZON site on the roof. Install 3 sectors (12 antennas) with associated parts, 6 RRH units, 3 GPS units and 1 equipmen… |
| M00772454 ↗ | 342 1 AVENUE MANHATTAN | Alteration | Permit Issued | 11/22/2023 | 03/16/2026 | Design JAMES H. FAHEY Owner BPP PCV OWNER LLC | Verizon Modification. Replace 6 RRH units, remove 1 cabinet with existing platform, install new platform with cabinets. Install 2 microwave … |
| X01304755 ↗ | 2198 CRUGER AVENUE BRONX | Alteration | Signed-off | 10/30/2025 | 02/26/2026 | Design Magaram Engineering Services | T-Mobile modification - Install 2 antennas, relocate 2 antennas and relocate 2 RRU on the roof. Install 2 cabinets on existing steel platfor… |
| B00682280 ↗ | 4501 AVENUE N BROOKLYN | Alteration | Signed-off | 05/31/2022 | 02/03/2026 | Owner 4501 AVENUE N LLC | Replacement of existing antennas, eq. cabinets and RRUs, install new antennas, remove existing RRUs on the rooftop (T-Mobile - BQ04272C) as … |
| X01249480 ↗ | 3120 WILKINSON AVENUE BRONX | Alteration | Signed-off | 10/30/2025 | 01/26/2026 | Owner ASC PROPERTIES | Modification to T-Mobile site. Install 3 antennas, Replace 9 antennas and 9 RRU units on roof. Remove 3 RRU units on roof. Replace 2 existin… |
| B01229449 ↗ | 7914 4 AVENUE BROOKLYN | Alteration | Signed-off | 07/17/2025 | 11/07/2025 | Design SCHERER DESIGN GROUP | Modification to existing VERIZON site. Install 3 antennas, 2 RRHs, and 1 OVP. Relocate 6 antennas, 4 RRHs, and 2 OVPs. Replace 3 antennas.… |
| Q00339958 ↗ | 118-02 101 AVENUE QUEENS | Alteration | Signed-off | 06/18/2020 | 10/22/2025 | Design THE MTM DESIGN GROUP, LLC | Modification to existing Verizon site. Replace 4 RRHs and 2 antennas, install 5 antennas and 2 RRHs, remove 1 equipment platform and install… |
| B01229508 ↗ | 225 FOSTER AVENUE BROOKLYN | Alteration | Signed-off | 08/21/2025 | 10/20/2025 | Design KMB DESIGN GROUP, LLC | Modification to existing VERIZON site. Relocate 2 antennas, replace 2 antennas, install 6 antennas and 4 RRHs and install 1 additional equi… |
| Q00110233 ↗ | 92-07 195 PLACE QUEENS | Alteration | Signed-off | 01/17/2020 | 10/09/2025 | Design THE MTM DESIGN GROUP, LLC | Modification to existing VERIZON telecommunications site. Relocate 2 antennas, replace 2 antennas, install 5 antennas, replace 4 RRHs, insta… |
| Q00890296 ↗ | 63-19 AUSTIN STREET QUEENS | Alteration | Signed-off | 07/19/2023 | 10/08/2025 | Design KMB DESIGN GROUP, LLC | Modification to existing VERIZON site on the roof. Install 2 antennas, 2 RRH units & 1 equipment platform with related cabinets. Replace 4 a… |
| M00772492 ↗ | 342 1 AVENUE MANHATTAN | Alteration | Permit Issued | 01/03/2024 | 09/23/2025 | Design JAMES H. FAHEY | Verizon Wireless Modification - Relocate 2 GPS antennas, Replace 6 RRH units, Installs New Equipment Cabinets on New Steel Platform, install… |
| Q00986272 ↗ | 183-02 UNION TURNPIKE QUEENS | Alteration | Signed-off | 09/11/2024 | 09/02/2025 | T-Mobile: Installation and replacement of antennas with replacement and relocation of RRUs on the roof. All work is in compliance with TPPN … | |
| B00793128 ↗ | 7824 13 AVENUE BROOKLYN | Alteration | Permit Issued | 09/30/2022 | 08/14/2025 | Design APT ENGINEERING | Modification to existing VERIZON site. Replace 3 antennas & 6 RRHs, install 3 antennas & 3 MDBs. Install a new equipment platform with cabin… |
| 421021566BIS | 26-45 9 STREET QUEENS | — | ISSUED | 01/21/2015 | 07/24/2025 | — | MH, PL |
| Q00779207 ↗ | 73-19 WOODSIDE AVENUE QUEENS | Alteration | Signed-off | 08/16/2022 | 06/10/2025 | Design KMB DESIGN GROUP, LLC Owner 41-70 REALTY LLC | VERIZON Modification - replace 6 antennas, replace 6 RRHs, remove 2 GPS antennas, remove 1 cabinet, new steel platform with dunnage. |
| M00789051 ↗ | 240 1 AVENUE MANHATTAN | Alteration | Signed-off | 11/06/2023 | 06/09/2025 | Design JAMES H. FAHEY | Modification to Verizon site. Install 1 new platform with dunnage. Remove existing platform and 1 cabinet. Replace 6 antennas. Replace 8 RRH… |
| B01083643 ↗ | 2264 ATLANTIC AVENUE BROOKLYN | Alteration | Permit Issued | 08/22/2024 | 04/21/2025 | Design KMB DESIGN GROUP, LLC | Installation of new VERIZON site on the roof. Install 3 sectors (12 antennas), 6 RRH units, 4 GPS units, and a new equipment platform with 3… |
| M00071122 ↗ | 120 UNIVERSITY PLACE MANHATTAN | Alteration | Signed-off | 09/27/2018 | 03/31/2025 | Design TECTONIC ENGINEERING | Modification to existing Verizon telecommunications site. Replace 4 antennas on roof. All in conformance with TPPN 5/98. No change in use, e… |
| 321148897BIS | 1888 WEST 9 STREET BROOKLYN | — | ISSUED | 11/25/2015 | 03/18/2025 | — | MH, PL |
| B00654219 ↗ | 500 ST MARKS AVENUE BROOKLYN | Alteration | Permit Issued | 10/07/2022 | 03/05/2025 | Design APT ENGINEERING Owner ALMA REALTY CORP | MODIFICATION TO VERIZON SITE. REPLACE 2 ANTENNAS, REPLACE 1 RRH UNIT, INSTALL 1 ANTENNA AND 1 RRH UNIT, REMOVE EQUIPMENT CABINET, INSTALL NE… |
| B00659209 ↗ | 565 PROSPECT PLACE BROOKLYN | Alteration | Permit Issued | 10/07/2022 | 03/05/2025 | Design APT ENGINEERING | Modification to Verizon site. Replace 2 antennas with 1 RRH unit, install 1 antenna and 1 RRH unit. |
| Q00826211 ↗ | 87-24 115 STREET QUEENS | Alteration | Signed-off | 02/16/2023 | 02/28/2025 | Design TECTONIC ENGINEERING Owner BRONSTEIN PROPERTIES LLC | Verizon - Replacement of antennas & RRH units, relocation of GPS units on the roof. Removal of cabinet & installation of new cabinets on ste… |
| B01155280 ↗ | 1411 WEST 4 STREET BROOKLYN | Alteration | Signed-off | 01/07/2025 | 02/18/2025 | Design ELEVATED ENGINEERING, PLLC Owner ACEMANAGEMENT | T-Mobile: Relocation of antenna sectors and installation of kickbacks on the roof. All work is in compliance with TPPN 5/98. No change in us… |
| B00818239 ↗ | 597 OCEAN PARKWAY BROOKLYN | Alteration | Signed-off | 03/06/2023 | 02/04/2025 | Design KMB DESIGN GROUP, LLC Owner EFTRI HOLDINGS LLC | Modification of existing Verizon site. Install 2 new antenna, replace 6 RRH units, remove 1 equipment cabinet, and install 1 new steel platf… |
| M00730023 ↗ | 340A LENOX AVENUE MANHATTAN | Alteration | Signed-off | 03/30/2023 | 01/13/2025 | Design TECTONIC ENGINEERING | Verizon - Replacement/relocation/installation of antennas, GPS, RRH units, kickbacks on the roof. Removal/replacement of cabinets on the ex… |
| M08012569 ↗ | 340A LENOX AVENUE MANHATTAN | Alteration | Signed-off | 03/30/2023 | 01/13/2025 | Design TECTONIC ENGINEERING | Verizon - Proposed existing parapet repair. No change to occupancy, use or egress. |
| X00906124 ↗ | 30 PILOT STREET BRONX | Alteration | Permit Issued | 06/06/2024 | 12/23/2024 | Design SCHERER DESIGN GROUP | Install of new Dish Wireless site. Install 3 sectors (3 antennas) w/ associated parts, 6 RRH's, 3 OVP's, 1 GPS antenna, and 1 equipment plat… |
| X01020898 ↗ | 3800 CARPENTER AVENUE BRONX | Alteration | Signed-off | 06/20/2024 | 07/26/2024 | Design ELEVATED ENGINEERING, PLLC Owner GAZIVODA REALTY LLC | T-Mobile: Decommission of existing telecommunication site on roof. Removal of antenna sectors, GPS, and equipment platform with related equi… |
| B00116356 ↗ | 575 HERKIMER STREET BROOKLYN | Alteration | Signed-off | 07/20/2020 | 03/14/2024 | Design KMB DESIGN GROUP, LLC Owner LILMOR MGMT | Modification to an existing VERIZON telecommunications site. Remove (1) cabinet and install new platform with cabinets. Install (1) new sec… |
| Q00272089 ↗ | 46-06 SMART STREET QUEENS | Alteration | Signed-off | 08/14/2020 | 03/13/2024 | Design APT ENGINEERING Owner COMPASS PROPERTIES | Modification to existing VERIZON telecommunications site on the roof. Replacement of 9 antennas, 6 RRH units, 1 equipment cabinet, relocatio… |
| B00474330 ↗ | 609 METROPOLITAN AVENUE BROOKLYN | Alteration | Permit Issued | 08/26/2021 | 03/05/2024 | Design KMB DESIGN GROUP, LLC | Mod. of existing VERIZON site. Replace 4 antennas and 6 RRH units on the roof and expansion of equipment platform. Install 2 microwave dishe… |
| M00660202 ↗ | 668 WATER STREET MANHATTAN | Alteration | Signed-off | 09/08/2022 | 03/01/2024 | Design AZIMUTH ENGINEERING Owner NYC Housing Authority Filer RIZZO GROUP | Installation of new antennas, RRUs, equipment cabinets, battery cabinets and equipment platform on the rooftop (T-Mobile - NY05998A) as per … |
| S00959537 ↗ | 88 GUYON AVENUE STATEN ISLAND | Alteration | Signed-off | 12/19/2023 | 02/29/2024 | Dish - Installation of new antennas and canister on the monopole. Installation of RRH units, GPS antenna and cabinet on grade. Removal of ex… | |
| S00505937 ↗ | 2222 RICHMOND AVENUE STATEN ISLAND | Alteration | Signed-off | 11/04/2021 | 02/09/2024 | Design KMB DESIGN GROUP, LLC Owner LAR ASSOCIATES LLC | Modification to existing Verizon site on the roof. Removal of (1) equipment cabinet. Replacement of (6) Antennas and (3) OVPs. Installation … |
| Q00184393 ↗ | 71-50 AUSTIN STREET QUEENS | Alteration | Signed-off | 09/04/2019 | 11/28/2023 | Design KMB DESIGN GROUP, LLC Owner AUSWIN REALTY | Modification to existing Verizon telecommunications site. Replace 8 antennas and 10 RRH units on roof. Install 5 new antennas on roof. All i… |
| Q00118346 ↗ | 87-85 123 STREET QUEENS | Alteration | Signed-off | 11/06/2019 | 10/30/2023 | Design JAMES H. FAHEY Owner ALMA REALTY CORP | Modification to existing VERIZON telecommunications site. Replace 2 antennas & 4 RRH units, installation of 5 additional RRH units, 1 new a… |
| B00912090 ↗ | 2847 WEST 8 STREET BROOKLYN | Alteration | Signed-off | 08/15/2023 | 10/23/2023 | Design JAMES H. FAHEY | DECOMMISSION OF EXISTING VZW SITE. REMOVE EQUIPMENT PLATFORM AND DUNNAGE, MONOPOLE WITH 12 ANTENNAS 6 RRH GENERATOR AND 4 GPS FROM ROOF. RE… |
| Q00553418 ↗ | 40-29 21 STREET QUEENS | Alteration | Signed-off | 11/02/2021 | 09/18/2023 | Design JAMES H. FAHEY Owner ELMS REALTY INC | Mod. of existing VERIZON site. Replace 9 antennas & 9 RRHs, relocate 1 antenna, and remove 1 antenna on the roof. Install 2 microwave dishes |
| M00895377 ↗ | 9 EAST 53 STREET MANHATTAN | Alteration | Signed-off | 08/14/2023 | 09/14/2023 | Design A SAXON DESIGN GROUP Owner 521 MAD | T-Mobile: Relocation of existing antenna sectors, GPS antenna and equipment cabinets with installation of kickbacks & cabinets and removal o… |
| B00739003 ↗ | 125 OCEAN PARKWAY BROOKLYN | Alteration | Signed-off | 06/27/2022 | 08/30/2023 | Design KMB DESIGN GROUP, LLC Owner KATZ REALTY GROUP | MODIFICATION TO VERIZON SITE. REPLACE 6 ANTENNAS AND 6 RRH UNITS, RELOCATE 1 CABINET, INSTALL NEW PLATFORM WITH DUNNAGE. INSTALL 2 MICROWAV… |
| Q00498281 ↗ | 59-06 LINDEN STREET QUEENS | Alteration | Signed-off | 05/01/2021 | 08/18/2023 | Design SCHERER DESIGN GROUP | Verizon - Replacement of existing antennas and RRH units on the roof. Installation of new cabinets on the existing platform on the roof. Ins… |
| Q00219128 ↗ | 132-26 SOUTH CONDUIT AVENUE QUEENS | Alteration | Signed-off | 09/03/2019 | 08/17/2023 | Design KMB DESIGN GROUP, LLC | Modification to VERIZON site. Remove 2 antennas, replace 9 antennas, install 2 antennas, replace 6 RRHs, install 2 RRHs, & replace 2 equipm… |
| B08020377 ↗ | 925 EAST 14 STREET BROOKLYN | Alteration | Signed-off | 01/25/2023 | 08/08/2023 | Design KMB DESIGN GROUP, LLC Owner HART ST APARTMENTS LLC | T-Mobile - Removal/installation of antenna sectors, antennas & kickbacks on the roof. Removal/installation of cabinets on the existing equip… |
| M00750247 ↗ | 225 5 AVENUE MANHATTAN | Alteration | Signed-off | 08/17/2022 | 08/02/2023 | Design JAMES H. FAHEY Owner 225 5TH AVENUE (NY), LLC | VERIZON SITE MODIFICATIONS TO INCLUDE THE REPLACEMENT OF (9) EXISTING ANTENNAS, INSTALLATION OF (9) NEW RRH UNITS AND (1) NEW WALL-MOUNTED C… |
| B00621653 ↗ | 206 SCHOLES STREET BROOKLYN | Alteration | Signed-off | 01/27/2022 | 07/14/2023 | Design KMB DESIGN GROUP, LLC Owner WATERMARK | T-Mobile: Removal, relocation and installation of antennas and RRUs with installation of kickbacks on the roof. Installation/removal of cabi… |
| Q00770227 ↗ | 213-14 UNION TURNPIKE QUEENS | Alteration | Signed-off | 07/22/2022 | 07/13/2023 | Design KMB DESIGN GROUP, LLC | Modification to existing Verizon site. Install 2 microwave dishes on the roof. |
| M00851258 ↗ | 920 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 06/01/2023 | 06/14/2023 | Design KMB DESIGN GROUP, LLC | DISH WIRELESS- Installation of 3 new antenna sectors with 6 RRH units and 1 GPS unit on roof.. Install 1 new equipment cabinet on steel plat… |
| B00337806 ↗ | 960 EAST 12 STREET BROOKLYN | Alteration | Signed-off | 07/08/2020 | 06/08/2023 | Design KMB DESIGN GROUP, LLC | Modification of existing Verizon site. Install 5 new antennas and 2 new RRH units, replace 4 RRH units, relocate 2 GPS antennas and 2 satell… |
| M00864941 ↗ | 287 EAST HOUSTON STREET MANHATTAN | Alteration | Signed-off | 04/27/2023 | 05/16/2023 | Design KMB DESIGN GROUP, LLC | DISH WIRELESS- Installation of 3 new antenna sectors with 6 RRH unit and 1 GPS unit on roof.. Install 1 new equipment cabinet in cellar Rel… |
| Q00783068 ↗ | 226-26 UNION TURNPIKE QUEENS | Alteration | Permit Issued | 10/31/2022 | 03/29/2023 | Design KMB DESIGN GROUP, LLC | REPLACEMENT OF EXISTING 35KW NATURAL GAS GENERATOR WITH NEW 50KW NATURAL GAS GENERATOR ON ROOF WITH RELATED GAS PIPING MODIFICATIONS FILED U… |
| M00815464 ↗ | 201 EAST 69 STREET MANHATTAN | Alteration | Signed-off | 02/01/2023 | 03/07/2023 | Design ELEVATED ENGINEERING, PLLC Owner C/O TF CORNERSTONE INC. | Mod. to existing Sprint/T-Mobile site. Remove 12 antenna, 6 RRH unit, & 1 GPS unit & install 9 antennas & 6 RRH units on existing water tank… |
| M08032963 ↗ | 34 ELDRIDGE STREET MANHATTAN | Alteration | Signed-off | 11/09/2022 | 02/24/2023 | Design KMB DESIGN GROUP, LLC Owner Stryker Law LLC | Installation of DISH telecom site Install 2 new antennas sectors, 4 RRH units and 1 GPS antenna on roof.. Install 1 wall mounted cabinet on … |
| B00753989 ↗ | 266 WASHINGTON AVENUE BROOKLYN | Alteration | Permit Issued | 11/16/2022 | 12/21/2022 | Design KMB DESIGN GROUP, LLC | Modification to existing VERIZON site. Install 4 antennas and 4 RRHs, replace 12 RRHs, and install 1 new cabinet on existing platform on th… |
| M08032998 ↗ | 34 ELDRIDGE STREET MANHATTAN | Alteration | Signed-off | 11/09/2022 | 11/29/2022 | Design KMB DESIGN GROUP, LLC Owner Stryker Law LLC | Installation of DISH telecom site Install 1 new antennas sectors, 2 RRH units on roof.. All in conformance with TPPN 5/98. |
| Q00717093 ↗ | 72-34 45 AVENUE QUEENS | Alteration | Signed-off | 11/03/2022 | 11/18/2022 | Design FRENCH & PARRELLO ASSOCIATES | MODIFICATIONS TO EXISTING VERIZON SITE. NEW STEEL PLATFORM WITH (3) EQUIPMENT CABINETS. REPLACE (4) ANTENNAS AND (4) RRH UNITS. REMOVE (1) E… |
| B08011931 ↗ | 135 11 STREET BROOKLYN | Alteration | Permit Issued | 10/11/2022 | 11/02/2022 | Design AZIMUTH ENGINEERING | Installation of new antennas, replacement of existing antennas & RRUs on the rooftop (T-Mobile - BK09036A) as per plans. All work is in comp… |
| Q00572594 ↗ | 210-05 CORP KENNEDY STREET QUEENS | Alteration | Signed-off | 08/03/2022 | 10/26/2022 | Design SALIENT ARCHITECTS, LLC | New Dish antenna site. Install 3 new sectors of antennas, 6 RRH units, 1 GPS antenna, and 1 wall mounted cabinet. Conduits from basement to … |
| Q00660739 ↗ | 109-09 180 STREET QUEENS | Alteration | Signed-off | 03/29/2022 | 10/08/2022 | Design TECTONIC ENGINEERING | NEW DISH WIRELESS TELECOM SITE TO INCLUDE NEW STEEL PLATFORM WITH CABINET INSTALLS, ADDITION OF (3) ANTENNAS AND (6) RRH UNITS. CONDUIT ROUT… |
| Q00774720 ↗ | 19-73 38 STREET QUEENS | Alteration | Signed-off | 08/18/2022 | 09/19/2022 | Design KMB DESIGN GROUP, LLC | New DISH site. Installing 3 Antenna sectors with 6 RRH units and 1 GPS unit on the roof. Installing Equipment Cabinet on new steel platform.… |
| B00440716 ↗ | 109 SOUTH 5 STREET BROOKLYN | Alteration | Signed-off | 04/01/2021 | 09/02/2022 | T-Mobile. Modification to existing telecom site. Relocate existing antenna gamma sector from parapet to penthouse. All work in conformance… | |
| Q00571229 ↗ | 106-01 METROPOLITAN AVENUE QUEENS | Alteration | Signed-off | 04/15/2022 | 08/04/2022 | Design THE MTM DESIGN GROUP, LLC | Modification to existing Verizon site. Replace 4 RRH units, install 3 OVP, relocate 2 antennas, install 3 antennas, relocate 2 GPS units, re… |
| Q00627006 ↗ | 61-17 WOODSIDE AVENUE QUEENS | Alteration | Signed-off | 03/28/2022 | 07/26/2022 | Design SALIENT ARCHITECTS, LLC | NEW DISH ANTENNA SITE. INSTALL 3 SECTORS OF ANTENNAS,6 RRH UNITS, 1 GPS ANTENNAS AND WALL MOUNTED CABINET. CONDUITS IN BASEMENT. |
| Q00548666 ↗ | 42-21 VERNON BOULEVARD QUEENS | Alteration | Signed-off | 11/04/2021 | 06/28/2022 | Design JAMES H. FAHEY | Dish Network - Installation of new platform with cabinet on roof. Installation of new antenna sectors with RRH units and GPS on roof. Rela… |
| Q00674952 ↗ | 41-11 40 STREET QUEENS | Alteration | Signed-off | 03/07/2022 | 05/02/2022 | Design JAMES H. FAHEY | Modification to existing Verizon site. Replace 3 antennas and 6 RRH units, remove 2 antennas and 3 RRH units, install 1 new antenna, and ins… |
| M00539007 ↗ | 880 WEST 181 STREET MANHATTAN | Alteration | Permit Issued | 12/02/2021 | 03/21/2022 | Design ELEVATED ENGINEERING, PLLC Filer BROOKBRIDGE CONSULTING | Replacement of antennas and RRUs, relocation and removal of RRUs, install new equipment cabinets, GPS antenna on the rooftop (T-Mobile - NY0… |
| Q00216109 ↗ | 141-01 123 AVENUE QUEENS | Alteration | Permit Issued | 10/22/2019 | 02/26/2022 | Design SCHERER DESIGN GROUP | MODIFICATIONS TO EXISTING VERIZON WIRELESS SITE. REPLACING (6) ANTENNAS AND (6) RRH UNITS ON THE ROOF. ALL IN CONFORMANCE WITH TPPN5/98. NO … |
| B00482087 ↗ | 552 VAN BUREN STREET BROOKLYN | Alteration | Permit Issued | 08/12/2021 | 01/17/2022 | Design KMB DESIGN GROUP, LLC | Mod of Verizon site. Replace 1 antennas & 4 RRHs, install 2 antennas, relocate 2 GPS units, remove 1 existing cabinet, and install new cabin… |
| B00191836 ↗ | 361 STAGG STREET BROOKLYN | Alteration | Signed-off | 07/28/2020 | 10/29/2021 | Design KMB DESIGN GROUP, LLC | Verizon - Replacement of existing antennas & RRH units, removal of existing antennas & antenna sector and installation of new antenna sector… |
| X00569612 ↗ | 1400 JESUP AVENUE BRONX | Alteration | Signed-off | 08/12/2021 | 08/24/2021 | Filer GC1 EXPEDITING LLC | Modification to an existing antenna site. Carrier: T-Mobile. Install equipment platform to the parapet wall. Relocate (4) existing cabinets … |
| B00464934 ↗ | 96 SCHERMERHORN STREET BROOKLYN | Alteration | Signed-off | 02/11/2021 | 05/18/2021 | Design ELEVATED ENGINEERING, PLLC | Mod of existing T-Mobile site. Remove 5 antennas & 3 RRHs, install 4 antennas & 2 RRHs, replace 5 antennas & 6 RRHs, relocate 1 RRH & replac… |
| Q00346007 ↗ | 63-35 FRESH POND ROAD QUEENS | Alteration | Signed-off | 07/20/2020 | 01/12/2021 | Design TECTONIC ENGINEERING | Verizon-Installation of new antennas and kickbacks with replacement of existing antennas on the roof. Replacement of equipment cabinet on th… |
| S00404738 ↗ | 631 HOWARD AVENUE STATEN ISLAND | Alteration | Signed-off | 11/24/2020 | 12/21/2020 | Design ELEVATED ENGINEERING, PLLC Owner WAGNER COLLEGE | Install NEW DEP antenna site. Install (2) antennas on bulkhead. Install (1) DCU cabinet on roof at bulkhead and (1) related solar panel on b… |
| B00203672 ↗ | 634 CARLTON AVENUE BROOKLYN | Alteration | Permit Issued | 03/24/2020 | 12/15/2020 | Design THE MTM DESIGN GROUP, LLC | Modification to existing Verizon site. Remove 3 antennas, replace 1 antenna, install 4 antennas, 3 RRH units, and 1 equipment cabinet on roo… |
| X00212317 ↗ | 400 EAST 199 STREET BRONX | Alteration | Permit Issued | 10/18/2019 | 12/08/2020 | Design APT ENGINEERING | Modification to existing Verizon telecommunications site. Replace 9 antennas and replace 6 RRH units and relocate 2 sectors on roof. All in … |
| Q00014429 ↗ | 111-88 43 AVENUE QUEENS | Alteration | Signed-off | 01/23/2019 | 11/16/2020 | Design JAMES H. FAHEY | VERIZON WIRELESS - Installation of new telecommunication antenna sectors with related antenna components and installation of GPS units on th… |
| B00357350 ↗ | 1101 ELDERT LANE BROOKLYN | Alteration | Signed-off | 09/08/2020 | 10/29/2020 | Design THE MTM DESIGN GROUP, LLC | Mod. of existing VERIZON site. Relocate 2 sectors (4 antennas), install 1 sector (3 antennas), install 2 antenna, install 6 RRH units, and r… |
| 322083883BIS | 634 CARLTON AVENUE BROOKLYN | — | ISSUED | 09/16/2020 | 09/16/2020 | — | OT |
| S00344189 ↗ | 150 BAY STREET STATEN ISLAND | Alteration | Permit Issued | 09/03/2020 | 09/14/2020 | Design SCHERER DESIGN GROUP | Modification to existing Verizon site. Replace 4 antennas, 4 RRH units, and 1 equipment cabinet and install 2 new antennas on roof. All in c… |
| Q00343592 ↗ | 234-20 LINDEN BOULEVARD QUEENS | Alteration | Signed-off | 06/19/2020 | 07/14/2020 | Design THE MTM DESIGN GROUP, LLC | Modification to existing Verizon site. Replace 2 antennas, 6 RRH units, and 1 equipment cabinet on roof. Remove 2 antennas and install 4 new… |
| Q00276911 ↗ | 11-25 WYCKOFF AVENUE QUEENS | Alteration | Permit Issued | 07/02/2020 | 07/08/2020 | Design THE MTM DESIGN GROUP, LLC | Modification of existing VERIZON site. Replace 2 antennas, remove 2 antennas, install 7 antennas, replace 4 RRHs, install 2 RRHs, install 3… |
| 220725776BIS | 2839 BAINBRIDGE AVENUE BRONX | — | ISSUED | 06/16/2020 | 06/16/2020 | — | OT |
| B00308462 ↗ | 461 6 STREET BROOKLYN | Alteration | Signed-off | 02/19/2020 | 06/10/2020 | Design SCHERER DESIGN GROUP | Verizon - Replacement of existing RRH units with replacement and installation of antennas on the roof. All work in compliance with TPPN 5/98… |
| X00306204 ↗ | 1950 HUTCHINSON RVR PY E BRONX | Alteration | Permit Issued | 05/13/2020 | 05/28/2020 | Design APT ENGINEERING | Mod. to VERIZON site. Relocate 1 sector, install 1 sector (2 antennas) & 2 RRH, replace 3 antennas & 3 RRHs, and remove 2 antenna, replace 2… |
| Q00176030 ↗ | 66-92 FOREST AVENUE QUEENS | Alteration | Signed-off | 03/02/2020 | 05/01/2020 | Design JAMES H. FAHEY Owner 778 SENECA BH LLC | Modification to existing Verizon telecommunications site. Replace 4 antennas, 6 RRH units, and 1 equipment cabinet on roof. Install 5 new an… |
| X00169663 ↗ | 2839 BAINBRIDGE AVENUE BRONX | Alteration | Permit Issued | 07/11/2019 | 04/08/2020 | Design APT ENGINEERING | Modification to existing Verizon telecommunications site. Replace 8 antennas, 6 RRH units, and 1 equipment cabinet and install 1 new antenna… |
| Q00036670 ↗ | 98-33 METROPOLITAN AVENUE QUEENS | Alteration | Signed-off | 07/05/2018 | 03/12/2020 | Design DEWBERRY ENGINEERS INC Owner JOHN ASSOCIATES LLC | INSTALLATION OF NEW TELECOMMUNICATION SITE. INSTALL EQUIPMENT PLATFORM AND ANTENNAS WITH RELATED RRU UNITS ON ROOF. ALL INCONFORMANCE WITH T… |
| B00257136 ↗ | 2265 EAST 69 STREET BROOKLYN | Alteration | Permit Issued | 01/31/2020 | 03/03/2020 | Design KMB DESIGN GROUP, LLC | Mod. of existing VERIZON site. Replace 1 existing cabinet, replace 4 existing antennas and 4 RRH. Add 1 new sector (3 antennas), add 2 addit… |
| Q00118355 ↗ | 38-25 PARSONS BOULEVARD QUEENS | Alteration | Permit Issued | 12/10/2019 | 02/25/2020 | Design JAMES H. FAHEY | Modification to existing VERIZON telecommunications site. Remove 1 existing sector, install 2 new antenna sector (6 antennas) and install 1… |
| 421721649BIS | 98-33 METROPOLITAN AVENUE QUEENS | — | ISSUED | 03/13/2019 | 02/20/2020 | — | OT |
| X00170083 ↗ | 205 CITY ISLAND AVENUE BRONX | Alteration | Signed-off | 08/02/2019 | 01/30/2020 | Design APT ENGINEERING Owner KATONAH PROPERTY MGMT | Modification to existing Verizon telecommunications site. Replace 3 RRH units and install 1 new antenna on existing mounts on roof. All in c… |
| Q00115409 ↗ | 86-10 109 STREET QUEENS | Alteration | Signed-off | 08/12/2019 | 01/24/2020 | Design KMB DESIGN GROUP, LLC | Modification to existing VERIZON telecommunications site. Remove 1 existing antenna sector. Install 2 new antenna sectors (6 antennas (3 per… |