Office with commercial, 1-6 stories
1 CROSBY STREET
MANHATTAN · BIN 1003053
💬 Discuss this project
1872Year Built
5Stories
O5Building Class
M1-5/R7XZoning
10,999 sfGross Floor Area
5Units
0 Active Violations 3 likely answered ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: Land Finance · 2,175 sf lot · 5.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofLanserring8p · 3 filings · 20 docs
Floor 5Minor plumbing work related to renovation7p · 1 filing · 20 docs
Floor 4
Floor 3Lanserring19p · 3 filings · 20 docs
Floor 2
Floor 1Maison Margiela1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Harry Spitzer3507/08/2026
Landfinance1609/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/30/2021$21.8M—Harry Spitzer → LAND FINANCE CORPORATION$1,977/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Christina Magrans106/02/2026
Shahrish Shuvo Engineering407/25/2025
HRM Engineering Services106/28/2021
Cuono Engineering106/09/2021
Rojas AP305/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dominion Expediting403/21/2026
Rojas AP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DLG Interiors RenovationsGeneral Contractor1007/08/2026
Buch ConstructionGeneral Contractor603/21/2026
DJCPlumbing107/08/2026
Par Plumbing CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Shuvo Engineering8524207/25/2025
Benazzi Engineering5603106/28/2021
Autographic Co1579106/09/2021
Rojas AP5772305/13/2021
Building Lifecycle
All (104)Filed (10)Permit Issued (8)Signed Off (6)Violation (60)Inspection (1)Objection (1)Special Inspection (18)
07/06/2026
Objection raised — Scope
06/02/2026
Filed — Alteration
THE PROPOSED WORK CONSISTS OF PROVIDING A NEW 5'-0" X 7'-0" OPENING IN THE EXISTING PARTY WALL BETWEEN THE TWO BUILDINGS AT 1 CROSBY STREET AND 5 CROSBY STREET ON THE GROUND FLOOR. A PORTION OF THE EXIST. MASONRY WALL SHALL BE REMOVED / SHORED AS REQUIRE
M01408437-I1
06/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/28/2026
Special inspection requirement — Final
12/04/2025
Violation issued (FDNY_NOV, closed)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/08/2025
Signed off — Alteration
Minor plumbing work related to renovation.
M01215732-S1
08/08/2025
Signed off — Alteration
Minor plumbing work related to renovation.
M01215732-I1
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
08/07/2025
Special inspection requirement — Final
Shahrish Shuvo
08/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
08/07/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
08/07/2025
Special inspection requirement — Lighting controls
Shahrish Shuvo
08/05/2025
Violation issued (FDNY_NOV, closed)
07/25/2025
Filed — Alteration
Minor plumbing work related to renovation.
M01215732-P2
07/25/2025
Filed — Alteration
Minor plumbing work related to renovation.
M01215732-P1
07/23/2025
Special inspection requirement — Final
Shahrish Shuvo
07/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/23/2025
Special inspection requirement — Lighting controls
Shahrish Shuvo
07/23/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
07/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
07/15/2025
Permit issued — General Construction
M01215732-I1-GC
06/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/21/2025
Permit issued — Plumbing
M01215732-S1-PL
05/13/2025
Permit issued — General Construction
M01215732-I1-GC
05/09/2025
Filed — Alteration
Minor plumbing work related to renovation.
M01215732-S1
05/08/2025
Filed — Alteration
Minor plumbing work related to renovation.
M01215732-I1
08/06/2024
Violation issued (FDNY_NOV, closed)
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/09/2022
Signed off — Alteration
M00495268-I1
06/03/2022
Signed off — Alteration
M00502901-I1
05/16/2022
Signed off — Alteration
INSTALLATION OF NON-LOAD BEARING MINOR PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00451827-I1
02/04/2022
Signed off — Alteration
CAP EXISTING GAS PIPE. REPLACE (1) EXISTING TOILET AND (1) EXISTING LAVATORY. INSTALL (1) NEW KITCHEN SINK AND (1) NEW DISHWASHER.
M00455780-I1
12/14/2021
Permit issued — Mechanical Systems
M00495268-I1-MS
11/05/2021
Permit issued — Structural
M00502901-I1-ST
07/16/2021
Permit issued — General Construction
M00451827-I1-GC
06/28/2021
Filed — Alteration
M00495268-I1
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBuch Construction07/15/2025
DOB NOWPlumbingSigned-offPar Plumbing Co05/21/2025
DOB NOWGeneral ConstructionSigned-offBuch Construction05/13/2025
DOB NOWMechanical SystemsSigned-offDLG Interiors Renovations12/14/2021
DOB NOWStructuralSigned-offDLG Interiors Renovations11/05/2021
DOB NOWGeneral ConstructionSigned-offDLG Interiors Renovations07/16/2021
DOB NOWPlumbingSigned-offDJC04/28/2021
DOB NOWGeneral ConstructionSigned-offDLG Interiors Renovations03/05/2021
BISOTISSUEDWai Kee Construction11/05/2009
BISPLISSUEDCalray Gas Heating05/21/2007
BISMHISSUEDCalray Gas Heat05/21/2007
BISSPISSUEDBuckmiller Automatic Sprinkler01/05/2006
BISBLISSUEDCalray Gas Heat01/04/2006
BISOTISSUEDRedwood Construction Group10/31/2003
BISPLISSUEDCalray Gas Heat02/21/2001
BISBLISSUEDCalray Gas Heat02/21/2001
BISEQISSUEDAce Scaffold10/23/1996
BISPLISSUEDSeickel and Sons Plumbing12/16/1992
1 project · most recent 07/25/2025
Water/Sanitary
FiledStatusContractorScope
07/25/2025Signed-offPar Plumbing CoWater/Sanitary
4 projects · most recent 03/16/2026
General Wiring
FiledStatusContractorScope
03/16/2026Permit IssuedDenali Electric—
05/16/2025CompleteBigman Brothers—
03/10/2024CompleteCoachmen SolutionsGeneral Wiring
04/16/2022CompleteIndy ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/02/2026Fire-Resistance Rated Construction—progress
06/02/2026Fire-Resistant Penetrations and Joints—special
05/29/2026Structural Stability – Alterations of existing buildings—special
05/28/2026Final—progress
08/07/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
08/07/2025FinalShahrish Shuvoprogress
08/07/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
08/07/2025Interior lighting powerShahrish Shuvoenergy_progress
08/07/2025Lighting controlsShahrish Shuvoenergy_progress
07/23/2025FinalShahrish Shuvoprogress
07/23/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/23/2025Lighting controlsShahrish Shuvoenergy_progress
07/23/2025Interior lighting powerShahrish Shuvoenergy_progress
07/23/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
05/13/2021Interior lighting powerDeborah Rojas De Leonenergy_progress
04/20/2021Fire-Resistant Penetrations and JointsDeborah Rojas De Leonspecial
04/20/2021FinalDeborah Rojas De Leonprogress
01/18/2021Fire-Resistant Penetrations and JointsDeborah Rojas De Leonspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Maison MargielaRetailFloor 1
Project M01408437 Alteration · Plan Examiner Review · 06/02/2026
LanserringOfficeFloor 3
Project M00455780 Alteration · LOC Issued · 03/12/2021
Project M00451827 Alteration · LOC Issued · 02/11/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch7
09/03/2026M00502901-I1Request digital key ↗
09/03/2026M00495268-I1Request digital key ↗
08/23/2026M01215732-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00451827-P1Request digital key ↗
09/04/2026M00451827-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00455780-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION9
01/06/2026100519592Open ↗
09/03/2025102954233Open ↗
07/28/2025120140999Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLPC Approval/Permit9
09/04/2026M00451827-I1Open ↗
09/04/2026M00455780-I1Open ↗
08/13/2026M00502901-I1Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/26/2025102954233Open ↗
▸BISWORK PERMIT APPLICATION1
11/05/2009120140999Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/04/2026M00451827-I1Open ↗
09/04/2026M00455780-I1Open ↗
09/03/2026M00502901-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M00451827-P1Open ↗
09/01/2026M00451827-P1Open ↗
08/25/2026M01215732-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00451827-P1Open ↗
08/28/2026M00455780-I1Open ↗
08/25/2026M01215732-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/26/2009120140999Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
03/10/2010120276432Open ↗
08/26/2009120140999Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/04/2026M00451827-I1Open ↗
09/04/2026M00455780-I1Open ↗
08/23/2026M01215732-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
03/10/2010120276432Open ↗
08/26/2009120140999Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/03/2026M00502901-I1Open ↗
09/03/2026M00495268-I1Open ↗
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
03/10/2010120276432Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00451827-I1Open ↗
08/13/2026M00495268-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/16/2025120140999Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS2
03/10/2010120276432Open ↗
08/26/2009120140999Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/07/2026100519592Open ↗
09/16/2025120140999Open ↗
▸BISFINAL1
09/16/2025120140999Open ↗
▸BISLANDMARKS SIGNOFF1
09/16/2025120140999Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
09/03/2025102954233Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
03/10/2010120276432Open ↗
08/26/2009120140999Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/16/2025120140999Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
03/10/2010120276432Open ↗
08/26/2009120140999Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/29/2009120140999Open ↗