| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01444607 ↗ | 85 10 AVENUE MANHATTAN | Alteration | Permit Issued | 08/21/2026 | 08/21/2026 | Design ROBERT DERECTOR ASSOCIATES Owner RELATED COMPANIES Contractor SOUND REFRIGERATION & AIR Filer BAZINI ENGINEERING, P.C. | INSTALL FAN COIL UNIT AND DUCTWORK TO SERVE SECOND FLOOR TRAINING ROOM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X01100735 ↗ | 3321 PEARTREE AVENUE BRONX | Alteration | Permit Issued | 01/14/2025 | 08/17/2026 | Design DAVID CRUZ ENGINEERING INC. Contractor KEL-MAR INTERIORS INC | THE PROPOSED PROJECT CONSISTS OF A TYPE 2 INTERIOR RENOVATION OF ASINGLE STORY VEHICLE REPAIR SHOP, PARTS STORAGE / SALE FACILITY. THEREWILL… |
| M01112803 ↗ | 1523 2 AVENUE MANHATTAN | Alteration | Permit Issued | 12/04/2024 | 08/05/2026 | Design ROJAS AP Contractor K.J. REMODELING OF NY CO* Filer ROJAS AP | STRUCTURAL STEEL SUPPORT FOR NEW OPENING IN 18th FLOOR. INSTALLINTERIOR STAIR BETWEEN APTS. 17A & 18A. NO CHANGE IN USE OROCCUPANCY. |
| M01271154 ↗ | 244 COLUMBUS AVENUE MANHATTAN | Alteration | Permit Issued | 09/10/2025 | 08/04/2026 | Design LPE ENGINEERING, PC Owner 668 AVE, LLC. Contractor PLANET CONSTRUCTION & DE* | Vault and sidewalk replacement. Includes repair and replacement of the vault structural slab, replacement of the sidewalk flags, and replace… |
| M00990392 ↗ | 926 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 04/19/2024 | 07/23/2026 | Design HRM ENGINEERING SERVICES, PC Contractor FINE CONSTRUCTION SERVICE Filer ROJAS AP | REMOVE EXISTING FAN COIL UNITS AND HEAT PUMPS IN 2AB. INSTALL NEW AC SYSTEM AND ASSOCIATED DUCTS AND PIPING IN 2AB AND 2C AS PER MECHANICAL … |
| M01397522 ↗ | 20 WEST 74 STREET MANHATTAN | Alteration | Permit Issued | 05/13/2026 | 07/13/2026 | Design BECHT ENGINEERING BT, INC. Contractor SENTINEL BUILDERS, LLC | The William Alanson White Institute limited Plumbing work at restrooms and staff pantry work in conjunction with interior general constructi… |
| Name | Projects together | Most recent |
|---|---|---|
| BAZINI ENGINEERING, P.C. | 14 | 10/03/2024 |
| ROBAK ARCHITECTURE, LLC | 11 | 10/18/2023 |
| FIRM ENGINEERING, P.C. | 10 | 09/26/2023 |
| RAND ENGINEERING & ARCHITECTURE | 7 | 08/22/2025 |
| ROJAS AP | 5 | 07/10/2026 |
| BLOOM ENERGY CORPORATION | 4 | 06/04/2025 |
| HRM ENGINEERING SERVICES, PC | 4 | 07/10/2026 |
| KEVIN GALLEN PE LLC | 4 | 06/09/2025 |
| MG ENGINEERING D.P.C. | 4 | 05/19/2022 |
| OLA CONSULTING ENGINEERS, PC | 4 | 08/04/2025 |
| WQB ARCHITECTURE PLLC | 4 | 07/31/2024 |
| FINK & PLATT ARCHITECTS | 3 | 05/14/2026 |
| GERALD CALIENDO ARCHITECTS | 3 | 10/24/2023 |
| JRS ARCHITECT, PC | 3 | 05/30/2024 |
| LPE ENGINEERING, PC | 3 | 09/10/2025 |
| MURDOCK SOLON ARCHITECTS | 3 | 02/02/2021 |
| SIDERIS KEFALAS ENGINEERS PC | 3 | 12/13/2021 |
| DSM ENGINEERING ASSOCIATES, PC | 2 | 05/08/2026 |
| GREENBERG FARROW | 2 | 05/15/2020 |
| HILLMAN & MILEY CONSULTING ENGINEER | 2 | 04/30/2026 |
| OFFICE OF JAMES RUDERMAN | 2 | 03/27/2025 |
| OUT ENGINEER PLLC | 2 | 05/28/2025 |
| PEACHY CONSTRUCTION | 2 | 11/04/2025 |
| ROBERT DERECTOR ASSOCIATES | 2 | 08/21/2026 |
| RYAN SOAMES ENGINEERING | 2 | 12/14/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| AL-ARSH CONSTRUCTION CORP | 10 | 09/26/2023 |
| CARDONE CONCRETE INC | 5 | 05/10/2024 |
| EXPRESS PL SWR & WTR A | 5 | 05/13/2025 |
| THE METRO GROUP, INC | 5 | 02/06/2025 |
| BLOOM ENERGY CORPORATION | 4 | 06/04/2025 |
| C. D. E. AIR-CONDITIONING | 4 | 08/30/2024 |
| BROTHERS PRO CONSTRUCTION | 3 | 09/15/2023 |
| CATALANO PLBG & HTG INC | 3 | 06/04/2025 |
| COTTAM HEATING & AIR COND | 3 | 10/24/2023 |
| E-J ELECTRIC INSTALLATION | 3 | 06/04/2025 |
| E.L. CONTRACTING INC | 3 | 03/23/2023 |
| I & M CONSTRUCTION LLC | 3 | 05/30/2023 |
| NAT'L MECH. SVCS PLBG LLC | 3 | 06/12/2024 |
| TROJAN INTERIORS INC | 3 | 09/11/2024 |
| ALL SYSTEMS MECHANICAL * | 2 | 07/09/2024 |
| ARON CONSTRUCTION INC | 2 | 03/06/2023 |
| CLIMATE SOLUTIONS INC | 2 | 12/14/2021 |
| FIVE BOROUGH NYC LLC | 2 | 11/04/2025 |
| FRESH MEADOW MECH PLBG LL | 2 | 05/15/2020 |
| G.R.&J HUB HOME IMPROVE | 2 | 01/19/2024 |
| GBL MECHANICAL GROUP INC | 2 | 08/07/2026 |
| GOOD-WILL MECHANICAL CORP | 2 | 02/06/2023 |
| KEL-MAR INTERIORS INC | 2 | 08/07/2026 |
| PASQUALE QUARATINO INC | 2 | 12/02/2022 |
| RICHMOND PLBG & HTG CO IN | 2 | 11/14/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| PELICAN MANAGEMENT INC. | 22 | 05/13/2025 |
| METROPOLITAN DESIGN, INC. | 5 | 11/04/2025 |
| JVA-LEGOV REALTY | 4 | 03/23/2023 |
| FirstService Residential | 3 | 02/06/2025 |
| STELLAR MANAGEMENT | 3 | 05/19/2022 |
| CATAMARAN | 2 | 05/15/2020 |
| MACK EDGE MGMT LLC | 2 | 06/03/2025 |
| PENNYBACKER CAPITAL | 2 | 07/31/2024 |
| Roosevelt Island Assoc. | 2 | 12/14/2021 |
| WEBSTER ASSOCIATES | 2 | 12/02/2022 |
| 10 WHITE STREET COOPERATIVE | 1 | 10/03/2024 |
| 20 W 33RD ST. PROPERTY OWNER, LLC | 1 | 10/03/2019 |
| 668 AVE, LLC. | 1 | 09/10/2025 |
| BEACH LANE MANAGEMENT | 1 | 09/16/2020 |
| BRONX COMMUNITY CLEAN ENERGY PROJEC | 1 | 07/12/2022 |
| C/O ROSE ASSOCIATES, INC. | 1 | 01/17/2024 |
| FINGER MANAGEMENT CORP | 1 | 06/06/2024 |
| GABRIELLI TRUCK SALES, LTD. | 1 | 08/07/2026 |
| IHG MANAGEMENT | 1 | 11/14/2023 |
| IKEA PROPERTY INC. | 1 | 10/31/2019 |
| JDS CONSTRUCTION GROUP LLC | 1 | 08/25/2020 |
| JLL | 1 | 06/30/2026 |
| LISA MANAGEMENT | 1 | 08/21/2020 |
| METROPOLITAN REALTY ASSOCIATES LLC | 1 | 03/27/2025 |
| MINETTA LANE OWNERS | 1 | 05/28/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| PELICAN MANAGEMENT INC. | 18 | 10/24/2023 |
| MUNICIPAL BUILDING CONSULTANTS | 9 | 08/04/2025 |
| JULIAN A. GOMEZ | 7 | 08/22/2025 |
| BAZINI ENGINEERING, P.C. | 5 | 08/21/2026 |
| BLOOM ENERGY CORPORATION | 4 | 06/04/2025 |
| GERALD J. CALIENDO R.A., P.C. | 3 | 10/24/2023 |
| RIGHT WAY SERVICES NYC, INC. | 3 | 06/23/2026 |
| BMB BUILDING CONSULTING INC. | 2 | 06/21/2024 |
| CONVERSANO ASSOCIATES, INC. | 2 | 07/31/2024 |
| JAM CONSULTANTS, INC. | 2 | 08/09/2022 |
| LMS-ACE SERVICES | 2 | 05/08/2026 |
| MICHAEL ZENREICH ARCHITECT, PC | 2 | 11/07/2025 |
| ROJAS AP | 2 | 07/10/2026 |
| VMARCHDESIGN | 2 | 12/02/2022 |
| ADAM MAISER | 1 | 01/11/2024 |
| CITY WIDE EXPEDITING INC. | 1 | 08/07/2026 |
| JANCO BUILDING CONSULTANTS, LLC. | 1 | 07/21/2022 |
| JM ZONING, LLC. | 1 | 03/27/2025 |
| MANNYRZ | 1 | 07/25/2024 |
| MGJM CO | 1 | 08/29/2025 |
| PEACHY CONSTRUCTION | 1 | 11/04/2025 |
| RIZZO GROUP | 1 | 05/19/2022 |
| WILLIAM VITACCO ASSOCIATES | 1 | 02/12/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01444607 ↗ | 85 10 AVENUE MANHATTAN | Alteration | Permit Issued | 08/21/2026 | 08/21/2026 | Design ROBERT DERECTOR ASSOCIATES Owner RELATED COMPANIES Contractor SOUND REFRIGERATION & AIR Filer BAZINI ENGINEERING, P.C. | INSTALL FAN COIL UNIT AND DUCTWORK TO SERVE SECOND FLOOR TRAINING ROOM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X01100735 ↗ | 3321 PEARTREE AVENUE BRONX | Alteration | Permit Issued | 01/14/2025 | 08/17/2026 | Design DAVID CRUZ ENGINEERING INC. Contractor KEL-MAR INTERIORS INC | THE PROPOSED PROJECT CONSISTS OF A TYPE 2 INTERIOR RENOVATION OF ASINGLE STORY VEHICLE REPAIR SHOP, PARTS STORAGE / SALE FACILITY. THEREWILL… |
| M01112803 ↗ | 1523 2 AVENUE MANHATTAN | Alteration | Permit Issued | 12/04/2024 | 08/05/2026 | Design ROJAS AP Contractor K.J. REMODELING OF NY CO* Filer ROJAS AP | STRUCTURAL STEEL SUPPORT FOR NEW OPENING IN 18th FLOOR. INSTALLINTERIOR STAIR BETWEEN APTS. 17A & 18A. NO CHANGE IN USE OROCCUPANCY. |
| M01271154 ↗ | 244 COLUMBUS AVENUE MANHATTAN | Alteration | Permit Issued | 09/10/2025 | 08/04/2026 | Design LPE ENGINEERING, PC Owner 668 AVE, LLC. Contractor PLANET CONSTRUCTION & DE* | Vault and sidewalk replacement. Includes repair and replacement of the vault structural slab, replacement of the sidewalk flags, and replace… |
| M00990392 ↗ | 926 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 04/19/2024 | 07/23/2026 | Design HRM ENGINEERING SERVICES, PC Contractor FINE CONSTRUCTION SERVICE Filer ROJAS AP | REMOVE EXISTING FAN COIL UNITS AND HEAT PUMPS IN 2AB. INSTALL NEW AC SYSTEM AND ASSOCIATED DUCTS AND PIPING IN 2AB AND 2C AS PER MECHANICAL … |
| M01397522 ↗ | 20 WEST 74 STREET MANHATTAN | Alteration | Permit Issued | 05/13/2026 | 07/13/2026 | Design BECHT ENGINEERING BT, INC. Contractor SENTINEL BUILDERS, LLC | The William Alanson White Institute limited Plumbing work at restrooms and staff pantry work in conjunction with interior general constructi… |
| M01366770 ↗ | 75 9 AVENUE MANHATTAN | Alteration | Permit Issued | 06/30/2026 | 06/30/2026 | Design ROBERT DERECTOR ASSOCIATES Owner JLL Contractor SOUND REFRIGERATION & AIR Filer BAZINI ENGINEERING, P.C. | REPLACE ONE (1) COMPUTER ROOM AIR CONDITIONING (CRAC) UNIT ON SECOND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01365569 ↗ | 4 EAST 98 STREET MANHATTAN | Alteration | Permit Issued | 04/08/2026 | 06/02/2026 | Owner ST. BERNARD'S SCHOOL Contractor KEL-MAR INTERIORS INC Filer LMS-ACE SERVICES | Modification of the plumbing system to install a shower and associated piping as shown on the drawings filed herewith. No change in use, egr… |
| X01058459 ↗ | 760 EAST GUN HILL ROAD BRONX | Alteration | Signed-off | 06/28/2024 | 04/28/2026 | Design OLA CONSULTING ENGINEERS, PC Contractor RVM PLUMBING CORP | REPLACE DOMESTIC WATER BACKFLOW PREVENTER & ASSOCIATED PIPING AND SPECIALTIES. INSTALL NEW ELECTRIC WATER HEATER. INSTALL NEW SANITARY PIPIN… |
| B01086242 ↗ | 746A UNION STREET BROOKLYN | Alteration CO | Permit Issued | 08/16/2024 | 03/30/2026 | Design ROJAS AP Contractor UPPER RESTORATION INC | Structural/Foundation work in conjunction with ALT CO for renovation of a two family home |
| M00870548 ↗ | 134 GRAND STREET MANHATTAN | Alteration | Permit Issued | 05/18/2023 | 11/24/2025 | Design SYNTHESIS ARCHITECTURE Owner MACK EDGE MGMT LLC Contractor KING ROSE OF NY, INC | REBUILD EXISTING ELEVATOR WITH MODIFICATIONS TO THE SHAFT FOR NEW OPENINGS. WORK IN SUB CELLAR RELATED TO SHAFT OPENINGS. REDUCED SCOPE OF W… |
| M00861152 ↗ | 920 RIVERSIDE DRIVE MANHATTAN | Alteration CO | Permit Issued | 08/08/2023 | 11/17/2025 | Design ROJAS AP Owner PELICAN MANAGEMENT INC. Contractor GRACE GOLD DESIGN LLC | SP & PL work ion conjunction with CO |
| X01066547 ↗ | 145 EAST 149 STREET BRONX | Alteration | Permit Issued | 09/10/2024 | 10/21/2025 | Design LPE ENGINEERING, PC Contractor TROJAN INTERIORS INC | New exterior Awning at entrance. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X01066553 ↗ | 147 EAST 149 STREET BRONX | Alteration | Permit Issued | 09/11/2024 | 10/21/2025 | Design LPE ENGINEERING, PC Contractor TROJAN INTERIORS INC | New exterior Awning at entrance. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X00917910 ↗ | 661 EAST 181 STREET BRONX | Alteration | Signed-off | 09/29/2023 | 10/01/2025 | Contractor RICHARD MORTMAN Filer JULIAN A. GOMEZ | Replacement of existing fuel storage tank. No change to use, egress or occupancy. |
| X00943362 ↗ | 441 EAST FORDHAM ROAD BRONX | Alteration | Permit Issued | 12/20/2023 | 09/24/2025 | Design BLOOM ENERGY CORPORATION Contractor BLOOM ENERGY CORPORATION Filer BLOOM ENERGY CORPORATION | FILING HEREWITH THE ISNTALLATION OF TWO (2) BLOOM ENERGY ES5 OUTDOOR NATURAL GAS CLEAN ENERGY SERVERS AS PER PLANS. NO CHANGE IN USE, EGRES… |
| X00967943 ↗ | 1045 ANDERSON AVENUE BRONX | Alteration | Signed-off | 06/05/2024 | 09/16/2025 | Design BAZINI ENGINEERING, P.C. Owner FINGER MANAGEMENT CORP Contractor ERIN CONSTRUCTION & DEVELOPMENT | INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01251748 ↗ | 315 ST JOHNS PLACE BROOKLYN | Alteration | Signed-off | 08/15/2025 | 08/28/2025 | Design GEE2000 ARCHITECT P.C. Contractor MGJM CO INC Filer MGJM CO | Renovation of Unit 4A on 4th floor, partition work as per plan. No change in use, occupancy or exit. |
| X00680294 ↗ | 661 EAST 181 STREET BRONX | Alteration | Permit Issued | 09/29/2023 | 08/20/2025 | Contractor THE METRO GROUP, INC Filer JULIAN A. GOMEZ | General Construction and Mechanical related work associated with Heating Plant Upgrade. No changes to use, egress or occupancy. |
| X00930286 ↗ | 661 EAST 181 STREET BRONX | Alteration | Permit Issued | 09/29/2023 | 08/20/2025 | Contractor THE METRO GROUP, INC Filer JULIAN A. GOMEZ | Mechanical related work for Heating Plant Upgrade at Dennis Lane Apartments. Boiler installed at adjacent building - 661-665 East 181st Stre… |
| M01183778 ↗ | 195 CHRYSTIE STREET MANHATTAN | Alteration | Signed-off | 06/20/2025 | 07/02/2025 | Design PEACHY CONSTRUCTION Contractor FIVE BOROUGH NYC LLC Filer PEACHY CONSTRUCTION | INSTALL NEW WET PIPE FIRE SPRINKLER SYSTEM FOR RESIDENTIAL PORTION OF THE BUILDING AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDE… |
| M01073206 ↗ | 134 GRAND STREET MANHATTAN | Alteration | Signed-off | 07/01/2024 | 06/11/2025 | Design SYNTHESIS ARCHITECTURE Owner MACK EDGE MGMT LLC Contractor R.J.C. MECHANICAL CORP | Create one new mezzanine bathroom. Modify sprinkler piping and add three new sprinkler heads. Relocate existing fixtures in modified kitchen… |
| M01231544 ↗ | 163 EAST 84 STREET MANHATTAN | Alteration | Filed — no permit on record | 05/28/2025 | — | Design OUT ENGINEER PLLC Owner MINETTA LANE OWNERS Filer BAZINI ENGINEERING, P.C. | — |
| Q01198258 ↗ | 27-11 49 AVENUE QUEENS | Alteration | Signed-off | 03/27/2025 | 04/08/2025 | Design OFFICE OF JAMES RUDERMAN Contractor JC CONTRACTING.MGMT LLC Filer JM ZONING, LLC. | FILING HEREWITH STRUCTURAL REPAIRS AS PER PLANS. |
| X00680931 ↗ | 661 EAST 181 STREET BRONX | Alteration | Permit Issued | 09/29/2023 | 04/07/2025 | Contractor THE METRO GROUP PLBG LLC Filer JULIAN A. GOMEZ | Plumbing related work in association with Heating Plant Upgrade. No change to use, egress or occupancy. |
| X00930514 ↗ | 661 EAST 181 STREET BRONX | Alteration | Permit Issued | 09/29/2023 | 04/07/2025 | Contractor NAT'L MECH. SVCS PLBG LLC Filer JULIAN A. GOMEZ | Plumbing related work related to Heating Plant Upgrade to Dennis Lane Apartments. No change to use, egress or occupancy. |
| M01007470 ↗ | 43 WEST 64 STREET MANHATTAN | Alteration | Permit Issued | 07/25/2024 | 11/18/2024 | Design VENEZIA ENGINEERING, LLC Contractor SNS ORGNIZATION LTD Filer MANNYRZ | Filing herewith ST plans for Roof level. For new horizontal support member on existing dunnage to accommodate a new chiller and a new transf… |
| S01014033 ↗ | 200 CLARKE AVENUE STATEN ISLAND | Alteration | Signed-off | 06/21/2024 | 11/18/2024 | Design KEVIN GALLEN PE LLC Owner NEW YORK PUBLIC LIBRARY Contractor C. D. E. AIR-CONDITIONING | Proposed Mechanical work to remove existing RTU, PTAC, split system units, and rooftop toilet exhaust fans. Install new HVAC system as per … |
| S01089979 ↗ | 200 CLARKE AVENUE STATEN ISLAND | Alteration | Signed-off | 08/30/2024 | 11/12/2024 | Design VENEZIA ENGINEERING, LLC Contractor C. D. E. AIR-CONDITIONING | PROVIDE NEW STRUCTURAL STEEL FOR THE SUPPORT OF NEW ROOFTOP MECHANICAL UNITS. PROVIDE NEW ROOF SCREENING AND RAILINGS IN ACCORDANCE WITH REC… |
| M01115127 ↗ | 195 CHRYSTIE STREET MANHATTAN | Alteration | Signed-off | 10/17/2024 | 10/30/2024 | Design PEACHY CONSTRUCTION Contractor ADRIANO PLMBG & HTG CORP | INSTALL NEW 6 FIRE SPRINKLER WATER SERVICE, PRIMARY BACFKLOW PREVENTION, AND NEW WET FIRE SPRINKLER SYSTEM FOR COMMERCIAL PORTION OF THE BUI… |
| M00445457 ↗ | 43 WEST 64 STREET MANHATTAN | Alteration | Signed-off | 04/14/2021 | 10/29/2024 | Design KEVIN GALLEN PE LLC Contractor SNS ORGNIZATION LTD Filer MANNYRZ | REPLACEMENT OF 2 (170 ) TON AIR COOLED PACKAGE CHILLER ON THE ROOF. |
| M01113668 ↗ | 8 WHITE STREET MANHATTAN | Alteration | Signed-off | 10/03/2024 | 10/14/2024 | Design BAZINI ENGINEERING, P.C. Contractor THE BIG IC LLC | REPLACE GAS RISER IN RESPONSE TO CONSOLIDATED-EDISON SHUT DOWN AND CONNECT TO EXISTING PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPA… |
| M01091060 ↗ | 1880 2 AVENUE MANHATTAN | Alteration | Permit Issued | 09/06/2024 | 10/07/2024 | Design OUT ENGINEER PLLC Contractor DYNAIRE Filer BAZINI ENGINEERING, P.C. | INSTALLATION OF NEW COOLING TOWER FILTRATION SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00405939 ↗ | 18 WEST 27 STREET MANHATTAN | Alteration | Signed-off | 10/19/2020 | 09/27/2024 | Design BAZINI ENGINEERING, P.C. Contractor ALLSTATE SPRINKLER LLC | INSTALL NEW WET FIRE SPRINKLER SYSTEM FOR COMPLETE BUILDING COVERAGE AS PER PLANS AND IN ACCORDANCE WITH LL87/2004. NO CHANGE IN USE, EGRESS… |
| M01098305 ↗ | 90 GRAND STREET MANHATTAN | Alteration | Permit Issued | 09/03/2024 | 09/16/2024 | Design CQ&J CORPORATION Owner ZAR PROPERTY NY Contractor ICON INTERIORS INC | Application filed herewith for office tenant fit out of the 5, 6 and 7 floors. General construction for removal and installation of wall … |
| X00943367 ↗ | 441 EAST FORDHAM ROAD BRONX | Alteration | Signed-off | 12/20/2023 | 09/11/2024 | Design BLOOM ENERGY CORPORATION Contractor CATALANO PLBG & HTG INC Filer BLOOM ENERGY CORPORATION | FILING HEREWITH THE ISNTALLATION OF TWO (2) BLOOM ENERGY ES5 OUTDOOR NATURAL GAS ENERGY FUEL CELLSAS PER PLANS. NO CHANGE IN USE, EGRESS, O… |
| X00943370 ↗ | 441 EAST FORDHAM ROAD BRONX | Alteration | Signed-off | 12/20/2023 | 09/11/2024 | Design BLOOM ENERGY CORPORATION Contractor CATALANO PLBG & HTG INC Filer BLOOM ENERGY CORPORATION | FILING HEREWITH THE INSTALLATION OF FOUR (4) BLOOM ENERGY ES5 OUTDOOR NATURAL GAS CLEAN ENERGY SERVERS AS PER PLANS. NO CHANGE IN USE, EGRE… |
| X00943374 ↗ | 441 EAST FORDHAM ROAD BRONX | Alteration | Signed-off | 12/20/2023 | 09/11/2024 | Design BLOOM ENERGY CORPORATION Contractor BLOOM ENERGY CORPORATION Filer BLOOM ENERGY CORPORATION | FILING HEREWITH THE INSTALLATION OF TWO (2) BLOOM ENERGY ES5 OUTDOOR NATURAL GAS ENERGY FUEL CELLS AS PER PLANS. NO CHANGE IN USE, EGRESS, … |
| X01058516 ↗ | 2169 BLACKROCK AVENUE BRONX | Alteration | Signed-off | 07/09/2024 | 08/28/2024 | Design OLA CONSULTING ENGINEERS, PC Contractor ALL SYSTEMS MECHANICAL * | DEMOLITION OF EXISTING BOILER ACCESSORIES, PIPING, WIRING, ETC. DEMOLITION OF EXISTING GREASE DUCTWORK AND KITCHEN EXHAUST FAN. INSTALLATIO… |
| M00947389 ↗ | 421 HUDSON STREET MANHATTAN | Alteration | Signed-off | 01/04/2024 | 08/07/2024 | Contractor CROWN AIRE, INC | FILING HEREWITH FOR THE MECHANICAL WORK RELATED TO THE INTERIOR RENOVATION OF AN EXISTING SPACE. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANC… |
| X01058396 ↗ | 760 EAST GUN HILL ROAD BRONX | Alteration | Signed-off | 07/09/2024 | 07/18/2024 | Design OLA CONSULTING ENGINEERS, PC Contractor ALL SYSTEMS MECHANICAL * | INSTALLATION OF NEW BOILER, BURNERS, AND ASSOCIATED ACCESSORIES . INSTALLATION OF NEW HEAT EXCHANGER.. DEMOLITION OF NEW UNIT VENTILATORS |
| X01058527 ↗ | 2169 BLACKROCK AVENUE BRONX | Alteration | Filed — no permit on record | 07/09/2024 | — | Design OLA CONSULTING ENGINEERS, PC | — |
| M01035246 ↗ | 195 CHRYSTIE STREET MANHATTAN | Alteration | Filed — no permit on record | 05/21/2024 | — | Design BAZINI ENGINEERING, P.C. | — |
| M01049538 ↗ | 109 WEST 129 STREET MANHATTAN | Alteration | Signed-off | 05/14/2024 | 05/16/2024 | Design BAZINI ENGINEERING, P.C. Contractor MEDLEY AIR INC | INSTALLATION OF (3) HEAT PUMP SYSTEMS CONNECTED TO EXISTING DUCT WORK, (2) MINI SPLIT SYSTEMS AND ASSOCIATED MECHANICAL ALTERATIONS AS PER P… |
| Q00979672 ↗ | 10-27 50 AVENUE QUEENS | Alteration | Signed-off | 02/12/2024 | 03/04/2024 | Design SULLIVAN ARCHITECTURE Contractor BROADWAY CONSTRUCTION GRO | Plumbing work as shown on the plans. |
| Q00992940 ↗ | 20-02 SEAGIRT BOULEVARD QUEENS | Alteration | Signed-off | 02/07/2024 | 03/04/2024 | Design RAS PE CONSULTING ENGINEERS Owner PELICAN MANAGEMENT INC. Contractor CARDONE CONCRETE INC | Structural repairs of existing parking garage. Repairs include beams, girders, columns and floor slab. |
| M00192673 ↗ | 48 WARREN STREET MANHATTAN | Alteration | Signed-off | 02/20/2020 | 02/27/2024 | Owner PROMETHIUM REALTY CORP. Contractor PRO CONCRETE CONTRACTORS Filer ADAM MAISER | REPLACE A SECTION OF CITY SIDEWALK IN FRONT OF BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M07998913 ↗ | 200 CHAMBERS STREET MANHATTAN | Alteration | Signed-off | 12/22/2022 | 02/26/2024 | Owner FirstService Residential Contractor THE METRO GROUP, INC Filer JULIAN A. GOMEZ | HVAC System Upgrade program. No change to use, egress or occupancy. |
| M00978990 ↗ | 240 EAST 86 STREET MANHATTAN | Alteration | Signed-off | 01/17/2024 | 02/06/2024 | Contractor THE METRO GROUP, INC Filer BAZINI ENGINEERING, P.C. | ADDITION OF STEEL CATWALK/RAILINGS TO EXISTING DUNNAGE AT ROOF LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00740797 ↗ | 116 EAST 17 STREET MANHATTAN | Alteration | Permit Issued | 07/21/2022 | 11/17/2023 | Design BAZINI ENGINEERING, P.C. Contractor PLUMBING & HTG DOCTOR INC | PROPOSE TO INSTALL NEW SPRINKLERS AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. |
| M00922558 ↗ | 315 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 09/20/2023 | 11/09/2023 | Design MCSWEENEY ENGINEERING Owner PELICAN MANAGEMENT INC. Contractor WNW & SONS PLUMBING & HTG Filer PELICAN MANAGEMENT INC. | Modification of interior partitions in Cellar space as per plans. No change in use, egress, or occupancy |
| S00919225 ↗ | 100 DANIEL LOW TERRACE STATEN ISLAND | Alteration | Signed-off | 09/12/2023 | 10/13/2023 | Design BAZINI ENGINEERING, P.C. Contractor RICHMOND PLBG & HTG CO IN | ACTIVATION OF GAS ON EXISTING LOW PRESSURE BOILER ON EXISTING GAS/OIL BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| S00919242 ↗ | 100 DANIEL LOW TERRACE STATEN ISLAND | Alteration | Signed-off | 09/12/2023 | 10/10/2023 | Design BAZINI ENGINEERING, P.C. Owner IHG MANAGEMENT Contractor RICHMOND PLUMBING & HEAT* | INSTALL NEW NATURAL GAS SERVICE AND GAS METER TO SERVE EXISTING LOW PRESSURE HEATING BOILER PLANT WITH ACTIVATION OF GAS ON EXISTING GAS/OIL… |
| Q00908890 ↗ | 20-20 SEAGIRT BOULEVARD QUEENS | Alteration | Signed-off | 08/07/2023 | 08/24/2023 | Design FIRM ENGINEERING, P.C. Owner PELICAN MANAGEMENT INC. Contractor AL-ARSH CONSTRUCTION CORP Filer PELICAN MANAGEMENT INC. | FACADE REPAIR WORK TO COMPLY WITH LL11/1998. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00908871 ↗ | 20-20 SEAGIRT BOULEVARD QUEENS | Alteration | Signed-off | 08/07/2023 | 08/23/2023 | Design FIRM ENGINEERING, P.C. Owner PELICAN MANAGEMENT INC. Contractor AL-ARSH CONSTRUCTION CORP Filer PELICAN MANAGEMENT INC. | FACADE REPAIR WORK TO COMPLY WITH LL11/1998. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00908895 ↗ | 20-20 SEAGIRT BOULEVARD QUEENS | Alteration | Signed-off | 08/02/2023 | 08/23/2023 | Design FIRM ENGINEERING, P.C. Owner PELICAN MANAGEMENT INC. Contractor AL-ARSH CONSTRUCTION CORP Filer PELICAN MANAGEMENT INC. | FACADE REPAIR WORK. |
| Q00908777 ↗ | 20-20 SEAGIRT BOULEVARD QUEENS | Alteration | Signed-off | 07/31/2023 | 08/17/2023 | Design FIRM ENGINEERING, P.C. Owner PELICAN MANAGEMENT INC. Contractor AL-ARSH CONSTRUCTION CORP Filer PELICAN MANAGEMENT INC. | FACADE REPAIR WORK TO COMPLY WITH LL11/1998. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00908814 ↗ | 20-20 SEAGIRT BOULEVARD QUEENS | Alteration | Signed-off | 07/31/2023 | 08/17/2023 | Design FIRM ENGINEERING, P.C. Owner PELICAN MANAGEMENT INC. Contractor AL-ARSH CONSTRUCTION CORP Filer PELICAN MANAGEMENT INC. | FACADE REPAIR WORK TO COMPLY WITH LL11/1998. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00908137 ↗ | 20-20 SEAGIRT BOULEVARD QUEENS | Alteration | Signed-off | 08/01/2023 | 08/16/2023 | Design FIRM ENGINEERING, P.C. Owner PELICAN MANAGEMENT INC. Contractor AL-ARSH CONSTRUCTION CORP Filer PELICAN MANAGEMENT INC. | FACADE REPAIRS TO COMPLY WITH LL11/1998. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00908760 ↗ | 20-20 SEAGIRT BOULEVARD QUEENS | Alteration | Signed-off | 07/26/2023 | 08/16/2023 | Design FIRM ENGINEERING, P.C. Owner PELICAN MANAGEMENT INC. Contractor AL-ARSH CONSTRUCTION CORP Filer PELICAN MANAGEMENT INC. | FACADE REPAIR WORK TO COMPLY WITH LL11/1998. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00908767 ↗ | 20-20 SEAGIRT BOULEVARD QUEENS | Alteration | Signed-off | 07/27/2023 | 08/16/2023 | Design FIRM ENGINEERING, P.C. Owner PELICAN MANAGEMENT INC. Contractor AL-ARSH CONSTRUCTION CORP Filer PELICAN MANAGEMENT INC. | FACADE REPAIR WORK TO COMPLY WITH LL11/1998. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00908797 ↗ | 20-20 SEAGIRT BOULEVARD QUEENS | Alteration | Signed-off | 08/01/2023 | 08/16/2023 | Design FIRM ENGINEERING, P.C. Contractor AL-ARSH CONSTRUCTION CORP | FACADE REPAIR WORK TO COMPLY WITH LL11/1998. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00908801 ↗ | 20-20 SEAGIRT BOULEVARD QUEENS | Alteration | Signed-off | 08/01/2023 | 08/16/2023 | Design FIRM ENGINEERING, P.C. Owner PELICAN MANAGEMENT INC. Contractor AL-ARSH CONSTRUCTION CORP Filer PELICAN MANAGEMENT INC. | FACADE REPAIR WORK TO COMPLY WITH LL11/1998. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00861063 ↗ | 315 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 05/30/2023 | 07/28/2023 | Design ROBAK ARCHITECTURE, LLC Contractor I & M CONSTRUCTION LLC | INTERIOR RENOVATION AND COMBINATION OF EAPARTMENTS 18B AND 18C. MINOR PARTITION ALTERATIONS. NO CHANGE IN EGRESS OR FIRE PROTECTION. |
| M07999263 ↗ | 200 CHAMBERS STREET MANHATTAN | Alteration | Signed-off | 03/09/2023 | 07/06/2023 | Owner FirstService Residential Contractor NAT'L MECH. SVCS PLBG LLC Filer JULIAN A. GOMEZ | Plumbing related work associated with HVAC System Upgrade. No change to use, egress or occupancy. |
| M00866368 ↗ | 200 CHAMBERS STREET MANHATTAN | Alteration | Signed-off | 06/06/2023 | 07/05/2023 | Design OFFICE OF JAMES RUDERMAN Contractor THE METRO GROUP, INC | Support for New Mechanical Equipment on EMR Roof. No change to use, egress or occupancy |
| M00823184 ↗ | 151 EAST 80 STREET MANHATTAN | Alteration | Signed-off | 02/03/2023 | 06/26/2023 | Design ROBAK ARCHITECTURE, LLC Contractor CARDONE CONCRETE INC | Temporary construction fence in conjunction with DOB Now Job# M08022409-S1 |
| Q00887999 ↗ | 20-02 SEAGIRT BOULEVARD QUEENS | Alteration | Signed-off | 06/13/2023 | 06/23/2023 | Design ROBAK ARCHITECTURE, LLC Owner PELICAN MANAGEMENT INC. Contractor A & E CONSTRUCTION OF NY Filer PELICAN MANAGEMENT INC. | INTERIOR RENOVATION OF APARTMENT 5A. NO CHANGE IN EGRESS OR FIRE PROTECTION. NO CHANGE IN THE NUMBER OF BEDROOMS. |
| X00878088 ↗ | 1700 GRAND CONCOURSE BRONX | Alteration | Signed-off | 06/05/2023 | 06/13/2023 | Design ROBAK ARCHITECTURE, LLC Owner PELICAN MANAGEMENT INC. Contractor EXPRESS PLBG SWR & WTR MA Filer PELICAN MANAGEMENT INC. | Remove existing fixtures & associated piping in apt. 11F & 11G. Install new & replacement fixtures and piping as shown on plans. |
| M00856913 ↗ | 151 EAST 80 STREET MANHATTAN | Alteration | Signed-off | 04/18/2023 | 05/19/2023 | Design ROBAK ARCHITECTURE, LLC Owner PELICAN MANAGEMENT INC. Contractor COTTAM HEATING AIR COND Filer PELICAN MANAGEMENT INC. | INTERIOR RENOVATION OF APARTMENT 10C, REMOVAL OF NON-LOAD BEARING PARTITIONS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| Q00833291 ↗ | 269 GRAND CENTRAL PKWY QUEENS | Alteration | Signed-off | 03/23/2023 | 05/03/2023 | Design BRONZINO ENGINEERING, P.C. Contractor GLASS ARMOR OF NEW YORK I | PERFORM SLOPED EXCAVATION TO FACILITATE THE REMOVAL OF 4 UNDERGROUND FUEL STORAGE TANKS |
| M00856850 ↗ | 315 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 04/17/2023 | 04/26/2023 | Design ROBAK ARCHITECTURE, LLC Contractor FREEDOM GS | INTERIOR DEMOLOITION OF EXISTING COMMERCIAL SPACE (PARK WEST RADIOLOGY) IN THE CELLAR. REMOVING ALL MEP COMPONENTS, NON-LOAD BEARING PARTITI… |
| M00766078 ↗ | 121 LENOX AVENUE MANHATTAN | Alteration | Signed-off | 07/01/2022 | 04/25/2023 | Design W.D.ROSS, R.A., P.C Owner WEBSTER ASSOCIATES Contractor PASQUALE QUARATINO INC Filer VMARCHDESIGN | PROPOSING TO LEGALIZE A GAS HOT WATER HEATER TO ADDRESS ECB VIOLATION # 39015638Y. |
| M00670539 ↗ | 305 2 AVENUE MANHATTAN | Alteration | Signed-off | 12/05/2022 | 04/14/2023 | Design WQB ARCHITECTURE PLLC Contractor GOODWILL MECHANICAL | Propose renovation at apartment 901. Removal and installation of non load bearing partitions and related finishes all as per plans herewith … |
| M00541823 ↗ | 305 2 AVENUE MANHATTAN | Alteration | Signed-off | 02/06/2023 | 04/12/2023 | Design WQB ARCHITECTURE PLLC Owner PENNYBACKER CAPITAL Contractor AAA TOTAL PLUMBING, INC | Propose plumbing modifications at apartment 702 all as per plans herewith filed. No change in use, egress or occupancy filed under this appl… |
| M00541816 ↗ | 305 2 AVENUE MANHATTAN | Alteration | Signed-off | 02/06/2023 | 04/06/2023 | Design WQB ARCHITECTURE PLLC Owner PENNYBACKER CAPITAL Contractor GOODWILL MECHANICAL | Propose apartment renovation of unit 702 and combination as per TPPN3/97. Removal and installation of non load bearing partitions and relate… |
| M00847584 ↗ | 315 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 03/22/2023 | 03/31/2023 | Owner PELICAN MANAGEMENT INC. Contractor CARDONE CONCRETE INC Filer PELICAN MANAGEMENT INC. | STRUCTURAL REPAIRS OF CONCRETE SLABS AND JOISTS IN PARKING GARAGE. NO CHANGE IN USE OR OCCUPANCY. |
| M08034570 ↗ | 1186 BROADWAY MANHATTAN | Alteration | Permit Issued | 12/13/2022 | 03/21/2023 | Contractor TROJAN INTERIORS INC | ALTERATION OF THE 6TH, 9TH, 10TH AND 12TH FLOORS FOR THE ADDITION OF NEW STORAGE CLOSETS, CONSTRUCTION WORK ONLY. NO CHANGE IN USE, EGRESS O… |
| X00827974 ↗ | 939 WOODYCREST AVENUE BRONX | Alteration | Signed-off | 02/13/2023 | 03/13/2023 | Design ROBAK ARCHITECTURE, LLC Owner PELICAN MANAGEMENT INC. Contractor I & M CONSTRUCTION LLC Filer PELICAN MANAGEMENT INC. | INTERIOR RENOVATION OF EXISTING APARTMENT 40. MINOR PARTITION ALTERATIONS. NO CHANGE IN EGRESS OR FIRE PROTECTION. NO CHANGE IN THE NUMBER O… |
| M00829623 ↗ | 315 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 02/28/2023 | 03/06/2023 | Design ROBAK ARCHITECTURE, LLC Owner PELICAN MANAGEMENT INC. Contractor BROTHERS PRO CONSTRUCTION Filer PELICAN MANAGEMENT INC. | INTERIOR RENOVATION OF APARTMENTS 12N & 12P. MINOR PARTITION ALTERATIONS. NO CHANGE IN EGRESS OR FIRE PROTECTION. NO CHANGE IN THE NUMBER OF… |
| M00727997 ↗ | 117 EAST 57 STREET MANHATTAN | Alteration | Signed-off | 11/16/2022 | 02/23/2023 | Design JRS ARCHITECT, PC Contractor RELIABLE PLBG & HTG CORP | Minor renovation of apartment. No change to use, egress or occupancy |
| M00671525 ↗ | 114 EAST 90 STREET MANHATTAN | Alteration | Signed-off | 08/09/2022 | 02/17/2023 | Design FINK & PLATT ARCHITECTS Contractor CR SAFETY GROUP Filer JAM CONSULTANTS, INC. | Interior fit-out as per plans filed herewith. No change in use, egress, or occupancy under this application. |
| M08022409 ↗ | 151 EAST 80 STREET MANHATTAN | Alteration | Signed-off | 10/26/2022 | 02/15/2023 | Design ROBAK ARCHITECTURE, LLC Owner PELICAN MANAGEMENT INC. Contractor BROTHERS PRO CONSTRUCTION Filer PELICAN MANAGEMENT INC. | REMOVAL OF ALL INTERIOR NON-LOAD BEARING PARTITIONS AND FIXTURES. MAKE SITE READY FOR NEW RENOVATIONS UNDER SEPARATE APPLICATION. NO CHANGE … |
| Q00808569 ↗ | 20-02 SEAGIRT BOULEVARD QUEENS | Alteration | Signed-off | 02/13/2023 | 02/15/2023 | Design ROBAK ARCHITECTURE, LLC Contractor COTTAM HEATING AIR COND | INSTALLATION OF REPLACEMENT HVAC UNIT. |
| X00825758 ↗ | 939 WOODYCREST AVENUE BRONX | Alteration | Signed-off | 02/08/2023 | 02/13/2023 | Design ROBAK ARCHITECTURE, LLC Owner PELICAN MANAGEMENT INC. Contractor I & M CONSTRUCTION LLC Filer PELICAN MANAGEMENT INC. | Lobby renovation. New drop ceiling, new stair treads, re-laminate and level walls. Install temporary wood structure all as per plans filed h… |
| M00725756 ↗ | 117 EAST 57 STREET MANHATTAN | Alteration | Signed-off | 10/24/2022 | 02/09/2023 | Design JRS ARCHITECT, PC Contractor G.R.&J HUB HOME IMPROVE | Herewith filing PAA to change/ supersede SIA. |
| M00727948 ↗ | 117 EAST 57 STREET MANHATTAN | Alteration | Signed-off | 11/16/2022 | 02/09/2023 | Design JRS ARCHITECT, PC Contractor G.R.&J HUB HOME IMPROVE | INSTALLATION OF MECHANICAL SYSTEMS |
| M08038804 ↗ | 790 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 11/14/2022 | 01/17/2023 | Design BAZINI ENGINEERING, P.C. Owner FirstService Residential Contractor G.BASSOLINO PLUMBING LTD | INSTALL REPLACEMENT GAS METERS AND GAS PIPING AND CONNECT TO EXISTING GAS APPLIANCES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X00362065 ↗ | 3245 YATES AVENUE BRONX | Alteration | Signed-off | 08/04/2020 | 12/01/2022 | Contractor FULTON PLBG & HTG CORP Filer BLOOM ENERGY CORPORATION | FILING HEREWITH PLUMBING WORK ASSOCIATED WITH THE INSTALLATION OF BLOOM ENERGY OUTDOOR NATURAL GAS ENERGY SERVERS AS PER PLANS. NO CHANGE I… |
| M00751680 ↗ | 20 WEST 64 STREET MANHATTAN | Alteration | Signed-off | 07/12/2022 | 09/20/2022 | Contractor C C CONTROLLED COMBUSTION | MECHANICAL WORK BEING PERFORMED FOR EXISTING CHP UNIT AND BOILER FEED TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00694417 ↗ | 20-33 SEAGIRT BOULEVARD QUEENS | Alteration | Permit Issued | 03/28/2022 | 09/13/2022 | Design GERALD CALIENDO ARCHITECTS Owner PELICAN MANAGEMENT INC. Contractor EXPRESS PLBG SWR & WTR MA | Subsequent filing for sprinkler work type |
| Q00692522 ↗ | 20-02 SEAGIRT BOULEVARD QUEENS | Alteration | Permit Issued | 03/23/2022 | 08/17/2022 | Design GERALD CALIENDO ARCHITECTS Owner PELICAN MANAGEMENT INC. Contractor ARON CONSTRUCTION INC | Installation of new non-load bearing interior partitions to create a laundry room and storage room at the cellar level. Plumbing filed under… |
| M00573560 ↗ | 121 LENOX AVENUE MANHATTAN | Alteration | Signed-off | 08/18/2021 | 05/23/2022 | Design W.D.ROSS, R.A., P.C Owner WEBSTER ASSOCIATES Contractor ALLSTATE CONSTRUCTION & R Filer VMARCHDESIGN | Proposed to repoint all brick joints as needed and replace all damaged bricks throughout the entire inactive chimney as needed. There is no … |
| M00544903 ↗ | 173 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 10/19/2021 | 04/21/2022 | Design FINK & PLATT ARCHITECTS Contractor MACRO CONSTRUCTION INC Filer JAM CONSULTANTS, INC. | Open and closing of wall to expose existing piping and risers. Removal of millwork as shown on drawings filed herewith. No change in use, eg… |
| M00324374 ↗ | 161 SOHO SQUARE MANHATTAN | Alteration | Signed-off | 03/04/2020 | 03/11/2022 | Design MG ENGINEERING D.P.C. Owner STELLAR MANAGEMENT Contractor CAPITOL FIRE SPRINKLER CO Filer RIZZO GROUP | Remove (8) heads, install (13) new heads on 6th Flr; Remove (20) heads, relocate (25) heads, Install (19) new heads on 7th Flr; Remove (193)… |
| S00658405 ↗ | 74 HOWARD AVENUE STATEN ISLAND | Alteration | Signed-off | 02/02/2022 | 02/07/2022 | Design KEVIN GALLEN PE LLC Contractor C. D. E. AIR-CONDITIONING | INSTALL NEW MECHANICAL WORK ON FIRST AND SECOND FLOOR AT SCHOOL. NO CHANGE IN USE, EGRESS, AND OCCUPANY. |
| S00662554 ↗ | 74 HOWARD AVENUE STATEN ISLAND | Alteration | Signed-off | 02/02/2022 | 02/07/2022 | Design KEVIN GALLEN PE LLC Contractor C. D. E. AIR-CONDITIONING | INSTALL NEW MECHANICAL WORK ON FIRST AND SECOND FLOOR AT COTTAGE AREA. NO CHANGE IN USE, EGRESS, AND OCCUPANY. |
| M00495268 ↗ | 28 HOWARD STREET MANHATTAN | Alteration | Signed-off | 06/28/2021 | 12/14/2021 | Design HRM ENGINEERING SERVICES, PC Contractor DLG INTERIORS RENOVATIONS | Mechanical work as shown on plans in conjunction with DOBNOW GC job # M00451827-P1. |
| M00357980 ↗ | MAIN STREET MANHATTAN | Alteration | Permit Issued | 07/28/2020 | 12/11/2021 | Design RYAN SOAMES ENGINEERING Owner Roosevelt Island Assoc. Contractor CLIMATE SOLUTIONS INC Filer JAM CONSULTANTS, INC. | Filing for mechanical work related to lobby renovations. Removal and installation of duct work |
| M00587034 ↗ | 1165 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/13/2021 | 11/16/2021 | Design ABS ENGINEERING, PLLC Contractor THOMAS MAINTENANCE INC Filer LMS-ACE SERVICES | PROPOSED INSTALLATION OF INDOOR SPLIT A/C SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. THERE IS NO CHSNGE IN USE, EGRESS OROCCUP… |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/18/2026 | HVAC-R and service water heating system controls | 3321 PEARTREE AVENUE | Gregory Benazzi | energy_progress |
| 08/18/2026 | Shutoff dampers | 3321 PEARTREE AVENUE | Gregory Benazzi | energy_progress |
| 08/18/2026 | Final | 3321 PEARTREE AVENUE | Gregory Benazzi | progress |
| 08/18/2026 | Mechanical Systems | 3321 PEARTREE AVENUE | Gregory Benazzi | special |
| 08/18/2026 | Heating Systems | 3321 PEARTREE AVENUE | Gregory Benazzi | special |
| 08/18/2026 | HVAC-R and service water piping design and insulation | 3321 PEARTREE AVENUE | Gregory Benazzi | energy_progress |
| 08/18/2026 | HVAC-R and service water heating equipment | 3321 PEARTREE AVENUE | Gregory Benazzi | energy_progress |
| 08/13/2026 | Fire-Resistant Penetrations and Joints | 746A UNION STREET | — | special |
| 08/12/2026 | Mechanical Systems | 85 10 AVENUE | Gregory Benazzi | special |
| 08/12/2026 | Final | 85 10 AVENUE | Gregory Benazzi | progress |
| 08/12/2026 | HVAC-R and service water piping design and insulation | 85 10 AVENUE | Gregory Benazzi | energy_progress |
| 08/12/2026 | HVAC-R and service water heating equipment | 85 10 AVENUE | Gregory Benazzi | energy_progress |
| 08/12/2026 | HVAC-R and service water heating system controls | 85 10 AVENUE | Gregory Benazzi | energy_progress |
| 08/12/2026 | Maintenance information | 85 10 AVENUE | Gregory Benazzi | energy_progress |
| 08/05/2026 | Sprinkler Systems | 3321 PEARTREE AVENUE | Gregory Benazzi | special |
| 07/24/2026 | Heating Systems | 3321 PEARTREE AVENUE | Gregory Benazzi | special |
| 07/24/2026 | Mechanical Systems | 3321 PEARTREE AVENUE | Gregory Benazzi | special |
| 07/24/2026 | Final | 3321 PEARTREE AVENUE | Gregory Benazzi | progress |
| 07/24/2026 | HVAC-R and service water heating system controls | 3321 PEARTREE AVENUE | Gregory Benazzi | energy_progress |
| 07/24/2026 | HVAC-R and service water heating equipment | 3321 PEARTREE AVENUE | Gregory Benazzi | energy_progress |
| 07/24/2026 | Shutoff dampers | 3321 PEARTREE AVENUE | Gregory Benazzi | energy_progress |
| 07/24/2026 | HVAC-R and service water piping design and insulation | 3321 PEARTREE AVENUE | Gregory Benazzi | energy_progress |
| 07/17/2026 | Energy Code Compliance Inspections | 926 MADISON AVENUE | Gregory Benazzi | progress |
| 07/17/2026 | Final | 926 MADISON AVENUE | Gregory Benazzi | progress |
| 07/17/2026 | Fire-Resistance Rated Construction | 926 MADISON AVENUE | Gregory Benazzi | progress |
| 07/17/2026 | Fire-Resistant Penetrations and Joints | 926 MADISON AVENUE | Gregory Benazzi | special |
| 07/17/2026 | Post-installed Anchors | 926 MADISON AVENUE | Gregory Benazzi | special |
| 06/18/2026 | Final | 926 MADISON AVENUE | Gregory Benazzi | progress |
| 06/18/2026 | Energy Code Compliance Inspections | 926 MADISON AVENUE | Gregory Benazzi | progress |
| 06/18/2026 | Mechanical Systems | 926 MADISON AVENUE | Gregory Benazzi | special |
| 06/10/2026 | Lighting in dwelling units | 746A UNION STREET | Gregory Benazzi | energy_progress |
| 06/10/2026 | Fenestration and door U-factor and product ratings | 746A UNION STREET | Gregory Benazzi | energy_progress |
| 06/10/2026 | Energy Code Compliance Inspections | 746A UNION STREET | Gregory Benazzi | progress |
| 06/10/2026 | Structural Stability – Alterations of existing buildings | 746A UNION STREET | Gregory Benazzi | special |
| 06/10/2026 | Fire-Resistant Penetrations and Joints | 746A UNION STREET | Gregory Benazzi | special |
| 06/04/2026 | Sprinkler Systems | 3321 PEARTREE AVENUE | Gregory Benazzi | special |
| 06/02/2026 | Sprinkler Systems | 746A UNION STREET | Gregory Benazzi | special |
| 06/02/2026 | Energy Code Compliance Inspections | 746A UNION STREET | Gregory Benazzi | progress |
| 06/02/2026 | HVAC-R and service water heating equipment | 746A UNION STREET | Gregory Benazzi | energy_progress |
| 06/02/2026 | Maintenance information | 746A UNION STREET | Gregory Benazzi | energy_progress |
| 06/02/2026 | HVAC-R and service water piping design and insulation | 746A UNION STREET | Gregory Benazzi | energy_progress |
| 06/02/2026 | HVAC-R and service water heating system controls | 746A UNION STREET | Gregory Benazzi | energy_progress |
| 05/13/2026 | HVAC-R and service water heating equipment | 20 WEST 74 STREET | Gregory Benazzi | energy_progress |
| 05/13/2026 | Duct leakage testing, insulation and design | 20 WEST 74 STREET | Gregory Benazzi | energy_progress |
| 05/13/2026 | Maintenance information | 20 WEST 74 STREET | Gregory Benazzi | energy_progress |
| 05/13/2026 | Fire-Resistant Penetrations and Joints | 20 WEST 74 STREET | Gregory Benazzi | special |
| 05/05/2026 | Final | 20 WEST 74 STREET | Gregory Benazzi | progress |
| 05/05/2026 | Mechanical Systems | 20 WEST 74 STREET | Gregory Benazzi | special |
| 04/22/2026 | Energy Code Compliance Inspections | 4 EAST 98 STREET | James Armstrong | progress |
| 04/22/2026 | Fire-Resistance Rated Construction | 4 EAST 98 STREET | James Armstrong | progress |