← Back
BuildNYC
Other miscellaneous
1 OAK STREET
BROOKLYN · Greenpoint · BIN 3416853
💬 Discuss this project
1930Year Built
1Stories
Z9Building Class
R6Zoning
1,500 sfGross Floor Area
0Units
3 Active Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Other miscellaneous · Owner of record: 2 Noble North · 299,214 sf lot · 0.01 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSilo roof repair and steel installation1 filing · 4 docs
Site & exteriorAfroPunk Music Festival36p · 9 filings · 20 docs
Filed — no permit issuedConstruction fence requirements3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
57 West403/21/2026
TF Cornerstone103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/31/2024$144.1M—57 WEST LLC → 2 NOBLE NORTH LLC$96,067/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G. Blinn Consulting408/27/2025
Exdem Engineering Services306/11/2025
Paul Perdek, Prof. Engineering105/16/2025
Andrew Formichella108/21/2023
Urban Integrations108/14/2023
SYNC Architecture209/09/2022
NSC Architecture306/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NSC Architecture603/21/2026
Expedite Dem603/21/2026
Municipal Building Consultants303/21/2026
J.A.M. Associates1403/21/2026
A1 Expediting Service803/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Winick ProductionsGeneral Contractor403/21/2026
S&E Bridge & ScaffoldScaffold404/09/2026
Titan Industrial ServiceGeneral Contractor204/09/2026
Titan Industrial ServiceScaffold204/09/2026
Zev ElectricElectrical103/22/2026
LNM ConstructionScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Cole Technologies/Control1290408/27/2025
G. Blinn Consulting2894408/27/2025
Richard H. Balser Engineering3028109/06/2022
Building Lifecycle
All (86)Filed (15)Permit Issued (11)Signed Off (6)Violation (6)Objection (26)Special Inspection (19)Tax Incentive (3)
09/30/2031
485-x construction completed
10/01/2026
485-x construction commenced
03/06/2026
485-x registration filed
02/09/2026
Signed off — Alteration
TEMPORARY NEEDLE BEAM PLATFORM AS PER DRAWINGS DURING BLDG DEMOLITION, FILED SEP. NEEDLE BEAM PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. SUPPORTED SCAFFOLD FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01226457-I1
02/09/2026
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01225391-I1
12/04/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01214889-I1
12/03/2025
Signed off — Full Demolition
mechanical equipment will assist during demolition
B01199951-I1
10/16/2025
Permit issued — Full Demolition
B01199951-I1-FD
10/07/2025
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE ANDERSEN
10/07/2025
Special inspection requirement — Structural Steel - Details
GEORGE ANDERSEN
10/07/2025
Special inspection requirement — Post-installed Anchors
GREG BLINN
09/29/2025
Permit issued — Protection and Mechanical Methods
B01226457-I1-PMM
09/26/2025
Permit issued — Supported Scaffold
B01225391-I1-SF
09/17/2025
Objection resolved — Addressed
09/12/2025
Objection raised — Other
08/27/2025
Filed — Alteration
TEMPORARY NEEDLE BEAM PLATFORM AS PER DRAWINGS DURING BLDG DEMOLITION, FILED SEP. NEEDLE BEAM PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. SUPPORTED SCAFFOLD FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01226457-P1
08/27/2025
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01225391-P1
08/27/2025
Special inspection requirement — Post-installed Anchors
GREG BLINN
08/07/2025
Permit issued — Protection and Mechanical Methods
B01199951-S1-PMM
08/07/2025
Permit issued — Full Demolition
B01199951-I1-FD
07/17/2025
Permit issued — Construction Fence
B01214889-I1-FN
07/08/2025
Permit issued — Protection and Mechanical Methods
B01226457-I1-PMM
07/08/2025
Permit issued — Supported Scaffold
B01225391-I1-SF
06/26/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
GEORGE ANDERSEN
06/26/2025
Special inspection requirement — Demolition
GEORGE ANDERSEN
06/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/11/2025
Filed — Full Demolition
mechanical equipment will assist during demolition
B01199951-P1
06/10/2025
Special inspection requirement — Demolition
GEORGE ANDERSEN
06/10/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
GEORGE ANDERSEN
05/28/2025
Objection raised — Other
05/28/2025
Objection raised — Other
05/16/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01214889-I1
05/15/2025
Filed — Alteration
TEMPORARY NEEDLE BEAM PLATFORM AS PER DRAWINGS DURING BLDG DEMOLITION, FILED SEP. NEEDLE BEAM PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. SUPPORTED SCAFFOLD FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01226457-I1
05/15/2025
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01225391-I1
05/07/2025
Objection resolved — Addressed
04/14/2025
Objection resolved — Addressed
04/11/2025
Objection raised — Other
04/08/2025
Objection raised — Admin
03/28/2025
Filed — Full Demolition
mechanical equipment will assist during demolition
B01199951-S1
03/25/2025
Filed — Full Demolition
mechanical equipment will assist during demolition
B01199951-I1
01/15/2025
Violation issued (ECB, closed)
Construction
07/01/2024
Violation issued (ECB, closed)
Construction
07/01/2024
Violation issued (ECB, closed)
Construction
07/01/2024
Violation issued (ECB, closed)
Construction
04/11/2024
Signed off — Alteration
Installation of temp tents, platforms, scenic and prod. equip., no alt to exist structures for Afropunk. TPA required. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete.
B00917080-I1
10/11/2023
Violation issued (ECB, closed)
Construction
10/11/2023
Violation issued (ECB, closed)
Construction
08/21/2023
Filed — No Work
B00917089-I1
08/18/2023
Permit issued — General Construction
B00917080-I1-GC
08/14/2023
Filed — Alteration
Installation of temp tents, platforms, scenic and prod. equip., no alt to exist structures for Afropunk. TPA required. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete.
B00917080-I1
08/09/2023
Special inspection requirement — Final
DANNY TRUJILLO
12/27/2022
Signed off — Alteration
Temporary structures for a fashion show. Removed at the end of the programing. No changes to existing structures, use or egress.
B07998887-I1
12/21/2022
Objection raised — Inspections
12/21/2022
Objection resolved — Addressed
12/21/2022
Special inspection requirement — Energy Code Compliance Inspections
12/21/2022
Special inspection requirement — Masonry
12/21/2022
Special inspection requirement — Post-installed Anchors
12/21/2022
Special inspection requirement — Sprayed fire-resistant materials
12/21/2022
Special inspection requirement — Insulation placement and R values
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offTitan Industrial Service10/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold09/29/2025
DOB NOWSupported ScaffoldSigned-offS&E Bridge & Scaffold09/26/2025
DOB NOWProtection and Mechanical MethodsSigned-offTitan Industrial Service08/07/2025
DOB NOWFull DemolitionSigned-offTitan Industrial Service08/07/2025
DOB NOWConstruction FenceSigned-offTitan Industrial Service07/17/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold07/08/2025
DOB NOWSupported ScaffoldSigned-offS&E Bridge & Scaffold07/08/2025
DOB NOWGeneral ConstructionSigned-offWinick Productions08/18/2023
DOB NOWStructuralSigned-offWinick Productions09/13/2022
DOB NOWConstruction FencePermit IssuedLNM Construction09/20/2019
3 projects · most recent 07/08/2025
General Wiring
FiledStatusContractorScope
07/08/2025CompleteS. J. Electric—
06/07/2024CompleteZev Electric—
05/22/2024Permit IssuedZev ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
10/07/2025Structural Steel - High Strength BoltingGEORGE ANDERSENspecial
10/07/2025Structural Steel - DetailsGEORGE ANDERSENspecial
10/07/2025Post-installed AnchorsGREG BLINNspecial
08/27/2025Post-installed AnchorsGREG BLINNspecial
06/26/2025Structural Stability – Alterations of existing BuildingsGEORGE ANDERSENspecial
06/26/2025DemolitionGEORGE ANDERSENspecial
06/10/2025DemolitionGEORGE ANDERSENspecial
06/10/2025Structural Stability – Alterations of existing BuildingsGEORGE ANDERSENspecial
08/09/2023FinalDANNY TRUJILLOprogress
12/21/2022Energy Code Compliance Inspections—progress
12/21/2022Masonry—special
12/21/2022Post-installed Anchors—special
12/21/2022Sprayed fire-resistant materials—special
12/21/2022Insulation placement and R values—energy_progress
12/21/2022Structural Stability – Alterations of existing buildings—special
09/06/2022FinalANDY ENGLER ROTHprogress
09/06/2022Structural Steel - DetailsBalser Richardspecial
06/20/2022Concrete - Cast-In-Place—special
06/20/2022Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AfroPunk Music FestivalEvents & gatherings—
Project B00917080 Alteration · LOC Issued · 08/14/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch11
08/28/2026B07998887-I1Request digital key ↗
08/27/2026B00917080-I1Request digital key ↗
08/22/2026B01199951-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00223272-I1Request digital key ↗
09/02/2026B00229969-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
08/28/2026B07998709-I1Request digital key ↗
08/27/2026B00917089-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
12/12/2022340873923Open ↗
12/19/2018322065251Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/29/2026B00760868-I1Open ↗
08/28/2026B07998887-I1Open ↗
08/28/2026B07998709-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/30/2026B01199951-I1Open ↗
08/30/2026B01199951-I1Open ↗
08/27/2026B07998887-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B07998887-I1Open ↗
08/24/2026B00917080-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/12/2022340873923Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/12/2022340873923Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/19/2018322065251Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/19/2018322065251Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01199951-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01199951-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01199951-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01199951-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026B01199951-P1Open ↗
08/15/2026B01199951-I1Open ↗
08/14/2026B00760868-I1Open ↗
▸DOB NOWOER: Notice to Proceed2
08/13/2026B00229969-I1Open ↗
08/13/2026B00223272-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
12/12/2022340873923Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/12/2022340873923Open ↗
▸DOB NOWRodent Control1
08/13/2026B01199951-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/12/2022340873923Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/19/2018322065251Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/30/2019322065251Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/12/2022340873923Open ↗
12/19/2018322065251Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET1
12/19/2018322065251Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/12/2022340873923Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B01199951-I1Open ↗
▸Other Documents7
▸DOB NOWStructure Photographs2
08/13/2026B01199951-P1Open ↗
08/13/2026B01199951-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026B01199951-P1Open ↗
08/15/2026B01199951-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01199951-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026B00760868-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01199951-I1Open ↗