| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01003416 ↗ | 152 WEST 36 STREET MANHATTAN | Alteration | Permit Issued | 02/28/2024 | 09/29/2026 | Design EXDEM ENGINEERING SERVICES Owner MEQUITY COMPANIES | REMOVAL OF STRUCTURAL ELEMENTS AND ADDITION OF CONCRETE REINFORCEMENT OF STRUCTURAL FRAMING PER PLANS. Application filed in conjunction with… |
| M01177085 ↗ | 859 7 AVENUE MANHATTAN | Full Demolition | Permit Issued | 02/14/2025 | 09/24/2026 | Design ANCORA ENGINEERING, PLLC Owner EXTELL DEVELOPMENT Filer EXPEDITE DEM INC | mechanical equipment to assist with demolition and chute will be built to lower debris |
| M00672872 ↗ | 255 EAST 39 STREET MANHATTAN | New Building | Permit Issued | 02/16/2022 | 09/23/2026 | Design CETRARUDDY ARCHITECTURE DPC Owner 355 REALTY COMPANY Filer DVA Advisors | Temporary Standpipe work as shown on plans filed herewith. |
| M01004546 ↗ | 3 EAST 54 STREET MANHATTAN | Full Demolition | Permit Issued | 05/14/2024 | 09/23/2026 | Design ANCORA ENGINEERING, PLLC Filer EXPEDITE DEM INC | Use of mechanical means to assist with full demolition, in accordance with approved demolition plans |
| M01177081 ↗ | 859 7 AVENUE MANHATTAN | Full Demolition | Permit Issued | 02/14/2025 | 09/23/2026 | Design ANCORA ENGINEERING, PLLC Owner EXTELL DEVELOPMENT Filer EXPEDITE DEM INC | mechanical equipment to assist with demolition & chute will be built to lower debris |
| M01177096 ↗ | 859 7 AVENUE MANHATTAN | Full Demolition | Permit Issued | 02/14/2025 | 09/23/2026 | Design ANCORA ENGINEERING, PLLC Owner EXTELL DEVELOPMENT Filer EXPEDITE DEM INC | mechanical equipment to assist with demolition & chute will be built to lower debris |
| Name | Projects together | Most recent |
|---|---|---|
| PAUL PERDEK, PROF. ENG. PLLC | 73 | 01/28/2026 |
| HOWARD I SHAPIRO & ASSOCIATES | 59 | 05/19/2026 |
| EXDEM ENGINEERING SERVICES | 36 | 09/09/2026 |
| ANCORA ENGINEERING, PLLC | 33 | 07/17/2026 |
| BAILEYS ENGINEERING PC | 13 | 07/19/2019 |
| ECC INC | 10 | 10/02/2024 |
| THORNTON TOMASETTI | 7 | 09/09/2026 |
| MOODY-NOLAN ARCHITECTURE | 5 | 09/09/2026 |
| MDEAS ARCHITECTS | 4 | 11/04/2021 |
| ACHESON DOYLE PARTNERS ARCHITECTS | 3 | 01/20/2021 |
| CETRARUDDY ARCHITECTURE DPC | 3 | 07/16/2026 |
| DESIMONE CONSULTING ENGINEERS | 3 | 06/02/2026 |
| GILSANZ MURRAY STEFICEK LLP | 3 | 12/11/2024 |
| LANGAN ENGINEERING | 3 | 07/22/2026 |
| WSP | 3 | 06/18/2026 |
| AKF ENGINEERS, LLP | 2 | 07/16/2026 |
| DOOLING & COMPANY ARCHITECTS | 2 | 09/19/2019 |
| JAROS BAUM & BOLLES | 2 | 05/19/2026 |
| JLS DESIGNS | 2 | 11/28/2018 |
| KZ ENGINEERING, P.C | 2 | 04/21/2023 |
| ME ENGINEERS | 2 | 06/02/2026 |
| RA DESIGN ENGINEERING, PLLC | 2 | 05/29/2026 |
| SCALAR ARCHITECTURE PC | 2 | 04/24/2020 |
| SHERWOOD DESIGN ENGINEERS | 2 | 03/13/2026 |
| SOUTH BAY ENGINEERING PLLC | 2 | 09/25/2018 |
| Name | Projects together | Most recent |
|---|---|---|
| TURNER CONSTRUCTION COMPA | 7 | 09/09/2026 |
| PAVARINI MCGOVERN LLC | 4 | 05/19/2026 |
| SKY CONSTRUCTION NY INC | 4 | 07/24/2025 |
| ALBA SERVICES INC | 3 | 04/06/2026 |
| ALLSTATE INTERIOR NJ CORP | 3 | 02/07/2023 |
| LEEDING BUILDERS GROUP LL | 3 | 07/16/2026 |
| H M SPRINKLER INC | 2 | 07/16/2026 |
| JRM CONSTRUCTION MGMT LLC | 2 | 08/12/2025 |
| TISHMAN CONSTRUCTION CORP | 2 | 04/06/2026 |
| 1 RELIABLE SERVICE INC | 1 | — |
| 4 STAR CONTRACTING INC | 1 | — |
| A S M CONSTRUCTION OF NY | 1 | — |
| A&A BUILDING CONSULTANTS | 1 | — |
| A-1 UNDERGRND PLMBNG CON | 1 | 04/20/2023 |
| A.N.C. CONTRACTING CO.,IN | 1 | — |
| AB BUILDERS NY | 1 | — |
| ACER CONSTRUCTION INC | 1 | — |
| ADI AL CONSTRUCTION INC | 1 | — |
| ADVANCED P,MECH & SPR COR | 1 | 02/10/2023 |
| AK GENERAL CONTRACTOR COR | 1 | — |
| ALEF CONSTRUCTION INC | 1 | — |
| ALL STATE 12 GENERAL CONT | 1 | — |
| ANDR SERVICES GROUP | 1 | — |
| ANNMARIE KHAN & ANDRE KHA | 1 | — |
| ARBERIA CONSTRUCTION INC | 1 | — |
| Name | Projects together | Most recent |
|---|---|---|
| EXTELL DEVELOPMENT | 24 | 07/14/2026 |
| REDSKY MANAGEMENT | 12 | 11/11/2020 |
| ROCKLYN ASSET CORP | 7 | 02/27/2026 |
| TITAN INDUSTRIAL SERVICES CORP. | 7 | 02/03/2022 |
| 509 W 34, L.L.C. | 5 | 01/10/2023 |
| 7 HANOVER FEE OWNER CO LLC | 5 | 07/16/2026 |
| FEIL - BLS LLC | 5 | 03/17/2022 |
| NEW YORK UNIVERSITY | 5 | 09/30/2025 |
| 309 E 94TH ST PROPERTY OWNER LLC | 4 | 05/09/2023 |
| BOSTON PROPERTIES | 4 | 05/24/2021 |
| TISHMAN SPEYER | 4 | 04/03/2025 |
| VORNADO REALTY TRUST | 4 | 07/17/2026 |
| BROADWALL MANAGEMENT | 3 | 12/09/2021 |
| EAST END CAPITAL LLC | 3 | 05/08/2023 |
| LINCOLN CENTER FOR THE PERFORMING A | 3 | 09/09/2026 |
| NYC SCHOOL CONSTRUCTION | 3 | 07/15/2026 |
| TURNBRIDGE EQUITIES | 3 | 03/19/2021 |
| BARNARD COLLEGE - COLUMBIA UNIVERSI | 2 | 05/19/2026 |
| ERIE BASIN MARINE ASSOCIATES | 2 | 05/29/2026 |
| MRP REALTY SERVICES, LLC | 2 | 09/22/2022 |
| NORTHEASTERN CONFERENCE CORPORATION | 2 | 02/19/2025 |
| ROLEX REALTY COMPANY, LLC | 2 | 04/19/2022 |
| SKY EQUITY GROUP LLC | 2 | 07/24/2025 |
| 28-90 REVIEW AVE PROPERTY OWNER | 1 | 06/02/2026 |
| 34-20 JUNCTION DM LLC | 1 | 02/05/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| AE DESIGN SOLUTION INC. | 45 | 01/20/2026 |
| EXPEDITE DEM INC | 40 | 07/24/2026 |
| HOWARD I. SHAPIRO & ASSOCIATES | 38 | 05/19/2026 |
| A1 EXPEDITING SERVICE CORP. | 14 | 09/09/2026 |
| WILLIAM VITACCO ASSOCIATES | 9 | 07/16/2026 |
| DOMANI CONSULTING | 8 | 06/20/2025 |
| ECC, INC | 4 | 10/02/2024 |
| CHRISTOPHER COMPTON ARCHITECT | 3 | 12/10/2021 |
| METROPOLIS GROUP INC | 3 | 12/11/2024 |
| DVA Advisors | 2 | 06/18/2026 |
| RIZZO GROUP | 2 | 04/29/2025 |
| 101 SERVICES INC | 1 | 09/30/2024 |
| ARCHETYPE CONSULTANTS, INC. | 1 | 01/21/2025 |
| BOHLER ENGINEERING | 1 | 09/03/2024 |
| CONSTRUCTION LAB LLC | 1 | 05/18/2023 |
| CONVERSANO ASSOCIATES, INC. | 1 | 07/22/2026 |
| CORE CONSULTANTS NYC | 1 | 07/24/2026 |
| GEORGE E. BERGER & ASS. LLC | 1 | 08/12/2025 |
| JAM CONSULTANTS, INC. | 1 | 04/30/2026 |
| NYC SCHOOL CONSTRUCTION AUTHORITY | 1 | 07/15/2026 |
| TITAN INDUSTRIAL SERVICES CORP. | 1 | 04/30/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01003416 ↗ | 152 WEST 36 STREET MANHATTAN | Alteration | Permit Issued | 02/28/2024 | 09/29/2026 | Design EXDEM ENGINEERING SERVICES Owner MEQUITY COMPANIES | REMOVAL OF STRUCTURAL ELEMENTS AND ADDITION OF CONCRETE REINFORCEMENT OF STRUCTURAL FRAMING PER PLANS. Application filed in conjunction with… |
| M01177085 ↗ | 859 7 AVENUE MANHATTAN | Full Demolition | Permit Issued | 02/14/2025 | 09/24/2026 | Design ANCORA ENGINEERING, PLLC Owner EXTELL DEVELOPMENT Filer EXPEDITE DEM INC | mechanical equipment to assist with demolition and chute will be built to lower debris |
| M00672872 ↗ | 255 EAST 39 STREET MANHATTAN | New Building | Permit Issued | 02/16/2022 | 09/23/2026 | Design CETRARUDDY ARCHITECTURE DPC Owner 355 REALTY COMPANY Filer DVA Advisors | Temporary Standpipe work as shown on plans filed herewith. |
| M01004546 ↗ | 3 EAST 54 STREET MANHATTAN | Full Demolition | Permit Issued | 05/14/2024 | 09/23/2026 | Design ANCORA ENGINEERING, PLLC Filer EXPEDITE DEM INC | Use of mechanical means to assist with full demolition, in accordance with approved demolition plans |
| M01177081 ↗ | 859 7 AVENUE MANHATTAN | Full Demolition | Permit Issued | 02/14/2025 | 09/23/2026 | Design ANCORA ENGINEERING, PLLC Owner EXTELL DEVELOPMENT Filer EXPEDITE DEM INC | mechanical equipment to assist with demolition & chute will be built to lower debris |
| M01177096 ↗ | 859 7 AVENUE MANHATTAN | Full Demolition | Permit Issued | 02/14/2025 | 09/23/2026 | Design ANCORA ENGINEERING, PLLC Owner EXTELL DEVELOPMENT Filer EXPEDITE DEM INC | mechanical equipment to assist with demolition & chute will be built to lower debris |
| M01440876 ↗ | 162 WEST 56 STREET MANHATTAN | — | Permit Issued | — | 09/22/2026 | Design ANCORA ENGINEERING, PLLC Owner ALLIED PARTNERS | Install new exterior 2-hour fire-rated CFS shaft wall with gypsum sheathing, firestopping, flashing, and Sto Powerwall finish along exposed … |
| M01402847 ↗ | 2411 FREDRICK DOUGLASS BL MANHATTAN | Alteration | Permit Issued | 05/27/2026 | 09/18/2026 | Design NEBULA ARCHITECTURE PLLC Owner L+M FUND MANAGEMENT LLC | PROPOSED NEW DEDICATED GAS LINE FROM EXISTING ELECTRICAL ROOM TO EXISTING GAS DRYERS IN EXISTING LAUNDRY ROOM. |
| Permit is no | 63 WALL STREET MANHATTAN | — | Permit Issued | — | 09/08/2026 | — | USE OF MECHANICAL DEMOLITION EQUIPMENT DURING FULL DEMOLITION, FILED SEPARATELY UNDER B01274278-I1. |
| M01289549 ↗ | 1000 5 AVENUE MANHATTAN | Alteration | Permit Issued | 11/05/2025 | 08/26/2026 | Design BEYER BLINDER BELLE | Use of mechanical demolition equipment during partial demolition, filed separately under M01289549-I1. |
| M01094125 ↗ | 222 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/26/2024 | 08/24/2026 | Design EXDEM ENGINEERING SERVICES | Structural demolition including slab openings, mechanical bulkhead, and cooling tower enclosure |
| B01226020 ↗ | 215 MOORE STREET BROOKLYN | Full Demolition | Signed-off | 05/15/2025 | 07/24/2026 | Design ANCORA ENGINEERING, PLLC Filer EXPEDITE DEM INC | mechanical means to assist with full demolition |
| B00975345 ↗ | 376 FULTON STREET BROOKLYN | Alteration | Permit Issued | 01/17/2024 | 07/14/2026 | Owner SKY EQUITY GROUP LLC | Temporary bracing and partial demolition of 5 story building, as per plans filed herewith. This application is filed in conjunction with DOB… |
| M00930717 ↗ | 125 COLUMBUS AVENUE MANHATTAN | Alteration CO | Permit Issued | 10/19/2023 | 06/30/2026 | Filer METROPOLIS GROUP INC | USE OF MECHANICAL EQUIPMENT DURING PARTIAL DEMO, FILED SEPARATELY UNDER M00930717-Z1. |
| M01299104 ↗ | 60 LINCOLN CENTER PLAZA MANHATTAN | Alteration | Permit Issued | 02/13/2026 | 06/26/2026 | Design EXDEM ENGINEERING SERVICES | Use of mechanical demolition equipment during partial demolition, filed separately under M01299104-S3. |
| M01395257 ↗ | 3 EAST 54 STREET MANHATTAN | Alteration | Permit Issued | 05/12/2026 | 06/23/2026 | Design ANCORA ENGINEERING, PLLC Owner VORNADO REALTY TRUST | PLANS PRESENT SCOPE AND MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION OF THE FLOOR SLABS IN CONJUNCTION WITH RELATED FULL DEMOLITION… |
| B00992277 ↗ | 380 FULTON STREET BROOKLYN | Full Demolition | Signed-off | 02/12/2024 | 06/22/2026 | Mechanical Equipment Use in conjunction with demolition filed under B00992277-I1, as per plans filed herewith. | |
| M01358208 ↗ | 30 WEST 67 STREET MANHATTAN | Alteration | Permit Issued | 03/18/2026 | 06/18/2026 | Design EXDEM ENGINEERING SERVICES | REMOVAL OF ROOFTOP EQUIPMENT FOR 14-STORY COMMERCIAL BUILDING |
| B01297110 ↗ | 2968 OCEAN PARKWAY BROOKLYN | Full Demolition | Signed-off | 10/14/2025 | 06/11/2026 | Design EXDEM ENGINEERING SERVICES Owner ROCKLYN ASSET CORP Filer EXPEDITE DEM INC | mechanical equipment to assist with demolition of structure |
| M01269321 ↗ | 550 WEST 37 STREET MANHATTAN | Full Demolition | Signed-off | 08/14/2025 | 06/10/2026 | Design AGE ENGINEERING, LLC Filer EXPEDITE DEM INC | MECHANICAL EQUIPMENT USE |
| Q01387838 ↗ | 130-17 23 AVENUE QUEENS | Full Demolition | Signed-off | 04/17/2026 | 06/05/2026 | Design EXDEM ENGINEERING SERVICES Filer EXPEDITE DEM INC | mechanical means to assist with DOB EWO for fire damaged structure |
| B00802390 ↗ | 376 FULTON STREET BROOKLYN | Alteration | Permit Issued | 01/10/2023 | 06/03/2026 | Design PAUL PERDEK, PROF. ENG. PLLC | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00802405 ↗ | 380 FULTON STREET BROOKLYN | Alteration | Permit Issued | 01/06/2023 | 06/03/2026 | Design PAUL PERDEK, PROF. ENG. PLLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01298558 ↗ | 2900 OCEAN PARKWAY BROOKLYN | Full Demolition | Signed-off | 10/14/2025 | 05/29/2026 | Design EXDEM ENGINEERING SERVICES Owner ROCKLYN ASSET CORP Filer EXPEDITE DEM INC | mechanical to assist on grade |
| Q01305345 ↗ | 126-02 NORTHERN BL SR SOUTH QUEENS | Full Demolition | Signed-off | 12/11/2025 | 05/28/2026 | Design EXDEM ENGINEERING SERVICES Filer EXPEDITE DEM INC | mechanical equipment will be used to assist with full demolition of structure. |
| M01393500 ↗ | 3 EAST 54 STREET MANHATTAN | Alteration | Signed-off | 05/01/2026 | 05/26/2026 | Design ANCORA ENGINEERING, PLLC Owner VORNADO REALTY TRUST | PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUCTION WITH RELATED FULL DEMOLITION M01004546 TO REMOVE AWNINGS T… |
| M01253842 ↗ | 47 WEST 66 STREET MANHATTAN | Alteration | Permit Issued | 07/18/2025 | 05/22/2026 | Design STEPHEN B JACOBS GROUP Owner EXTELL DEVELOPMENT | facade infill closure |
| Q01305596 ↗ | 126-16 NORTHERN BL SR SOUTH QUEENS | Full Demolition | Signed-off | 12/11/2025 | 05/22/2026 | Design EXDEM ENGINEERING SERVICES Filer EXPEDITE DEM INC | mechanical means will be used to assist with full demolition |
| Q01305629 ↗ | 126-16 NORTHERN BL SR SOUTH QUEENS | Full Demolition | Signed-off | 12/11/2025 | 05/22/2026 | Design EXDEM ENGINEERING SERVICES Filer EXPEDITE DEM INC | mechanical means will be used to demolish structure |
| Q01305624 ↗ | 126-16 NORTHERN BL SR SOUTH QUEENS | Full Demolition | Signed-off | 12/11/2025 | 05/21/2026 | Design EXDEM ENGINEERING SERVICES Filer EXPEDITE DEM INC | mechanical means will be used to assist demolition |
| Q01305570 ↗ | 126-12 NORTHERN BOULEVARD QUEENS | Full Demolition | Signed-off | 12/11/2025 | 05/20/2026 | Design EXDEM ENGINEERING SERVICES | mechanical equipment to assist with demolition |
| Q01305647 ↗ | 126-17 34 AVENUE QUEENS | Full Demolition | Signed-off | 12/11/2025 | 05/19/2026 | Design EXDEM ENGINEERING SERVICES Filer EXPEDITE DEM INC | mechanical means will assist with demolition of structure |
| Q01305650 ↗ | 126-17 34 AVENUE QUEENS | Full Demolition | Signed-off | 12/11/2025 | 05/19/2026 | Design EXDEM ENGINEERING SERVICES Filer EXPEDITE DEM INC | mechanical equipment will be used to assist with full demolition |
| Q01305655 ↗ | 126-19 34 AVENUE QUEENS | Full Demolition | Signed-off | 12/11/2025 | 05/19/2026 | Design EXDEM ENGINEERING SERVICES Filer EXPEDITE DEM INC | mechanical equipment will be used to assist with demolition |
| M01299346 ↗ | 60 COLUMBUS AVENUE MANHATTAN | Alteration | Permit Issued | 01/16/2026 | 05/14/2026 | Design EXDEM ENGINEERING SERVICES | Partial Demo means & methods (plaza level only) for removal of Guggenheim Bandshell as per plans. |
| M01349551 ↗ | 60 LINCOLN CENTER PLAZA MANHATTAN | Alteration | Permit Issued | 02/13/2026 | 05/14/2026 | Design EXDEM ENGINEERING SERVICES | Partial Demo means & methods for interior demo and slab cut (plaza level only) as per plans. |
| M00422026 ↗ | 405 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 12/10/2021 | 05/13/2026 | Design KZ ENGINEERING, P.C Owner EXTELL DEVELOPMENT | Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| M01357468 ↗ | 380 11 AVENUE MANHATTAN | Alteration | Permit Issued | 03/03/2026 | 04/30/2026 | Design EXDEM ENGINEERING SERVICES Owner Milbank, LLP Filer JAM CONSULTANTS, INC. | USE OF MECHANICAL DEMOLITION EQUIPMENT FOR SLAB OPENING, FILED SEPARATELY UNDER M01357468-I1. |
| B01362296 ↗ | 790 COLUMBIA STREET BROOKLYN | Alteration | Permit Issued | 02/24/2026 | 04/28/2026 | Design RA DESIGN ENGINEERING, PLLC | PARTIAL DEMOLITION OF FIRE DAMAGE AREA, ALL WORK TO BE PERFORMED UNDER DOB EMERGENCY WORK ORDER (EWO) NUMBER: 012826FEU30601KR. DEMOLITION W… |
| M01180462 ↗ | 47 WEST 66 STREET MANHATTAN | Full Demolition | Permit Issued | 02/24/2025 | 04/20/2026 | Design EXDEM ENGINEERING SERVICES Filer EXPEDITE DEM INC | mechanical equipment will be placed on floors and chute will be used to lower debris from floor to floor |
| Q00953991 ↗ | 34-20 JUNCTION BOULEVARD QUEENS | Alteration | Signed-off | 10/30/2023 | 04/17/2026 | Design PAUL PERDEK, PROF. ENG. PLLC Owner 34-20 JUNCTION DM LLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01094041 ↗ | 222 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/27/2024 | 04/08/2026 | Design AKF ENGINEERS, LLP | Interior demolition including removal of all non-structural interior partitions, furring and finishes. |
| Q00763375 ↗ | 28-90 REVIEW AVENUE QUEENS | New Building | Permit Issued | 07/15/2022 | 04/03/2026 | Design KSS ARCHITECTS LLP | The proposed project is a new industrial use high-rise building located at 28 90 Review Avenue The overall building will be five stories… |
| M01299014 ↗ | 60 COLUMBUS AVENUE MANHATTAN | Alteration | Permit Issued | 11/04/2025 | 03/26/2026 | Design LEGACY ENGINEERS | Use of Mechanical demolition equipment during partial demolition, filed separately under M01299014-S5. |
| M01285061 ↗ | 47 WEST 66 STREET MANHATTAN | Alteration | Permit Issued | 12/19/2025 | 03/25/2026 | Design EXDEM ENGINEERING SERVICES | THESE PLANS ARE FILED TO REMOVE THE DECOMMISONNED DUCTWORK EXISTING AT THE ROOF 24 W 67TH STREET. |
| M01327509 ↗ | 460 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 12/17/2025 | 03/25/2026 | Design EXDEM ENGINEERING SERVICES | Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Su… |
| B00985468 ↗ | 5361 PRESTON COURT BROOKLYN | Alteration CO | Permit Issued | 05/20/2024 | 03/16/2026 | Design STUDIO V ARCHITECTURE,PLLC Owner MET COUNCIL | Structural work in conjunction with Alt-CO |
| M01314553 ↗ | 60 LINCOLN CENTER PLAZA MANHATTAN | Alteration | Permit Issued | 12/04/2025 | 03/16/2026 | Design SHERWOOD DESIGN ENGINEERS | Use of mechanical demolition equipment during Phase 1 Damrosch Park alteration, filed separately under M01314553. |
| M01346293 ↗ | 60 COLUMBUS AVENUE MANHATTAN | Alteration | Permit Issued | 01/26/2026 | 03/04/2026 | Design MOODY-NOLAN ARCHITECTURE | Use of mechanical demolition equipment during Phase 1 Damrosch Park alteration, filed separately under M01346293. |
| M00898377 ↗ | 3009 BROADWAY MANHATTAN | Alteration CO | Permit Issued | 09/01/2023 | 02/25/2026 | Design PERKINS&WILL ARCHITECTS, PC | Renovation of Altschul consisting of MEP Vertical Addition (Steel) and New Horizontal addition (Concrete) |
| M00329228 ↗ | 59 LEONARD STREET MANHATTAN | Alteration | Permit Issued | 02/03/2022 | 02/17/2026 | Design WSP Owner Cannon Hill Capiital LLC Filer JM ZONING, LLC. | STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. |
| M01348233 ↗ | 500 WEST 14 STREET MANHATTAN | Alteration | Permit Issued | 01/28/2026 | 01/29/2026 | Design PAUL PERDEK, PROF. ENG. PLLC | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01348217 ↗ | 859 7 AVENUE MANHATTAN | Alteration | Permit Issued | 01/20/2026 | 01/26/2026 | Design PAUL PERDEK, PROF. ENG. PLLC Owner EXTELL DEVELOPMENT Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01180602 ↗ | 30 WEST 67 STREET MANHATTAN | Full Demolition | Permit Issued | 10/14/2025 | 01/12/2026 | Design EXDEM ENGINEERING SERVICES Filer EXPEDITE DEM INC | ENGINEERED ENCLOSURE SYSTEM TO BE INSTALLED OVER THE SCAFFOLD AT THE WORKING LEVELS TO ALLOW MECHANICAL DEMOLITION. THIS ENCLOSURE PROVIDED … |
| M01250897 ↗ | 30 WEST 67 STREET MANHATTAN | Alteration | Signed-off | 07/15/2025 | 12/29/2025 | Design EXDEM ENGINEERING SERVICES Owner EXTELL DEVELOPMENT | Temporary weatherproof walls to support demo of 47 west 66th |
| B00802238 ↗ | 372 FULTON STREET BROOKLYN | Alteration | Permit Issued | 03/21/2024 | 11/28/2025 | Owner SKY EQUITY GROUP LLC | INSTALLATION OF TEMPORARY BRACING MEASURES (WALL TIES & STRONGBACKS) TO MAINTAIN LATERAL STABILITY OF THE LANDMARK BUILDING AT 372 FULTON ST… |
| X01320432 ↗ | 633 CASANOVA STREET BRONX | Alteration | Permit Issued | 11/18/2025 | 11/18/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X01320440 ↗ | 635 CASANOVA STREET BRONX | Alteration | Permit Issued | 11/18/2025 | 11/18/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X01320443 ↗ | 637 CASANOVA STREET BRONX | Alteration | Permit Issued | 11/18/2025 | 11/18/2025 | — | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X01320447 ↗ | 641 CASANOVA STREET BRONX | Alteration | Permit Issued | 11/18/2025 | 11/18/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01309256 ↗ | 2900 OCEAN PARKWAY BROOKLYN | Alteration | Permit Issued | 10/28/2025 | 11/05/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Owner ROCKLYN ASSET CORP Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01309255 ↗ | 2968 OCEAN PARKWAY BROOKLYN | Alteration | Permit Issued | 10/28/2025 | 10/29/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Owner ROCKLYN ASSET CORP Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01199951 ↗ | 43 WEST STREET BROOKLYN | Full Demolition | Signed-off | 03/25/2025 | 10/16/2025 | Design EXDEM ENGINEERING SERVICES Filer EXPEDITE DEM INC | mechanical equipment will assist during demolition |
| M01233057 ↗ | 47 WEST 66 STREET MANHATTAN | Alteration | Permit Issued | 06/11/2025 | 10/14/2025 | Design EXDEM ENGINEERING SERVICES | Partial demolition of facade on floors Lobby thru 11th Floor and slab demo on Lobby Level as required for construction hoist. This work is f… |
| M01232903 ↗ | 47 WEST 66 STREET MANHATTAN | Alteration | Signed-off | 06/11/2025 | 09/30/2025 | Design EXDEM ENGINEERING SERVICES | Window Removal filed in conjunction with Full Building Demolition Application #M01180462-I1 |
| B01093159 ↗ | 142 PIERREPONT STREET BROOKLYN | Alteration | Signed-off | 08/14/2024 | 09/24/2025 | Design EXDEM ENGINEERING SERVICES | INSTALLATION OF TEMPORARY DEBRIS CHUTE AND USE OF MECHANICAL DEMOLITION EQUIPMENT AS PER PLANS. THIS EQUIPMENT IS FOR USE DURING ALTERATION,… |
| M01250037 ↗ | 859 7 AVENUE MANHATTAN | Alteration | Permit Issued | 09/09/2025 | 09/12/2025 | Design ANCORA ENGINEERING, PLLC Owner EXTELL DEVELOPMENT Filer EXPEDITE DEM INC | PLANS PRESENT SCOPE AND MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION OF THE 1 STORY STRUCTURE IN CONJUNCTION WITH RELATED FULL DEMO… |
| B01226133 ↗ | 215 MOORE STREET BROOKLYN | Full Demolition | Signed-off | 05/15/2025 | 08/25/2025 | Design ANCORA ENGINEERING, PLLC Filer EXPEDITE DEM INC | mechanical equipment will assist on grade with demolition |
| Q01242104 ↗ | 62-67 61 STREET QUEENS | Full Demolition | Signed-off | 07/01/2025 | 08/21/2025 | Design EXDEM ENGINEERING SERVICES Owner ROCKLYN ASSET CORP Filer EXPEDITE DEM INC | mechanical means to assist with demolition |
| M01250025 ↗ | 859 7 AVENUE MANHATTAN | Alteration | Permit Issued | 08/11/2025 | 08/12/2025 | Design ANCORA ENGINEERING, PLLC Owner EXTELL DEVELOPMENT Filer EXPEDITE DEM INC | PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OP… |
| M01250009 ↗ | 859 7 AVENUE MANHATTAN | Alteration | Permit Issued | 08/06/2025 | 08/11/2025 | Design ANCORA ENGINEERING, PLLC Owner EXTELL DEVELOPMENT Filer EXPEDITE DEM INC | PLANS PRESENT SCOPE AND MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION, FOR REMOVAL OF 1 STORY STRUCTURE IN CONJUNCTION WITH RELATED … |
| B00990069 ↗ | 315 JAY STREET BROOKLYN | Full Demolition | Signed-off | 03/08/2024 | 07/30/2025 | Owner NEW YORK UNIVERSITY Filer EXPEDITE DEM INC | mechanical means will be used in accordance with full demolition approved plans |
| M00925043 ↗ | 1 LIBERTY PLAZA MANHATTAN | Alteration | Signed-off | 07/05/2024 | 07/22/2025 | Structural work as shown on plans | |
| B01214889 ↗ | 43 WEST STREET BROOKLYN | Alteration | Signed-off | 05/16/2025 | 07/17/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01065019 ↗ | 125 COLUMBUS AVENUE MANHATTAN | Alteration | Permit Issued | 06/12/2024 | 07/11/2025 | USE OF MECHANICAL EQUIPMENT FOR USE DURING INTERIOR DEMOLITION, FILED SEPARATELY UNDER M01065019-I1. THIS APPLICATION IS FILED IN CONJUNCTIO… | |
| B01229582 ↗ | 215 MOORE STREET BROOKLYN | Alteration | Permit Issued | 06/03/2025 | 07/03/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01230767 ↗ | 1992 BROADWAY MANHATTAN | Alteration | Signed-off | 06/10/2025 | 06/26/2025 | Design ANCORA ENGINEERING, PLLC Filer DOMANI CONSULTING | INTERIOR ALTERATION OF THE RETAIL SPACE LOCATED ON THE FIRST FLOOR AT 174 COLUMBUS AVE AKA 1980 BROADWAY. |
| B01229587 ↗ | 215 MOORE STREET BROOKLYN | Alteration | Signed-off | 06/03/2025 | 06/24/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01235027 ↗ | 47 WEST 66 STREET MANHATTAN | Alteration | Signed-off | 06/19/2025 | 06/24/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00576230 ↗ | 43-40 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 09/07/2021 | 06/23/2025 | Design BOHLER ENGINEERING NY PLLC Owner ARGONAUT HOLDINGS, LLC Filer BOHLER ENGINEERING | Hereby filing for a temporary construction fence application as per plans filed herewith. No change in use, egress, or occupancy. |
| B01182924 ↗ | 198 CONOVER STREET BROOKLYN | Full Demolition | Signed-off | 02/28/2025 | 06/11/2025 | Design ANCORA ENGINEERING, PLLC Filer EXPEDITE DEM INC | mechanical means will assist on grade |
| B01182951 ↗ | 200 CONOVER STREET BROOKLYN | Full Demolition | Signed-off | 02/28/2025 | 06/11/2025 | Design ANCORA ENGINEERING, PLLC Filer EXPEDITE DEM INC | mechanical means to assist with demolition on grade/slab |
| B01176956 ↗ | 215 MOORE STREET BROOKLYN | Full Demolition | Signed-off | 02/06/2025 | 06/10/2025 | Design ANCORA ENGINEERING, PLLC Filer EXPEDITE DEM INC | mechanical equipment to assist with demolition |
| B01221417 ↗ | 215 MOORE STREET BROOKLYN | Alteration | Signed-off | 05/08/2025 | 05/23/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01223421 ↗ | 200 CONOVER STREET BROOKLYN | Alteration | Permit Issued | 05/12/2025 | 05/14/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01223390 ↗ | 198 CONOVER STREET BROOKLYN | Alteration | Permit Issued | 05/12/2025 | 05/12/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01213447 ↗ | 215 MOORE STREET BROOKLYN | Alteration | Signed-off | 04/29/2025 | 05/09/2025 | Design SP WONG ARCHITECT PLLC Owner BUNGALOW PROJECTS Filer RIZZO GROUP | Interior partition removals and modifications as per plans filed herewith. |
| B00990065 ↗ | 315 JAY STREET BROOKLYN | Full Demolition | Signed-off | 03/01/2024 | 04/11/2025 | Owner NEW YORK UNIVERSITY Filer EXPEDITE DEM INC | full demolition of 5 story structure using hand held and mechanical means to assist |
| 322100542BIS | 366 FULTON STREET BROOKLYN | — | ISSUED | 06/03/2022 | 04/10/2025 | — | EQ |
| B00984711 ↗ | 315 JAY STREET BROOKLYN | Alteration | Signed-off | 01/24/2024 | 03/28/2025 | Owner NEW YORK UNIVERSITY | Use of temporary construction equipment as per plans filed herewith. |
| B00984715 ↗ | 315 JAY STREET BROOKLYN | Alteration | Signed-off | 01/24/2024 | 03/28/2025 | Owner NEW YORK UNIVERSITY | Use of temporary construction equipment as per plans filed herewith. |
| B01001489 ↗ | 315 JAY STREET BROOKLYN | Alteration | Permit Issued | 02/08/2024 | 03/26/2025 | Design PAUL PERDEK, PROF. ENG. PLLC | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q08029326 ↗ | 51-17 ROCKAWAY BEACH BLVD QUEENS | Alteration | Permit Issued | 11/10/2022 | 03/17/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Owner TISHMAN SPEYER Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01001483 ↗ | 315 JAY STREET BROOKLYN | Alteration | Permit Issued | 02/08/2024 | 03/12/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Owner NEW YORK UNIVERSITY Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 322068999BIS | 93 APOLLO STREET BROOKLYN | — | ISSUED | 06/04/2024 | 03/12/2025 | — | — |
| Q00856487 ↗ | 51-17 ROCKAWAY BEACH BLVD QUEENS | Full Demolition | Signed-off | 06/20/2023 | 03/05/2025 | Owner TISHMAN SPEYER Filer EXPEDITE DEM INC | Use of mechanical demolition equipment as per plans filed herewith. This application is filed in conjunction with DM Q00856487-I1. |
| 122664973BIS | 321 WEST 136 STREET MANHATTAN | — | ISSUED | 06/16/2017 | 02/20/2025 | — | EQ |
| M00997698 ↗ | 154 NASSAU STREET MANHATTAN | Alteration | Signed-off | 02/02/2024 | 02/19/2025 | Owner PACE UNIVERSITY | USE OF MECHANICAL DEMO EQUIPMENT DURING PARTIAL DEMO, FILED SEPARATELY UNDER M00997698-I1. |
| B00644491 ↗ | 356 FULTON STREET BROOKLYN | Alteration | Permit Issued | 12/09/2021 | 02/18/2025 | Design PAUL PERDEK, PROF. ENG. PLLC Owner BROADWALL MANAGEMENT Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00985669 ↗ | 51-17 ROCKAWAY BEACH BLVD QUEENS | Alteration | Permit Issued | 01/17/2025 | 02/14/2025 | Owner TISHMAN SPEYER | INSTALLATION OF TEMPORARY BRACING AS PER PLANS. THIS APPLICATION IS FILED IN CONJUNCTION WITH FULL DEMO, FILED UNDER Q00856487-I1. |