← Back
BuildNYC
Pier, dock, bulkhead
Pier 76 Tow Pound
1 PIER 76 · BIN 1012261
💬 Discuss this project
1900Year Built
1Stories
T2Building Class
M2-3Zoning
393,040 sfGross Floor Area
1Units
LL97 Covered1 Active Violation ▸FDNY Report ↗
Pier, dock, bulkhead · 588,000 sf lot · 0.67 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
BulkheadProposed Building of an Eight (8)-story Commercial and Resid1p · 1 filing · 3 docs
Floor 8Proposed Building of an Eight (8)-story Commercial and Resid1p · 1 filing · 3 docs
Floor 7Proposed Building of an Eight (8)-story Commercial and Resid1p · 1 filing · 3 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Proposed Building of an Eight (8)-story Commercial and Resid1p · 1 filing · 3 docs
Floor 1Oxygen Eventworks, 1800 Tiendita +248p · 24 filings · 20 docs
Site & exteriorHyrox, Walk MS: NYC +1Under Construction81p · 25 filings · 20 docs
Filed — no permit issued1p · 1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hudson River Park Trust6110/04/2026
NYC Department of Design and Construction3303/21/2026
Classic Car Club2107/08/2026
New York Police Department103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants3703/21/2026
KM Associates of New York203/21/2026
ADG Architecture Design803/21/2026
Hudson River Park Trust103/21/2026
Paul Fusco Consulting203/21/2026
Abramson Architects103/21/2026
K & M Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYFF EventsGeneral Contractor1707/08/2026
Winick ProductionsGeneral Contractor1009/26/2026
Eventage Event ProductionGeneral Contractor907/08/2026
NY TentGeneral Contractor909/18/2026
Dynamic Event GroupGeneral Contractor303/21/2026
Westchester Tool RentalsGeneral Contractor203/21/2026
Good Sense & Co Product SGeneral Contractor107/08/2026
Allcom ElectricElectrical103/21/2026
Building Lifecycle
All (262)Filed (80)Permit Issued (29)Signed Off (17)Violation (39)Objection (80)Special Inspection (17)
10/13/2026
Filed — No Work
M01469015-I1
10/08/2026
Objection resolved — Addressed
10/05/2026
Objection raised — Other
10/01/2026
Filed — No Work
M01468057-I1
09/30/2026
Objection resolved — Addressed
09/29/2026
Objection raised — Other
09/25/2026
Permit issued — General Construction
M01460731-I1-GC
09/24/2026
Filed — No Work
M01461844-I1
09/22/2026
Filed — Alteration
Install of temp tents, platforms, scenic walls, trussing, no alt to exist structures for annual Eatscon. A TPA is req'd. Producer is responsible to monitor site safety & implement HWAP. All prod equipment removed upon event completion
M01460731-I1
09/17/2026
Permit issued — General Construction
M00947968-I1-GC
09/16/2026
Special inspection requirement — Final
DANNY TRUJILLO
08/11/2026
Objection resolved — Addressed
08/11/2026
Objection resolved — Addressed
08/11/2026
Objection resolved — Addressed
07/30/2026
Filed — No Work
M01436260-I1
07/30/2026
Objection raised — Other
07/30/2026
Objection raised — Other
07/30/2026
Objection raised — Other
07/20/2026
Signed off — Alteration
Install of temp tents, platforms, trussing, no alt to exist structures for Annual Hyrox. A TPA is required. Producer is responsible to monitor site safety & implement HWAP. All prod equipment removed upon event completion
M01400768-I1
06/01/2026
Objection raised — Other
06/01/2026
Objection resolved — Addressed
05/27/2026
Objection resolved — Addressed
05/27/2026
Objection resolved — Addressed
05/23/2026
Objection raised — Other
05/23/2026
Objection raised — Other
05/21/2026
Permit issued — General Construction
M01400768-I1-GC
05/18/2026
Filed — No Work
M01400784-I1
05/15/2026
Filed — Alteration
Install of temp tents, platforms, trussing, no alt to exist structures for Annual Hyrox. A TPA is required. Producer is responsible to monitor site safety & implement HWAP. All prod equipment removed upon event completion
M01400768-I1
05/12/2026
Special inspection requirement — Final
BARTON BREISCH
04/14/2026
Objection raised — Other
04/14/2026
Objection resolved — Addressed
04/10/2026
Filed — No Work
M01384502-I1
03/31/2026
Permit issued — General Construction
M00854186-I1-GC
03/12/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2025
Signed off — Alteration
M01229471-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/17/2025
Filed — No Work
M01300489-I1
10/17/2025
Objection raised — Admin
10/17/2025
Objection raised — Admin
10/16/2025
Permit issued — General Construction
M01300339-I1-GC
10/15/2025
Filed — Alteration
M01300339-I1
10/14/2025
Filed — No Work
M01300991-I1
10/14/2025
Filed — No Work
M01301370-I1
10/09/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
10/09/2025
Special inspection requirement — Final
DANNY TRUJILLO
10/06/2025
Objection resolved — Addressed
10/06/2025
Objection resolved — Addressed
10/06/2025
Objection resolved — Addressed
10/02/2025
Objection raised — Fire_Protection
10/02/2025
Objection raised — Admin
10/02/2025
Objection raised — Fire_Protection
10/02/2025
Objection raised — Admin
10/02/2025
Objection raised — Fire_Protection
10/02/2025
Objection resolved — Addressed
Latest 60 of 262 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWinick Productions09/25/2026
DOB NOWGeneral ConstructionPermit IssuedNY Tent09/17/2026
DOB NOWGeneral ConstructionSigned-offWinick Productions05/21/2026
DOB NOWGeneral ConstructionPermit IssuedEventage Event Production03/31/2026
DOB NOWGeneral ConstructionPermit IssuedWinick Productions10/16/2025
DOB NOWGeneral ConstructionPermit IssuedWinick Productions09/29/2025
DOB NOWGeneral ConstructionPermit IssuedNY Tent09/29/2025
DOB NOWGeneral ConstructionSigned-offNYFF Events06/02/2025
DOB NOWGeneral ConstructionSigned-offNY Tent05/23/2025
DOB NOWGeneral ConstructionPermit IssuedEventage Event Production03/26/2025
DOB NOWGeneral ConstructionSigned-offWinick Productions09/11/2024
DOB NOWGeneral ConstructionSigned-offWinick Productions05/30/2024
DOB NOWGeneral ConstructionSigned-offNY Tent05/22/2024
DOB NOWGeneral ConstructionSigned-offNYFF Events04/26/2024
DOB NOWGeneral ConstructionPermit IssuedEventage Event Production03/08/2024
DOB NOWGeneral ConstructionPermit IssuedNY Tent10/23/2023
DOB NOWGeneral ConstructionSigned-offNYFF Events10/06/2023
DOB NOWGeneral ConstructionSigned-offWinick Productions08/31/2023
DOB NOWGeneral ConstructionSigned-offWestchester Tool Rentals07/13/2023
DOB NOWGeneral ConstructionPermit IssuedEventage Event Production04/07/2023
DOB NOWGeneral ConstructionSigned-offNYFF Events01/30/2023
DOB NOWGeneral ConstructionSigned-offNYFF Events10/07/2022
DOB NOWGeneral ConstructionSigned-offDynamic Event Group09/13/2022
DOB NOWGeneral ConstructionSigned-offEventage Event Production04/21/2022
DOB NOWGeneral ConstructionPermit IssuedWinick Productions12/06/2021
DOB NOWGeneral ConstructionSigned-offNYFF Events10/05/2021
DOB NOWGeneral ConstructionSigned-offWinick Productions10/01/2021
DOB NOWGeneral ConstructionSigned-offNYFF Events09/02/2021
DOB NOWGeneral ConstructionSigned-offGood Sense & Co Product S08/06/2021
BISOTISSUEDWinick Productions09/24/2019
BISOTISSUED11th Street Workshop09/03/2019
BISOTISSUEDWinick Productions07/08/2019
BISOTISSUEDC & M General Contracting07/03/2019
BISOTISSUEDSampson Laurier Williams03/06/2019
BISOTISSUEDC & M General Contracting06/08/2018
BISOTISSUEDC & M General Contracting03/15/2018
BISPLISSUEDDoval Plumbing & Heating03/05/2018
BISFPISSUEDActive Fire Control01/17/2018
BISOTISSUEDWinick Productions10/27/2017
BISOTISSUEDC & M General Contracting09/07/2017
+ 31 more permits on file
3 projects · most recent 02/03/2023
General Wiring Lighting
FiledStatusContractorScope
02/03/2023Permit IssuedJorob Contracting & Electrical Co—
10/01/2021Permit IssuedTeam Electric—
01/13/2018CompleteTroon Electric of New YorGeneral Wiring, Lighting
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
09/16/2026FinalDANNY TRUJILLOprogress
05/12/2026FinalBARTON BREISCHprogress
10/09/2025FinalDANNY TRUJILLOprogress
09/23/2025FinalDANNY TRUJILLOprogress
05/21/2025FinalChristopher Carranoprogress
09/05/2024FinalANDY ENGLER ROTHprogress
04/22/2024FinalChristopher Carranoprogress
10/13/2023FinalDANNY TRUJILLOprogress
06/30/2023FinalDANNY TRUJILLOprogress
06/09/2023Final—progress
04/03/2023FinalDANNY TRUJILLOprogress
01/26/2023FinalChristopher Carranoprogress
04/07/2022FinalDANNY TRUJILLOprogress
11/23/2021FinalSteven Kratchmanprogress
10/18/2021FinalChristopher Carranoprogress
10/08/2021FinalChristopher Carranoprogress
09/17/2021FinalDANIEL LOUISprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
HyroxFitness / Recreation—
Project M01400768 Alteration · LOC Issued · 05/15/2026
Project M01229471 Alteration · LOC Issued · 05/21/2025
Spotify FestivalEvents & gatherings—
Project M01229586 Alteration · LOC Issued · 05/30/2025
Oxygen EventworksEvents & gatheringsFloor 1
Project M01056341 Alteration · LOC Issued · 05/24/2024
Hyrox NYC 2024Events & gatherings—
Project M01053713 Alteration · LOC Issued · 05/21/2024
1800 TienditaRetailFloor 1
Project M01040037 Alteration · LOC Issued · 04/25/2024
Inca Productions BreitlingArts / Culture / EntertainmentFloor 1
Project M00925697 Alteration · LOC Issued · 08/30/2023
D. E. ShawOffice—
Project M00898664 Alteration · LOC Issued · 07/06/2023
Walk MS: NYCEvents & gatherings—
Project M00854186 Alteration · Permit Entire · 04/05/2023
Red Bull UnveilEvents & gatheringsFloor 1
Project M00819207 Alteration · LOC Issued · 01/26/2023
New York City Wine & Food FestivalEvents & gatherings—
Project M08008348 Alteration · LOC Issued · 10/03/2022
Project M00601588 Alteration · LOC Issued · 10/01/2021
Bureau BetakOffice—
Project M08000868 Alteration · LOC Issued · 09/09/2022
Spotify - Classic Car ClubEvents & gatheringsFloor 1
Project M00596270 Alteration · LOC Issued · 09/22/2021
Coach EventEvents & gatherings—
Project M00585331 Alteration · LOC Issued · 08/30/2021
NY PopsupEvents & gatheringsFloor 1
Project M00569626 Alteration · LOC Issued · 08/04/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 665 on file (BIS + DOB NOW)
▸Plans & Drawings89
▸DOB NOWPlans/Sketch - Temporary Place of Assembly65
10/20/2026M01469015-I1Request digital key ↗
10/14/2026M01469015-I1Request digital key ↗
10/04/2026M01461844-I1Request digital key ↗
Showing 3 of 65 on file for this type
▸DOB NOWPlans/Sketch24
09/03/2026M00569626-I1Request digital key ↗
09/03/2026M00585331-I1Request digital key ↗
09/03/2026M00596270-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits94
▸BISPLAN / WORK APPROVAL APPLICATION51
10/23/2025123297253Open ↗
10/14/2025123297253Open ↗
09/12/2025123297253Open ↗
Showing 3 of 51 on file for this type
▸BISWORK PERMIT APPLICATION32
09/25/2019123774656Open ↗
09/03/2019123882833Open ↗
07/09/2019123774656Open ↗
Showing 3 of 32 on file for this type
▸BISPLACE OF ASSEMBLY8
09/14/2018123356073Open ↗
08/01/2018123356082Open ↗
08/01/2018123334597Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
05/29/2018123297253Open ↗
Showing 1 of 2 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF1
08/01/2018123356082Open ↗
▸Seals & Professional Certifications203
▸DOB NOWDPL-1: Design Professional Seal & Signature88
10/14/2026M01469015-I1Open ↗
10/04/2026M01461844-I1Open ↗
10/04/2026M01468057-I1Open ↗
Showing 3 of 88 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION53
10/09/2019123882833Open ↗
10/09/2019123882833Open ↗
06/28/2019123774656Open ↗
Showing 3 of 53 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST23
09/03/2019123882833Open ↗
06/28/2019123774656Open ↗
03/01/2019123659987Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT20
09/03/2019123882833Open ↗
06/28/2019123774656Open ↗
03/01/2019123659987Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026M01229586-I1Open ↗
09/01/2026M01400768-I1Open ↗
09/01/2026M01106559-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
05/14/2018123042411Open ↗
05/11/2018123042411Open ↗
Showing 2 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/22/2018123042411Open ↗
▸BISOK TO APPROVE TCO PENDING RESOLUTION OF OPEN BOILER VIOLATION - AFFIDAVIT ATTACHED1
12/22/2023123297253Open ↗
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN BOILER VIOLATION - AFFIDAVIT ATTCHED1
09/15/2023123297253Open ↗
▸BISEQUIPMENT USE PERMITS1
06/22/2018123042411Open ↗
▸Safety & Tenant Protection5
▸BISANTI-HARASSMENT CHECKLIST4
06/28/2019123774656Open ↗
03/16/2018123437487Open ↗
Showing 2 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos11
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
03/23/2018123042411Open ↗
Showing 1 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
03/01/2019123659987Open ↗
06/21/2018123042411Open ↗
06/20/2018123042411Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
06/25/2018123042411Open ↗
05/30/2018123297253Open ↗
05/03/2018122945331Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports3
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
09/14/2018123356073Open ↗
08/01/2018123334597Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/30/2020123774656Open ↗
▸Approvals, Objections & Sign-offs84
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter38
10/14/2026M01469015-I1Open ↗
10/04/2026M01461844-I1Open ↗
10/04/2026M01468057-I1Open ↗
Showing 3 of 38 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST29
12/14/2020123297253Open ↗
09/15/2020123297253Open ↗
06/30/2020123774656Open ↗
Showing 3 of 29 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
03/19/2018123356073Open ↗
Showing 1 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
10/14/2025123297253Open ↗
03/29/2018123297253Open ↗
03/22/2018123297253Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
07/09/2019123774656Open ↗
Showing 1 of 3 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT33
06/30/2020123774656Open ↗
06/28/2019123774656Open ↗
03/13/2019123112666Open ↗
Showing 3 of 33 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
03/01/2019123659987Open ↗
▸Filing & Intake Forms85
▸BISBOROUGH INTAKE FORM35
03/23/2020123297253Open ↗
12/24/2019123297253Open ↗
12/23/2019123297253Open ↗
Showing 3 of 35 on file for this type
▸BISADDITIONAL INFORMATION27
10/23/2025123297253Open ↗
11/14/2019123297253Open ↗
10/10/2019123774656Open ↗
Showing 3 of 27 on file for this type
▸BISEFILING COVER SHEET22
09/03/2019123882833Open ↗
06/28/2019123774656Open ↗
03/01/2019123659987Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
08/26/2025123297253Open ↗
06/19/2018123297253Open ↗
03/20/2018123356082Open ↗
Showing 3 of 9 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
03/30/2018140729344Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026M00947968-I1Open ↗