| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01451293 ↗ | 25 11 AVENUE MANHATTAN | — | Permit Issued | — | 09/14/2026 | Design MCLAREN ENGINEERING GROUP Owner RXR Filer M.G. MCLAREN, P.C. | Temporary Installation in Auditorium at 3RD FL to be removed after event |
| M01396890 ↗ | 60 COLUMBUS AVENUE MANHATTAN | Alteration | Permit Issued | 05/04/2026 | 05/06/2026 | Design SYNC ARCHITECTURE P.C Owner LINCOLN CENTER | Temporary structures for YT Brandcast event at JRP plaza. Removed at the end of the programing. No changes to existing structures, use or e… |
| M01365421 ↗ | 25 11 AVENUE MANHATTAN | Alteration | Permit Issued | 02/27/2026 | 03/06/2026 | — | Temporary Installation in Auditorium at 3RD FL to be removed after event |
| M01277673 ↗ | 25 11 AVENUE MANHATTAN | Alteration | Signed-off | 08/27/2025 | 09/02/2025 | Design MCLAREN ENGINEERING GROUP Owner RXR REALTY Filer M.G. MCLAREN, P.C. | Temporary Installation in Auditorium at 3RD FL to be removed after event |
| M01220764 ↗ | 60 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 05/05/2025 | 05/07/2025 | Design SYNC ARCHITECTURE P.C Owner LINCOLN CENTER | Temporary structures for a YouTube event in LC JRP plaza. Removed at the end of the programing. No changes to existing structures, use or e… |
| M01209666 ↗ | 25 11 AVENUE MANHATTAN | Alteration | Signed-off | 04/14/2025 | 04/17/2025 | Design MCLAREN ENGINEERING GROUP | Temporary Installation in Auditorium at 4TH FL to be removed after event |
| Name | Projects together | Most recent |
|---|---|---|
| MCLAREN ENGINEERING GROUP | 8 | 08/27/2025 |
| SYNC ARCHITECTURE P.C | 4 | 05/04/2026 |
| THETA CONSULTING LLC | 1 | 09/15/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| RXR REALTY | 3 | 08/27/2025 |
| LINCOLN CENTER | 2 | 05/04/2026 |
| HUDSON RIVER PARK TRUST | 1 | 08/04/2021 |
| RXR | 1 | — |
| THE SHUBERT ORGANIZATION, INC. | 1 | 05/04/2022 |
| VORNADO REALTY TRUST | 1 | 11/15/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| M.G. MCLAREN, P.C. | 4 | 08/27/2025 |
| MUNICIPAL BUILDING CONSULTANTS | 4 | 05/04/2026 |
| NYCCODE LLC | 1 | 05/04/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01451293 ↗ | 25 11 AVENUE MANHATTAN | — | Permit Issued | — | 09/14/2026 | Design MCLAREN ENGINEERING GROUP Owner RXR Filer M.G. MCLAREN, P.C. | Temporary Installation in Auditorium at 3RD FL to be removed after event |
| M01396890 ↗ | 60 COLUMBUS AVENUE MANHATTAN | Alteration | Permit Issued | 05/04/2026 | 05/06/2026 | Design SYNC ARCHITECTURE P.C Owner LINCOLN CENTER | Temporary structures for YT Brandcast event at JRP plaza. Removed at the end of the programing. No changes to existing structures, use or e… |
| M01365421 ↗ | 25 11 AVENUE MANHATTAN | Alteration | Permit Issued | 02/27/2026 | 03/06/2026 | — | Temporary Installation in Auditorium at 3RD FL to be removed after event |
| M01277673 ↗ | 25 11 AVENUE MANHATTAN | Alteration | Signed-off | 08/27/2025 | 09/02/2025 | Design MCLAREN ENGINEERING GROUP Owner RXR REALTY Filer M.G. MCLAREN, P.C. | Temporary Installation in Auditorium at 3RD FL to be removed after event |
| M01220764 ↗ | 60 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 05/05/2025 | 05/07/2025 | Design SYNC ARCHITECTURE P.C Owner LINCOLN CENTER | Temporary structures for a YouTube event in LC JRP plaza. Removed at the end of the programing. No changes to existing structures, use or e… |
| M01209666 ↗ | 25 11 AVENUE MANHATTAN | Alteration | Signed-off | 04/14/2025 | 04/17/2025 | Design MCLAREN ENGINEERING GROUP | Temporary Installation in Auditorium at 4TH FL to be removed after event |
| M01134196 ↗ | 245 WEST 44 STREET MANHATTAN | Alteration | Signed-off | 11/07/2024 | 11/13/2024 | Design MCLAREN ENGINEERING GROUP | Stage modification for the run of the show Gypsy the Majestic Theater. No change to use, egress, or occupancy. |
| M01098850 ↗ | 100 WEST 33 STREET MANHATTAN | Alteration | Signed-off | 08/21/2024 | 10/29/2024 | Design SYNC ARCHITECTURE P.C Owner VORNADO REALTY TRUST | Temporary structures for the Squid Games exhibition hall in a vacant retail space. Removed at the end of the programing. No changes to ex… |
| M01101726 ↗ | 25 11 AVENUE MANHATTAN | Alteration | Signed-off | 08/28/2024 | 09/04/2024 | Design MCLAREN ENGINEERING GROUP Owner RXR REALTY Filer M.G. MCLAREN, P.C. | Temporary Installation in Auditorium at 4TH FL to be removed after event |
| M01035653 ↗ | 25 11 AVENUE MANHATTAN | Alteration | Signed-off | 04/15/2024 | 04/17/2024 | Design MCLAREN ENGINEERING GROUP Owner RXR REALTY Filer M.G. MCLAREN, P.C. | Temporary Installation in Auditorium at 4TH FL to be removed after event |
| M00871805 ↗ | 60 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 05/09/2023 | 01/09/2024 | Design SYNC ARCHITECTURE P.C | Temporary structures for YouTube event at Geffen Hall. Removed at the end of the programing. No changes to existing structures, use or egre… |
| M00933251 ↗ | 25 11 AVENUE MANHATTAN | Alteration | Signed-off | 09/15/2023 | 09/19/2023 | Design THETA CONSULTING LLC | Subsequent filing for temporary construction of stage, screens, scenic pieces, and monitor supports related to TPA event filed under job M00… |
| M00728540 ↗ | 249 WEST 45 STREET MANHATTAN | Alteration | Signed-off | 05/04/2022 | 05/06/2022 | Design MCLAREN ENGINEERING GROUP Filer NYCCODE LLC | Temporary installation of the freestanding lighting support frames in mezzanine, and stage thrust structures & steps unit associated with a … |
| M00569626 ↗ | MARGINAL STREET MANHATTAN | Alteration | Signed-off | 08/04/2021 | 08/06/2021 | Design MCLAREN ENGINEERING GROUP Owner HUDSON RIVER PARK TRUST | Installation of Temporary tent for NY PopsUP August 7 2021, one day event |
| 123736332BIS | 50 VARICK STREET MANHATTAN | — | ISSUED | 04/16/2019 | 04/16/2019 | — | OT |
| 123736350BIS | 01 MANHATTAN PLAZA MANHATTAN | — | ISSUED | 04/16/2019 | 04/16/2019 | — | OT |
| 123440981BIS | 50 VARICK STREET MANHATTAN | — | ISSUED | 04/10/2018 | 04/10/2018 | — | OT |
| 123441490BIS | 01 MANHATTAN PLAZA MANHATTAN | — | ISSUED | 04/10/2018 | 04/10/2018 | — | OT |
| 123446333BIS | 508 WEST 37 STREET MANHATTAN | — | ISSUED | 03/06/2018 | 03/06/2018 | — | OT |
| 123328586BIS | 01 MANHATTAN PLAZA MANHATTAN | — | ISSUED | 07/12/2017 | 07/12/2017 | — | OT |
| 321468657BIS | 652 KENT AVENUE BROOKLYN | — | ISSUED | 10/27/2016 | 10/27/2016 | — | OT |
| 122715810BIS | 360 WEST STREET MANHATTAN | — | ISSUED | 04/28/2016 | 04/28/2016 | — | OT |
| 122749712BIS | 01 MANHATTAN PLAZA MANHATTAN | — | ISSUED | 04/01/2016 | 04/01/2016 | — | OT |
| 122748394BIS | 50 VARICK STREET MANHATTAN | — | ISSUED | 03/31/2016 | 03/31/2016 | — | OT |
| 122366796BIS | 01 MANHATTAN PLAZA MANHATTAN | — | ISSUED | 04/13/2015 | 04/13/2015 | — | OT |
| 120322285BIS | 200 VESEY STREET MANHATTAN | — | ISSUED | 04/19/2010 | 04/09/2015 | — | OT |
| 121041390BIS | 200 VESEY STREET MANHATTAN | — | ISSUED | 04/11/2012 | 04/03/2015 | — | OT |
| 122355405BIS | 50 VARICK STREET MANHATTAN | — | ISSUED | 04/02/2015 | 04/02/2015 | — | OT |
| 121593800BIS | MARGINAL STREET WHARF MANHATTAN | — | ISSUED | 04/23/2013 | 04/23/2013 | — | OT |
| 121593819BIS | MARGINAL STREET WHARF MANHATTAN | — | ISSUED | 04/23/2013 | 04/23/2013 | — | OT |
| 120654461BIS | 200 VESEY STREET MANHATTAN | — | ISSUED | 04/07/2011 | 04/18/2012 | — | OT |
| 120654470BIS | 200 VESEY STREET MANHATTAN | — | ISSUED | 04/07/2011 | 04/18/2012 | — | OT |
| 121041407BIS | 200 VESEY STREET MANHATTAN | — | ISSUED | 04/11/2012 | 04/11/2012 | — | OT |
| 120322187BIS | 200 VESEY STREET MANHATTAN | — | ISSUED | 04/19/2010 | 04/19/2010 | — | OT |
| Building | Filings | Most Recent |
|---|---|---|
| 25 11 AVENUE ↗ | 12 | 09/15/2026 |
| 60 COLUMBUS AVENUE ↗ | 4 | 07/08/2026 |
| MARGINAL STREET ↗ | 1 | 07/08/2026 |
| 245 WEST 44 STREET ↗ | 1 | 07/08/2026 |
| 100 WEST 33 STREET ↗ | 4 | 07/08/2026 |
| 60 COLUMBUS AVENUE ↗ | 6 | 03/21/2026 |
| 249 WEST 45 STREET ↗ | 3 | 03/21/2026 |