| Owner | Filings | Most Recent |
|---|---|---|
| ACTA REALTY | 260 | 07/08/2026 |
| DEERPATH CONSTRUCTION COR | 1 | 03/22/2026 |
| AMERICON CONSTRUCTION | 1 | 03/22/2026 |
| ONE STATE LLC | 2 | 03/22/2026 |
| SOUTH FERRY CO | 4 | 03/22/2026 |
| ACTA REALTY CORP 29 FL | 2 | 03/22/2026 |
| J. HENRY SCHRODER CO | 1 | 03/22/2026 |
| WOLFSON GROUP | 6 | 03/21/2026 |
| 1 STATE STREET | 106 | 03/21/2026 |
| ONE STATE STREET PLAZA | 15 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| THE DEROSA GROUP, PC ARCHITECTS | 2 | 08/05/2026 |
| RANDALL P. COLLINS ARCHITECT, PC | 7 | 01/12/2026 |
| IMEG CONSULTING CORP. | 3 | 09/15/2025 |
| MONTROY ARCHITECTURE PLLC | 1 | 09/12/2025 |
| MG ENGINEERING D.P.C. | 31 | 08/04/2025 |
| MCALPINE ASSOCIATES ARCHITECTS PC | 1 | 08/04/2025 |
| LPE ENGINEERING, PC | 1 | 08/04/2025 |
| REDDYMADE ARCHITECTURE & DESIGN | 1 | 07/08/2025 |
| ADG ARCHITECTURE AND DESIGN PC | 1 | 04/28/2025 |
| STARK CONSULTING, LLC | 3 | 04/03/2025 |
| DI DIO ARCHITECTURE, PC | 1 | 04/02/2025 |
| BR DESIGN ASSOCIATES LLC | 2 | 02/24/2025 |
| FL&M ENGINEERING DESIGN &INSPECTION | 2 | 10/03/2024 |
| OFFICE OF JAMES RUDERMAN | 3 | 05/31/2024 |
| BURNS ENGINEERING, PC | 3 | 03/21/2023 |
| JMV CONSULTING ENGINEERING | 3 | 07/27/2022 |
| MARCY ENGINEERING, PLLC | 1 | 11/18/2021 |
| GREGORY COMITO | 1 | 08/03/2021 |
| LIZARDOS ENGINEERING | 2 | 07/30/2021 |
| JACK GREEN ASSOCIATES | 3 | 08/26/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| GEIGER E A GROUP | 4 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 12 | 03/21/2026 |
| EMPIRE CITY CONSULTANTS, INC. | 8 | 03/21/2026 |
| DVA Advisors | 4 | 03/21/2026 |
| METROPOLIS GROUP INC | 2 | 03/21/2026 |
| JM ZONING, LLC. | 34 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 40 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 1 | 03/21/2026 |
| K M DOB CONSULTING | 6 | 03/21/2026 |
| EXPEDIA BUILDING SOLUTION | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| STEPPING STONE CONSTRUCT* | General Contractor | 18 | 07/08/2026 |
| NUCOR CONSTRUCTION CORP | General Contractor | 12 | 07/08/2026 |
| SWINERTON BUILDERS | General Contractor | 10 | 07/08/2026 |
| THE VENETIAN GROUP LLC | General Contractor | 8 | 07/08/2026 |
| WILLIAM C. GERAKARIS P&H | Plumbing | 8 | 07/08/2026 |
| METRO FIRE PROTECTION INC | Fire Protection | 4 | 07/08/2026 |
| KATSELNIK & KATSELNIK GRP | General Contractor | 4 | 07/08/2026 |
| MC SUPERSTRUCTURE INC | General Contractor | 4 | 03/21/2026 |
| ACCURATE MECHANICAL INC | Fire Protection | 3 | 07/08/2026 |
| ACCURATE MECHANICAL INC | Plumbing | 3 | 07/08/2026 |
| PSI PARTNERS, LLC | Fire Protection | 2 | 07/08/2026 |
| KREMER, WILLIAM | Electrical | 2 | 03/21/2026 |
| NAVAS, WILMER | Electrical | 2 | 03/21/2026 |
| RALPH OCCHIPINTI | Electrical | 2 | 03/21/2026 |
| ALLSTATE SPRINKLER LLC | Fire Protection | 2 | 07/08/2026 |
| CURRENT FIRE PROTECTION INC | Fire Protection | 2 | 07/08/2026 |
| DENNIS KEARNS | Electrical | 2 | 03/21/2026 |
| DONNELLY MECHANICAL CORP | General Contractor | 2 | 03/21/2026 |
| SPK/LEWIS CONSTRUCTION LL | General Contractor | 2 | 04/09/2026 |
| HUDSON MERIDIAN CONSTRUCTION | General Contractor | 1 | 04/09/2026 |
| MILL BROOK FIRE PROTECTION | Fire Protection | 1 | 07/08/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 1 | 07/08/2026 |
| PREMIER SANITATION LLC | General Contractor | 1 | 07/08/2026 |
| JOSHUA ANDERSON | Electrical | 1 | 03/21/2026 |
| DEMAR PLUMBING CORP | Fire Protection | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SPECIAL TESTING & CONSULT | 1688 | 19 | 01/12/2026 |
| MEP INSPECTIONS, INC | 1102 | 3 | 09/15/2025 |
| MCALPINE ARCHITECTURE PC | 5694 | 1 | 08/04/2025 |
| LPE ENGINEERING PC | 3102 | 1 | 08/04/2025 |
| AK ENGINEERING PC | 678 | 13 | 12/08/2023 |
| PSI AGENCY INC. | 254 | 7 | 03/21/2023 |
| JMV CONSULTING ENGINEERIN | 804 | 3 | 07/27/2022 |
| J STONE ACQUISITIONS LLC | 8153 | 1 | 11/18/2021 |
| MILROSE CONSULTANTS LLC | 2003 | 2 | 07/30/2021 |
| O'ROURKE ENGINEERING, LLC | 5873 | 3 | 01/15/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Signed-off | NUCOR CONSTRUCTION CORP | 04/01/2026 |
| DOB NOW | Mechanical Systems | Signed-off | SWINERTON BUILDERS | 02/12/2026 |
| DOB NOW | General Construction | Signed-off | SWINERTON BUILDERS | 02/12/2026 |
| DOB NOW | Mechanical Systems | Signed-off | SWINERTON BUILDERS | 02/12/2026 |
| DOB NOW | General Construction | Signed-off | SWINERTON BUILDERS | 02/12/2026 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 11/25/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SPK/LEWIS CONSTRUCTION LL | 11/17/2025 |
| DOB NOW | Sprinklers | Signed-off | ALLSTATE SPRINKLER LLC | 10/31/2025 |
| DOB NOW | Plumbing | Signed-off | WILLIAM C. GERAKARIS P&H | 10/24/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SWINERTON BUILDERS | 10/24/2025 |
| DOB NOW | General Construction | Signed-off | SWINERTON BUILDERS | 10/24/2025 |
| DOB NOW | General Construction | Signed-off | SPK/LEWIS CONSTRUCTION LL | 10/01/2025 |
| DOB NOW | Plumbing | Signed-off | DPH PLUMBING & HTG CORP | 09/30/2025 |
| DOB NOW | General Construction | Signed-off | ULTIMATE SAFETY ASS INC | 09/10/2025 |
| DOB NOW | General Construction | Signed-off | SWINERTON BUILDERS | 08/22/2025 |
| DOB NOW | General Construction | Signed-off | STEPPING STONE CONSTRUCT* | 08/15/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | MC SUPERSTRUCTURE INC | 07/30/2025 |
| DOB NOW | Plumbing | Signed-off | WILLIAM C. GERAKARIS P&H | 07/16/2025 |
| DOB NOW | Sprinklers | Signed-off | ALLSTATE SPRINKLER LLC | 07/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SWINERTON BUILDERS | 06/27/2025 |
| DOB NOW | General Construction | Signed-off | SWINERTON BUILDERS | 06/27/2025 |
| DOB NOW | General Construction | Signed-off | STEPPING STONE CONSTRUCT* | 05/12/2025 |
| DOB NOW | General Construction | Signed-off | PREMIER SANITATION LLC | 03/13/2025 |
| DOB NOW | General Construction | Signed-off | NUCOR CONSTRUCTION CORP | 11/20/2024 |
| DOB NOW | Mechanical Systems | Signed-off | NUCOR CONSTRUCTION CORP | 11/04/2024 |
| DOB NOW | Sprinklers | Signed-off | LEGUCI PIPING&HEATING LLC | 11/04/2024 |
| DOB NOW | Mechanical Systems | Signed-off | NUCOR CONSTRUCTION CORP | 11/04/2024 |
| DOB NOW | Sprinklers | Signed-off | A + SPRINKLER CORP | 11/01/2024 |
| DOB NOW | Plumbing | Signed-off | WILLIAM C. GERAKARIS P&H | 10/31/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | MC SUPERSTRUCTURE INC | 08/28/2024 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 08/13/2024 |
| DOB NOW | General Construction | Signed-off | NUCOR CONSTRUCTION CORP | 08/09/2024 |
| DOB NOW | Mechanical Systems | Signed-off | NUCOR CONSTRUCTION CORP | 08/09/2024 |
| DOB NOW | Structural | Signed-off | NUCOR CONSTRUCTION CORP | 08/09/2024 |
| DOB NOW | Plumbing | Signed-off | WILLIAM C. GERAKARIS P&H | 08/09/2024 |
| DOB NOW | Mechanical Systems | Signed-off | STEPPING STONE CONSTRUCT* | 04/12/2024 |
| DOB NOW | General Construction | Signed-off | STEPPING STONE CONSTRUCT* | 07/13/2023 |
| DOB NOW | Structural | Signed-off | STEPPING STONE CONSTRUCT* | 07/13/2023 |
| DOB NOW | Plumbing | Signed-off | WILLIAM C. GERAKARIS P&H | 06/28/2023 |
| DOB NOW | General Construction | Signed-off | STEPPING STONE CONSTRUCT* | 06/27/2023 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/02/2019 | — | — | Air Conditioning Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/12/2026 | Signed-off | ALLSTATE SPRINKLER LLC | Sprinkler System |
| 04/03/2025 | Signed-off | ALLSTATE SPRINKLER LLC | Sprinkler System |
| 08/12/2024 | Signed-off | A + SPRINKLER CORP | Sprinkler System |
| 11/09/2020 | Permit Issued | CURRENT FIRE PROTECTION I | 59 heads, 1 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/12/2026 | Signed-off | WILLIAM C. GERAKARIS P&H | Water/Sanitary |
| 04/03/2025 | Signed-off | WILLIAM C. GERAKARIS P&H | Water/Sanitary |
| 08/12/2024 | Signed-off | WILLIAM C. GERAKARIS P&H | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/24/2025 | Pending Payment | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 09/22/2025 | Complete | PROSTO ELECTRIC CORP | General Wiring |
| 09/11/2025 | Permit Issued | TOP SHELF ELECTRIC CORP | General Wiring |
| 07/07/2025 | Complete | LIVE WIRE ELECTRIC 1 LLC | General Wiring |
| 11/11/2024 | Complete | M&T ELECTRICAL LLC | General Wiring |
| 10/23/2024 | Permit Issued | LIVE WIRE ELECTRIC 1 LLC | 1 meters |
| 08/22/2024 | Complete | MIKOMA ELECTRIC LLC | General Wiring |
| 11/03/2022 | Complete | ENTERPRISE ELEC'L SYSTEMS | General Wiring |
| 11/30/2021 | Permit Issued | AMC ELEC'L SERVICES, INC. | General Wiring |
| 09/03/2021 | Permit Issued | TUXEDO ELEC'L CONTR'G INC | — |
| 02/08/2021 | Complete | E-J ELEC. INSTALLATION CO | General Wiring |
| 01/27/2021 | Complete | JAY UNITED ELECL CONTNG C | General Wiring |
| 08/12/2020 | Permit Issued | CITYWIDE ELEC'L WIRING IN | General Wiring |
| 05/01/2020 | Permit Issued | H. & L. ELECTRIC INC | General Wiring |
| 09/30/2019 | Permit Issued | TUXEDO ELEC'L CONTR'G INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/03/2025 | Signed-off | SWINERTON BUILDERS | 1 scope_items |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/29/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/22/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/22/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/15/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/09/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/07/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/07/2026 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 12/10/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/02/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/02/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 11/26/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/26/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/12/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/03/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/24/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/05/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/05/2025 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 05/05/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/01/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/25/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/25/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/25/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 03/25/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/22/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/23/2026 | Fenestration air leakage | — | energy_progress |
| 07/23/2026 | Interior lighting power | — | energy_progress |
| 07/23/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/23/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | — | special |
| 07/23/2026 | Vestibules | — | energy_progress |
| 07/23/2026 | Fenestration areas | — | energy_progress |
| 07/23/2026 | Lighting controls | — | energy_progress |
| 07/23/2026 | Energy Code Compliance Inspections | — | progress |
| 07/23/2026 | Fire-Resistance Rated Construction | — | progress |
| 07/23/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 07/23/2026 | Air barrier - visual inspection | — | energy_progress |
| 01/30/2026 | Fire-Resistance Rated Construction | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 01/30/2026 | Final | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 01/30/2026 | Fire-Resistant Penetrations and Joints | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 01/07/2026 | Fire-Resistance Rated Construction | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 01/07/2026 | Fire-Resistant Penetrations and Joints | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 01/07/2026 | Final | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 08/04/2025 | Maintenance information | Nicolas Crosetto | energy_progress |
| 08/04/2025 | Fire-Resistant Penetrations and Joints | Nicolas Crosetto | special |
| 08/04/2025 | Post-installed Anchors | Nicolas Crosetto | special |
| 08/04/2025 | HVAC-R and service water piping design and insulation | Nicolas Crosetto | energy_progress |
| 08/04/2025 | Duct leakage testing, insulation and design | Nicolas Crosetto | energy_progress |
| 07/31/2025 | Final | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 07/31/2025 | Post-installed Anchors | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 07/31/2025 | Fire-Resistant Penetrations and Joints | SEBASTIAN SETTEDUCATE JR., P.E | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Edgewood Partners Insurance Center | Office | Floors 8, 9 | Project M01260623 Project M01260635 Project M01260985 |