| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01066241 ↗ | 40-22 COLLEGE POINT BLVD QUEENS | Alteration | Permit Issued | 08/12/2024 | 09/29/2026 | Design RAYMOND CHAN ARCHITECT, PC. Owner Acadia Realty Trust Contractor INSEA GROUP | MODIFICATION TO EXISTING SPRINKLER SYSTEM FOR EATING & DRINKING ON FLOORS 3 & 5. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01214210 ↗ | 710 EAST NEW YORK AVENUE BROOKLYN | Alteration CO | Permit Issued | 11/13/2025 | 09/29/2026 | Design SLM ARCHITECTURE, P.C. Contractor FSC D&C LLC | Herewith filing ALT1 to correct the existing CoO to include; Conversion of maintenance shop and super's office to a community room, convert … |
| M01258687 ↗ | 1240 5 AVENUE MANHATTAN | Alteration | Permit Issued | 08/04/2025 | 09/25/2026 | Design OLA CONSULTING ENGINEERS, PC Contractor ZDG, LLC | PARTIAL REMOVAL AND INSTALLATION OF WALLS, DOORS,CEILINGS AND NEW FINISHES AS PER PLANS ON THE MAIN HOSPITAL FLOOR 6 OF WING 'A'. NO CHANGE … |
| B01377478 ↗ | 129 MONTAGUE STREET BROOKLYN | Alteration | Permit Issued | 07/31/2026 | 09/25/2026 | Owner BROWN HARRIS STEVENS Contractor BEDROCK PLBG. & HTG., INC | REMOVAL OF INTERIOR FINISHES, INSTALLATION OF DOORS, FLOOR FINISHES, AND 1ST FLOOR CEILING SPACE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY … |
| M01423783 ↗ | 3 SAINT MARKS PLACE MANHATTAN | — | Permit Issued | — | 09/24/2026 | Design COSENTINI ASSOCIATES Owner Parkview Financial Contractor TRITON CONSTRUCTION CO., | INTERIOR RENOVAITION OF THE 6TH & 7TH FLOOR PARTITIONS, CEILINGS, DOORS AND FINISHES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCU… |
| M01454680 ↗ | 1849 2 AVENUE MANHATTAN | — | Permit Issued | — | 09/24/2026 | Design HNY CONSULTING ENGINEERS LLC Contractor ADVANCED PLUMBING MECH | HEREWITH FILING FOR INSTALLATION OF NEW GAS LINE TO EXISTING ROOF HVAC UNITS AND NEW KITCHEN APPLIANCES ON THE SUBCELLAR,1ST, 2nd FLOOR AS … |
| Name | Projects together | Most recent |
|---|---|---|
| MG ENGINEERING D.P.C. | 401 | 09/01/2026 |
| C3D ARCHITECTURE PLLC | 259 | 08/27/2026 |
| DAGHER ENGINEERING PLLC | 240 | 07/23/2026 |
| ROBERT DERECTOR ASSOCIATES | 188 | 08/27/2026 |
| CFS ENGINEERING, DPC | 100 | 07/17/2026 |
| JAROS BAUM & BOLLES | 96 | 09/01/2026 |
| COSENTINI ASSOCIATES | 94 | 07/23/2026 |
| GOLDMAN COPELAND ASSOCIATES | 84 | 08/11/2026 |
| MEYERS+ ENGINEERS | 79 | 08/14/2026 |
| SLM ARCHITECTURE, P.C. | 66 | 09/16/2026 |
| WSP | 66 | 04/16/2026 |
| FOGARTY FINGER ARCHITECTURE PLLC | 65 | 08/14/2026 |
| CPENGINEERING PC | 61 | 01/07/2026 |
| WB ENGINEERS & CONSULTANTS PLLC | 60 | 08/18/2026 |
| LORING CONSULTING ENGINEERS, INC. | 59 | 08/06/2026 |
| STEVEN PAUL HAMMER | 57 | 06/02/2026 |
| Spectorgroup Architecture LLP | 56 | 08/24/2026 |
| TPG ARCHITECTURE, LLP | 55 | 08/18/2026 |
| GENSLER | 54 | 03/27/2026 |
| TSF ENGINEERING, PC | 54 | 06/05/2026 |
| AMA CONSULTING ENGINEERS, PC | 53 | 08/14/2026 |
| JACK GREEN ASSOCIATES | 45 | 07/27/2026 |
| PATTI & ANTHES CONSULTING ENGINEERS | 40 | 08/24/2026 |
| ADS ENGINEERS | 39 | 12/17/2025 |
| MADSEN CONSULTING ENGINEERING | 38 | 08/20/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| TRI-STAR CONSTRUCTION COR | 176 | 08/14/2026 |
| S.O.S. PLBG & HTG LTD | 99 | 08/27/2026 |
| MAGNUS GS INC | 88 | 08/27/2026 |
| FSC D&C LLC | 85 | 09/16/2026 |
| CITY/SUBURBAN PLBG CORP | 83 | 07/24/2026 |
| A & E PLUMBING CORP | 75 | 06/16/2026 |
| FULL CAPACITY FIRE CORP | 74 | 08/14/2026 |
| PAR PLUMBING CO., INC | 70 | 08/11/2026 |
| PYRAMID ETC COMPANIES, LL | 70 | 08/20/2026 |
| DUAL FUEL PLUBING & HTING | 66 | 07/23/2026 |
| ABCO PEERLESS SPRINKLER | 59 | 08/27/2026 |
| STRUCTURE TONE, LLC | 58 | 08/27/2026 |
| SIRINA FIRE PROT CORP | 48 | 06/11/2026 |
| TRITON CONSTRUCTION CO., | 48 | 07/31/2026 |
| PSI PARTNERS, LLC | 47 | 08/05/2026 |
| TT MECHANICAL CORP | 45 | 07/23/2026 |
| JRM CONSTRUCTION MGMT LLC | 43 | 06/25/2026 |
| L&K PARTNERS, INC | 40 | 10/29/2025 |
| REMI INTERIORS INC | 39 | 05/05/2026 |
| PACE PLUMBING CORP | 37 | 05/12/2026 |
| TRISTATE PLBG SVCS CORP | 37 | 06/29/2026 |
| JT MAGEN & COMPANY INC | 36 | 07/15/2026 |
| PAR FIRE PROTECTION LLC | 36 | 05/06/2026 |
| SAVCON CONSTRUCTION LLC | 35 | 05/13/2026 |
| A + SPRINKLER CORP | 34 | 07/21/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| RFR REALTY LLC | 392 | 08/24/2026 |
| NYC PACT PRESERVATION PARTNERS | 347 | 09/16/2026 |
| STONEHENGE MANAGEMENT LLC | 277 | 08/27/2026 |
| 5TH MIDTOWN LLC | 173 | 08/21/2026 |
| 885 SECOND AVENUE LESSEE LLC | 105 | 08/11/2026 |
| 345 PAS HOLDINGS LLC | 71 | 09/01/2026 |
| Met Tower Owner | 71 | 05/19/2026 |
| HARBOR GROUP MANAGEMENT | 57 | 08/18/2026 |
| CS 393 LLC | 56 | 04/21/2025 |
| GREENBROOK PARTNERS | 49 | 11/06/2025 |
| WINTER MANAGEMENT CORP. | 43 | 12/18/2025 |
| 1241 Broadway LLC | 39 | 07/20/2026 |
| ORIENT OVERSEAS ASSOCIATES | 39 | 12/04/2023 |
| HUDSON SQUARE REALTY, LLC | 38 | 06/11/2026 |
| 110 WILLIAM PROPERTY INVESTORS III, | 36 | 06/29/2026 |
| ENTITY NAME, LLC | 36 | 01/23/2023 |
| MERINGOFF PROPERTIES, INC. | 36 | 01/20/2026 |
| BSC HOUSING COMPANY, INC | 34 | 08/05/2026 |
| MOUNT SINAI HOSPITAL | 30 | 04/22/2025 |
| DAJIA US | 29 | 09/08/2026 |
| CUSHMAN & WAKEFIELD | 28 | 06/03/2026 |
| NEW YORK PRESBYTERIAN | 28 | 07/08/2026 |
| HMC TIMES SQUARE HOTEL LP | 27 | 10/03/2025 |
| ALLIED PARTNERS | 26 | 12/11/2025 |
| STELLAR MANAGEMENT | 26 | 08/05/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Hierarch-E LLC | 8 | 05/29/2026 |
| JM ZONING, LLC. | 3 | 01/05/2026 |
| CORE CONSULTANTS NYC | 2 | 07/23/2025 |
| HOWARD I. SHAPIRO & ASSOCIATES | 2 | 10/30/2025 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 07/11/2026 |
| PINTO STUDIO, INC | 2 | 06/25/2026 |
| 4444 PPPP CORP | 1 | 07/23/2025 |
| A+ EXPEDITING INC. | 1 | 04/22/2026 |
| A1 EXPEDITING SERVICE CORP. | 1 | 02/26/2026 |
| ADVANCED BUILDERS SERVICES | 1 | 05/20/2022 |
| ARCHVISION DESIGN STUDIO | 1 | 06/09/2026 |
| CONVERSANO ASSOCIATES, INC. | 1 | 10/10/2024 |
| DOMINION EXPEDITING | 1 | 01/15/2026 |
| EA DESIGN GROUP, INC. | 1 | 02/04/2026 |
| EUROCELT EXPEDITING, INC | 1 | 06/27/2025 |
| FEBRUARY 30TH INC. | 1 | 11/06/2025 |
| GILLMAN CONSULTING INC | 1 | 08/05/2026 |
| IMA EXPEDITNG | 1 | 05/14/2026 |
| J. CALLAHAN CONSULTING, INC. | 1 | 02/06/2026 |
| J. SIBAJA KITCHEN AND VENTILATION, | 1 | 05/14/2026 |
| JAM CONSULTANTS, INC. | 1 | 05/14/2026 |
| JMV ASSOCIATES LLC | 1 | 06/01/2026 |
| RAMPULLA ASSOCIATES ARCHITECTS | 1 | 09/11/2025 |
| SEARS TAMBASCO ARCHITECTURE | 1 | 06/16/2025 |
| SITE SAFETY BSD | 1 | 08/21/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01066241 ↗ | 40-22 COLLEGE POINT BLVD QUEENS | Alteration | Permit Issued | 08/12/2024 | 09/29/2026 | Design RAYMOND CHAN ARCHITECT, PC. Owner Acadia Realty Trust Contractor INSEA GROUP | MODIFICATION TO EXISTING SPRINKLER SYSTEM FOR EATING & DRINKING ON FLOORS 3 & 5. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01214210 ↗ | 710 EAST NEW YORK AVENUE BROOKLYN | Alteration CO | Permit Issued | 11/13/2025 | 09/29/2026 | Design SLM ARCHITECTURE, P.C. Contractor FSC D&C LLC | Herewith filing ALT1 to correct the existing CoO to include; Conversion of maintenance shop and super's office to a community room, convert … |
| M01258687 ↗ | 1240 5 AVENUE MANHATTAN | Alteration | Permit Issued | 08/04/2025 | 09/25/2026 | Design OLA CONSULTING ENGINEERS, PC Contractor ZDG, LLC | PARTIAL REMOVAL AND INSTALLATION OF WALLS, DOORS,CEILINGS AND NEW FINISHES AS PER PLANS ON THE MAIN HOSPITAL FLOOR 6 OF WING 'A'. NO CHANGE … |
| B01377478 ↗ | 129 MONTAGUE STREET BROOKLYN | Alteration | Permit Issued | 07/31/2026 | 09/25/2026 | Owner BROWN HARRIS STEVENS Contractor BEDROCK PLBG. & HTG., INC | REMOVAL OF INTERIOR FINISHES, INSTALLATION OF DOORS, FLOOR FINISHES, AND 1ST FLOOR CEILING SPACE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY … |
| M01423783 ↗ | 3 SAINT MARKS PLACE MANHATTAN | — | Permit Issued | — | 09/24/2026 | Design COSENTINI ASSOCIATES Owner Parkview Financial Contractor TRITON CONSTRUCTION CO., | INTERIOR RENOVAITION OF THE 6TH & 7TH FLOOR PARTITIONS, CEILINGS, DOORS AND FINISHES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCU… |
| M01454680 ↗ | 1849 2 AVENUE MANHATTAN | — | Permit Issued | — | 09/24/2026 | Design HNY CONSULTING ENGINEERS LLC Contractor ADVANCED PLUMBING MECH | HEREWITH FILING FOR INSTALLATION OF NEW GAS LINE TO EXISTING ROOF HVAC UNITS AND NEW KITCHEN APPLIANCES ON THE SUBCELLAR,1ST, 2nd FLOOR AS … |
| M01412791 ↗ | 200 WEST 26 STREET MANHATTAN | Alteration | Permit Issued | 06/30/2026 | 09/24/2026 | Design EMTEC CONSULTANTS Owner Optima Salon Suites Contractor AFFINITY BUILDING SOLUTIO | REMOVE AND INSTALL SPRINKLER HEADS AND RELATED PIPING IN 1ST FLOOR RETAIL SPACE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATI… |
| M00832495 ↗ | 462 1 AVENUE MANHATTAN | Alteration | Permit Issued | 09/07/2023 | 09/24/2026 | Design LAKHANI & JORDAN Contractor ASHLAR MECHANICAL CORP | HEREWITH FILING FOR SPRINKLER MODIFICATIONS AT THE 16TH FLR INFUSION CENTER PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APP… |
| Q01424438 ↗ | 34-15 87 STREET QUEENS | Alteration | Permit Issued | 08/12/2026 | 09/24/2026 | Design Matt K. Lynch Contractor PETER MICELI PLUMBING | REMOVAL, REPLACEMENT, AND INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01244603 ↗ | 18 VESEY STREET MANHATTAN | Alteration CO | Permit Issued | 06/20/2025 | 09/24/2026 | Design ALL CITY ENGINEERING, P.C. Contractor KAJIMA BUILDING & DESIGN | REMOVE AND INSTALL PLUMBING FIXTURES AND COMPONENTS. IN CONJUNCTION WITH ALT-CO #M01244603. WORK ON FLOORS CEL, 02-05, ROF. |
| M01450886 ↗ | 301 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/08/2026 | 09/23/2026 | Owner DAJIA US Contractor SUFFOLK CONSTRUCTION COMP | Herewith filing for construction of temporary field shanties located in the basement as indicated on plans. No change in use, occupancy, or … |
| S01303085 ↗ | 2187 VICTORY BLVD STATEN ISLAND | Alteration | Permit Issued | 12/31/2025 | 09/23/2026 | Design SCOTT HENSON ARCHITECT LLC Contractor NEWMARK SOLUTIONS CORP | HEREWITH FILING FOR EXTERIOR REPAIRS AS PER PLANS. NO CHANGE TO USE, OCCUPANY, OR EGRESS UNDER THIS APPLICATION. |
| B00853920 ↗ | 8 OLD FULTON STREET BROOKLYN | Alteration | Permit Issued | 04/04/2023 | 09/23/2026 | Design CES ENGINEERING LLC Contractor P.S.I. MECHANICAL | HEREWITH FILING FOR PLUMBING MODIFICATIONS IN APARTMENT '1S' PER PLANS. |
| S01158814 ↗ | 88 OLD TOWN ROAD STATEN ISLAND | Alteration | Permit Issued | 01/16/2025 | 09/22/2026 | Design OLA CONSULTING ENGINEERS, PC Contractor ZDG, LLC | HEREWITH FILING PLUMBING MODIFICATIONS IN CONJUNCTION WITH 2ND FLR INTERIOR RENOVATIONS PER PLANS. |
| M01378817 ↗ | 450 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 04/29/2026 | 09/22/2026 | Design BRIAN OKEEFE ARCHITECT PC Contractor NYC DESIGN & RENO LLC | ALTERATION OF SINGLE FLOOR APARTMENT 5B AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY. |
| M01336167 ↗ | 545 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 02/06/2026 | 09/22/2026 | Contractor AFA CONSTRUCTION LLC | MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M01257427 ↗ | 1240 5 AVENUE MANHATTAN | Alteration | Permit Issued | 08/01/2025 | 09/22/2026 | Design OLA CONSULTING ENGINEERS, PC Contractor ZDG, LLC | REMOVAL AND INSTALLATION OF WALLS, DOORS,CEILINGS AND FINISHES AS PER PLANS ON THE MAIN HOSPITAL 3RD FLR WING 'A' PER PLANS. NO CHANGE IN US… |
| M01457702 ↗ | 65 EAST 55 STREET MANHATTAN | — | Permit Issued | — | 09/22/2026 | Contractor BENCHMARK BUILDERS LLC | PARTIAL 6TH FLOOR INTERIOR WORK AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01237498 ↗ | 1240 5 AVENUE MANHATTAN | Alteration | Permit Issued | 07/24/2025 | 09/22/2026 | Design DAL POS ARCHITECTS, LLC Contractor ZDG, LLC | HEREWITH FILING FOR MODIFICATIONS TO THE 106TH STREET ENTRANCE FOR PACE CLINIC PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS A… |
| M01272144 ↗ | 473 5 AVENUE MANHATTAN | Alteration | Permit Issued | 08/27/2025 | 09/21/2026 | Design AMA CONSULTING ENGINEERS, PC Owner RFR REALTY LLC Contractor TRI-STAR CONSTRUCTION CORP | REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES, AND CEILINGS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01443506 ↗ | 241 WEST 57 STREET MANHATTAN | — | Permit Issued | — | 09/18/2026 | Design W.E. III ENGINEERS, PLLC Owner THE MOINIAN GROUP Contractor LCS PLUMBING&CONSULT INC | REMOVE EXISTING PLUMBING FIXTURES AND RELATED PIPING IN 1ST FLOOR RETAIL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01451256 ↗ | 11 WEST 42 STREET MANHATTAN | — | Permit Issued | — | 09/18/2026 | Design POLITI + SIANO ARCHITECTS Contractor EVOS LLC | THE REMOVAL OF NON-STRUCTURAL PARTITIONS, FIXTURES, FINISHES, & APPLIANCES AND THE CONSTRUCTION OF NEW NON-STRUCTURAL PARTITIONS, & INSTALLA… |
| M01368106 ↗ | 2001 BROADWAY MANHATTAN | Alteration | Permit Issued | 03/27/2026 | 09/17/2026 | Contractor KITCHEN EXHAUST SOLUTION | Construction of new mechanical enclosure around mechanical equipment on existing roof. Aluminum enclosure with louvered openings for ventila… |
| M01228320 ↗ | 845 5 AVENUE MANHATTAN | Alteration | Permit Issued | 06/13/2025 | 09/17/2026 | Design CES ENGINEERING LLC Contractor DONATO PLUMBING, INC | HEREWITH FILING FOR PLUMBING MODIFICATIONS TO EXISTING SYSTEM AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| M01290411 ↗ | 17 HUBERT STREET MANHATTAN | Alteration | Permit Issued | 10/06/2025 | 09/17/2026 | Design Of Possible Contractor DEBONO BROS. BUILDERS & D | STOREFRONT RENOVATION; WORK TO INCLUDE REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, DOOR,S AND REPLACEMENT OF EXTERIOR STOREFRONT.NO CHA… |
| M01127304 ↗ | 41 EAST 70TH STREET MANHATTAN | Alteration CO | Permit Issued | 10/25/2024 | 09/17/2026 | Design CES ENGINEERING LLC Contractor TACONIC BUILDERS INC | REMOVE AND INSTALL NEW PLUMBING FIXTURES AND PIPING IN CONJUNCTION WITH ALT-CO #M01127304-I1. WORK ON FLOORS UG, SC1, CEL, 01-06, ROF, OSP. |
| M01454676 ↗ | 512 MADISON AVENUE MANHATTAN | — | Permit Issued | — | 09/17/2026 | Design AMA CONSULTING ENGINEERS, PC Owner RCPI Landmarks LLC Contractor A.W. & S. CONSTRUCTION CO | NEW VAV BALANCING AND CONTROLS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| B01127624 ↗ | 27 STRONG PLACE BROOKLYN | Alteration | Permit Issued | 04/30/2025 | 09/16/2026 | Design KENDALL ENGINEERING PC Contractor IVAN DP CONSTRUCTION LLC | Mechanical as per plans filed herewith. No change to use, egress or occupancy |
| M01228307 ↗ | 845 5 AVENUE MANHATTAN | Alteration | Permit Issued | 06/13/2025 | 09/16/2026 | Design CES ENGINEERING LLC Contractor SWEENEY & CONROY INC | HEREWITH FILING FOR MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS |
| M01228269 ↗ | 845 5 AVENUE MANHATTAN | Alteration | Permit Issued | 06/13/2025 | 09/16/2026 | Design PETER PENNOYER ARCHITECTS Contractor TOMMY CHIU BUILDING CORP | HEREWITH FILING FOR INTERIOR DEMO & FITOUT AND EXTERIOR WORK AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. |
| M01253793 ↗ | 845 5 AVENUE MANHATTAN | Alteration | Permit Issued | 08/06/2025 | 09/15/2026 | Design OLD STRUCTURES ENGINEERING Contractor SWEENEY & CONROY INC | HEREWITH FILING FOR STRUCTURAL MODIFICATIONS ON THE 7TH FLOOR AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. |
| M01393261 ↗ | 455 NORTH END AVENUE MANHATTAN | Alteration | Permit Issued | 06/11/2026 | 09/15/2026 | Contractor SKYLINE RESTORATION INC | Herewith filing for LL11/98 facade repairs and restoration on the north, south, east, west elevations and roof as indicated on plans. No cha… |
| M01341963 ↗ | 1212 AVENUE OF THE AMER MANHATTAN | Alteration CO | Permit Issued | 03/18/2026 | 09/15/2026 | Design MEYERS+ ENGINEERS Owner 5TH MIDTOWN LLC Contractor TRI-STAR CONSTRUCTION CORP | REMOVAL OF SPRINKLER HEADS, INSTALLATIION OF TEMP LOOP AND MODIFICATION TO EXISTING SPRINKLER SYSTEM AND RELATED PIPING AS SHOWN ON DRAWING… |
| B01377675 ↗ | 6224 2 AVENUE BROOKLYN | Alteration | Permit Issued | 06/23/2026 | 09/15/2026 | Design HIGHLAND ASSOCIATES Contractor JRM CONSTRUCTION MGMT LLC | HEREWITH FILING MECHANICAL MODIFICATIONS IN CONJUNCTION W/ INTERIOR 4TH FLR COMMAND CENTER RENOVATIONS PER PLANS. NO CHANGE IN USE, OCCUPANC… |
| M01455184 ↗ | 375 PARK AVENUE MANHATTAN | — | Permit Issued | — | 09/14/2026 | Design Golden Ratio Engineering LLC Owner RFR REALTY LLC Contractor DYNAMIC EVENT GROUP, INC | INSTALLATION OF TEMPORARY VERSALITE PLATFORM SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01442069 ↗ | 23 WEST 18 STREET MANHATTAN | Alteration | Permit Issued | 09/04/2026 | 09/14/2026 | Design SCHNACKEL ENGINEERS Contractor INTERSTATE INTERIORS INC | INTERIOR RENOVATION OF 1ST FLOOR COMMERICAL SPACE AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY |
| B00828224 ↗ | 241 13 STREET BROOKLYN | New Building | Permit Issued | 02/27/2023 | 09/14/2026 | Design JT ENGINEERING, PC Owner 241 13TH STREET LLC Contractor ERIN CONSTRUCTION & DEVELOPMENT | Herewith filing for underpinning of adjoining buildings related to construction of a new four-story plus mezzanine building |
| Q00806670 ↗ | 3-70 BEACH 75 STREET QUEENS | New Building | Permit Issued | 04/06/2023 | 09/10/2026 | Design H3 HARDY COLLABORATION Contractor E.W. HOWELL CO, LLC | INSTALLATION OF CURB CUT ON BEACH 75 STREET. |
| M01399150 ↗ | 20 WEST 64 STREET MANHATTAN | Alteration | Signed-off | 06/12/2026 | 09/10/2026 | Contractor ACTIVE SIGNS INC | Herewith filing for installation of 3 signs (Boulud) as indicated on plans. No change in use, occupancy or egress. |
| M01415584 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 09/01/2026 | 09/09/2026 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor NEWGRANGE CONSTRUCTION CO | HEREWITH FILING GENERAL CONSTRUCTION WORK FOR INTERIOR RENOVATION, NON BEARING PARTITION, FLOORING, CEILING, & MILLWORK. NO CHANGE TO USE OC… |
| M01450241 ↗ | 235 WEST 48 STREET MANHATTAN | — | Permit Issued | — | 09/09/2026 | Design C3D ARCHITECTURE PLLC Contractor AUTHENTIC PLBG CORP | HEREWITH FILING FOR PLUMBING MODIFICATIONS IN UNIT 16C AS PER PLANS.NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01407538 ↗ | 157 WEST 79 STREET MANHATTAN | Alteration | Permit Issued | 08/13/2026 | 09/09/2026 | Design CHARLES MATZ ARCHITECT | HEREWITH FILING INTERIOR RENOVATIONS IN APT 2D PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. |
| M01433300 ↗ | 7 EAST 13 STREET MANHATTAN | Alteration | Filed — no permit on record | 09/08/2026 | — | Design R.J. MCGEE ENGINEERING, PLLC | — |
| M01443968 ↗ | 1199 1 AVENUE MANHATTAN | Alteration | Permit Issued | 08/20/2026 | 09/08/2026 | Design C3D ARCHITECTURE PLLC Contractor VMC PLUMBING & HEATING IN | HEREWITH FILING FOR PLUMBING FIXTURE MODIFICATIONS IN UNIT 8G AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| M01366226 ↗ | 660 JOE DIMAGGIO HIGHWAY MANHATTAN | Alteration | Permit Issued | 03/16/2026 | 09/08/2026 | Design INDUS ENGINEERING PC Contractor CROSSFIELD PLBG.&HTG.CORP | Sprinkler work on 4th and 5th floor as per plans filed herewith. No change in use, egress or occupancy. |
| M01442231 ↗ | 441 NINTH AVENUE MANHATTAN | Alteration | Permit Issued | 08/26/2026 | 09/08/2026 | Design ROBERT DERECTOR ASSOCIATES Contractor STRUCTURE TONE, LLC | REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS, AND RELATED MECHANICAL PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS |
| M01434550 ↗ | 3 SAINT MARKS PLACE MANHATTAN | Alteration | Permit Issued | 07/31/2026 | 09/03/2026 | Owner Parkview Financial Contractor TRITON CONSTRUCTION CO., | FILING HEREWITH ALTERATIONS TO THE EXISTING NEW STEEL FRAMED STRUCTURE. NEW STAIR OPENING IN THE 7TH FLOOR AS SHOWN ON DRAWINGS. NO CHANGE … |
| B01097572 ↗ | 2016 PITKIN AVENUE BROOKLYN | Alteration CO | Permit Issued | 09/11/2024 | 09/03/2026 | Design THORNTONTOMASETTI Contractor COLIN CONSTRUCTION CO.INC | Interior warehouse renovation from manufacturing to storage with the existing building to remain. One curb cut on Pitkin Ave will be reconst… |
| M01384859 ↗ | 920 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 07/06/2026 | 09/03/2026 | Design OFFICE OF JAMES RUDERMAN Contractor JRR CONTRACTING INC | Herewith, filing for structural modifications in the parking garage as per the plans. No change to use occupancy or egress. |
| M01359117 ↗ | 3 SAINT MARKS PLACE MANHATTAN | Alteration | Permit Issued | 03/26/2026 | 09/03/2026 | Owner Met Tower Owner Contractor TRITON CONSTRUCTION CO., | INTERIOR RENOVATION OF LOBBY AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01448375 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Permit Issued | 08/26/2026 | 09/03/2026 | Design C&P DESIGN CONSULTANTS Owner GLYNN GROUP LLC Contractor GLYNN GROUP LLC | REMOVAL OF EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING AS INDICATED ON PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M01392778 ↗ | 4 EAST 70 STREET MANHATTAN | Alteration | Permit Issued | 05/12/2026 | 09/03/2026 | Design RJD ENGINEERING LLC Contractor VELLA INTERIORS INC | removal and installation of non bearing partitions and modification to existing masonry openings at primary facade and new masonry opening a… |
| M01062289 ↗ | 34 EAST 35TH STREET MANHATTAN | New Building | Permit Issued | 06/13/2024 | 09/02/2026 | Contractor CHRISTOPHER B. MESBAH | INSTALLATION TEMP STANDPIPE SYSTEM IN CONJUNCTION WITH NB |
| M01443954 ↗ | 1199 1 AVENUE MANHATTAN | Alteration | Permit Issued | 08/20/2026 | 09/02/2026 | Design C3D ARCHITECTURE PLLC Contractor EMPRISE CONSTRUCTION INC | HEREWITH FILING FOR INTERIOR RENOVATIONS AS PER PLANS IN UNITS 8G AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| M01448864 ↗ | 539 WEST 28 STREET MANHATTAN | Alteration | Filed — no permit on record | 09/02/2026 | — | — | |
| M01368402 ↗ | 33 WHITEHALL STREET MANHATTAN | Alteration | Permit Issued | 08/20/2026 | 09/02/2026 | Design MG ENGINEERING D.P.C. Owner 5TH MIDTOWN LLC Contractor GANNON CONTRACTING LLC | REMOVAL AND INSTALLATION OF PARTITIONS, CEILINGS, DOORS AND FINSHES AS SHOWN ON DRAWINGS. NO CHANG TO USE, EGRESS OR OCCUPANCY. |
| Q01357401 ↗ | 163-02 BAISLEY BOULEVARD QUEENS | New Building | Permit Issued | 04/13/2026 | 09/01/2026 | Design TECTONIC ENGINEERING Owner Tesla Contractor POWERONE ELECTRICAL CONTR | HEREWITH FILING TO ESTABLISH EV CHARGING USE W/ ACCESSORY BLOCKHOUSE AND ASSOCIATED CIVIL SITE WORK PER PLANS. |
| M01254051 ↗ | 235 WEST 48 STREET MANHATTAN | Alteration | Signed-off | 07/30/2025 | 08/31/2026 | Design C3D ARCHITECTURE PLLC Contractor AUTHENTIC PLBG CORP | INTERIOR APARTMENT RENOVATIONS AND PLUMBING MODIFICATIONS ASSOCIATED WITH APARTMENTS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01440680 ↗ | 315 EAST 70 STREET MANHATTAN | Alteration | Permit Issued | 08/13/2026 | 08/31/2026 | Design CARMEN LENZI ARCHITECT Contractor JMS MECHANICAL CORP | Renovation of kitchen including removal and installation of non-bearing partitions and related finishes as per plans filed herewith. No cha… |
| B00977975 ↗ | 269 7 AVENUE BROOKLYN | Alteration | Signed-off | 02/06/2024 | 08/28/2026 | Design LIZARDOS ENGINEERING Owner NEW YORK PRESBYTERIAN Contractor ALLIANCE PLUMBING CORP | HEREWITH FILING FOR PLUMBING MODIFICATIONS IN CONJUNCTION W/ 4TH FLR KIRKWOOD PFT DECANT RENOVATIONS. |
| M01273546 ↗ | 742 5 AVENUE MANHATTAN | Alteration | Permit Issued | 10/03/2025 | 08/28/2026 | Design AVCON ENGINEERING PC Owner MADISON CAPITAL Contractor FOLOR INC | REMOVAL AND INSTALLATION OF DUCTWORK AND DIFFUSERS AS PER PLANS FILED. THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS |
| M01361672 ↗ | 151 EAST 18 STREET MANHATTAN | Alteration | Permit Issued | 06/17/2026 | 08/27/2026 | Design NELSON AND POPE Owner BUCHBINDER & WARREN LLC Contractor POLER CONSTRUCTION INC | STRUCTURAL WORK FILED TO RESOLVE VIOLATIONS V 042009CEX01ADS & V 042009CEX02ADS. NO CHANGE IN USE, OCCUPANY, OR EGRESS |
| M01404391 ↗ | 477 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 08/12/2026 | 08/27/2026 | Owner RFR REALTY LLC Contractor M & S MECHANICAL SERVICES | STRUCTURAL FRAMING FOR NEW ROOFTOP GENERATOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01417325 ↗ | 111 GARDNER AVENUE BROOKLYN | Alteration | Signed-off | 08/04/2026 | 08/26/2026 | Design ARRA ARCHITECTURE Owner AVANT GARDNER LLC Contractor RINALDI ENTERPRISES, LLC | INSTALL GAS HVAC UNIT ON ROOF AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01424600 ↗ | 235 WEST 48 STREET MANHATTAN | Alteration | Permit Issued | 07/24/2026 | 08/26/2026 | Design OFFICE OF JAMES RUDERMAN Contractor JRR CONTRACTING INC | Herewith, filing for structural modifications on the 1st-floor parking garage as per the plans. No change to use occupancy or egress. |
| M01420740 ↗ | 34 HUDSON YARDS MANHATTAN | Alteration | Permit Issued | 07/31/2026 | 08/26/2026 | Design LONDON A+D Contractor FLO RESTORATION INC | Removal and installation of walls, doors, floor finishes and ceilings as per plans. No change to use, occupancy, or egress |
| Q01448540 ↗ | 51-55 59 PLACE QUEENS | Alteration | Filed — no permit on record | 08/25/2026 | — | Design CIVIL DESIGN WORKS LLC | — |
| M01414818 ↗ | 340 EAST 51 STREET MANHATTAN | Alteration | Filed — no permit on record | 08/25/2026 | — | Design GC ENG & ASSOCIATES, PC | — |
| M01427034 ↗ | 722 BROADWAY MANHATTAN | Alteration | Filed — no permit on record | 08/25/2026 | — | Design MG ENGINEERING D.P.C. | — |
| M01436053 ↗ | 56 WEST 11 STREET MANHATTAN | Alteration | Permit Issued | 08/10/2026 | 08/24/2026 | Owner Frame Asset Management Contractor CBB PLUMBING CORP | REMOVAL, RELOCATION, AND INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING, AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01089743 ↗ | 217 WEST 25 STREET MANHATTAN | Alteration | Permit Issued | 08/23/2024 | 08/24/2026 | Design WSP Contractor 4TL CONSTRUCTION LLC | REMOVAL OF AC UNITS, DUCT WORK AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01033942 ↗ | 217 WEST 25 STREET MANHATTAN | Alteration | Permit Issued | 04/24/2024 | 08/24/2026 | Design WSP Contractor 4TL CONSTRUCTION LLC | REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS, AC UNITS AND RELATED MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS… |
| M01394966 ↗ | 434 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/26/2026 | 08/24/2026 | Design AVCON ENGINEERING PC Contractor PRIME CONSTRUCTION MGMT | THIS APPLICATION IS FILED HEREWITH FOR THE INTERIOR RENOVATION OF 434 BROADWAY - 7TH, 8TH, & 9TH FLOORS - INCLUDING THE INSTALLATION OF NON-… |
| S01259443 ↗ | 88 OLD TOWN ROAD STATEN ISLAND | Alteration | Permit Issued | 08/06/2025 | 08/21/2026 | Design OLA CONSULTING ENGINEERS, PC Contractor ZDG, LLC | HEREWITH FILING FOR INSTALLATION OF NEW MED GAS SYSTEM WITH ASSOCIATED PLUMBING PIPING, FIXTURES AND STORAGE TANKS PER PLANS. |
| B01326397 ↗ | 334 ROCKAWAY PARKWAY BROOKLYN | Alteration | Filed — no permit on record | 08/20/2026 | — | — | |
| B01434704 ↗ | 2 PIERREPONT STREET BROOKLYN | Alteration | Filed — no permit on record | 08/19/2026 | — | — | |
| M00677612 ↗ | 349 WEST 48 STREET MANHATTAN | Alteration | Permit Issued | 03/31/2022 | 08/18/2026 | Design HOFFMANN ARCHITECTS, INC. Contractor PARISH PROPERTY MANAGEMEN | Repair and replace stucco, replace skylights, replace lighting, install railing at parapet as per plans filed herewith. No change to use, eg… |
| M01212758 ↗ | 455 NORTH END AVENUE MANHATTAN | Alteration | Permit Issued | 05/05/2025 | 08/18/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor F.L. PINTO COMPANIES LLC | REMOVE AND INSTALL SPRINKLER HEADS AND RELATED PIPING IN CELLAR AND 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01183695 ↗ | 455 NORTH END AVENUE MANHATTAN | Alteration CO | Permit Issued | 02/24/2025 | 08/17/2026 | Design HKS ARCHITECTS PC Contractor F.L. PINTO COMPANIES LLC | CORRECTION TO LAST FINAL CO #101813753 TO REVISE USE AND OCCUPANCY GROUPS ON CELLAR, 1ST AND 2ND FLOORS. RENOVATION OF EXISTING RESIDENTIAL … |
| M01424636 ↗ | 41 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 07/22/2026 | 08/14/2026 | Design C3D ARCHITECTURE PLLC Contractor EMPRISE CONSTRUCTION INC | HEREWITH FILING FOR INTERIOR RENOVATIONS OF UNIT 2D AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| Q01238401 ↗ | 48-26 54TH ROAD QUEENS | Alteration | Permit Issued | 09/16/2025 | 08/14/2026 | Design NANDINEE PHOOKAN ARCHITECTS Owner Tesla, Inc. Contractor CNB CONTRACTING CORP | HEREWITH FILING STRUCTURAL MODIFICATIONS IN CONJUNCTION WITH EV CHARGING STATION AND ACCESSORY BLOCKHOUSE PER PLANS. NO CHANGE IN USE, OCCUP… |
| M01408120 ↗ | 67 WEST 47 STREET MANHATTAN | Alteration | Permit Issued | 07/08/2026 | 08/14/2026 | Design Vincent F. Wolk Owner Valley National Bank Contractor METRO PARTNERS GROUP INC | INTERIOR RENOVATION OF EXISTING FIRST FLOOR COMMERCIAL SPACE APPROX. 3014 SQ FT. AS PER DRAWINGS HEREIN. ELECTRICAL LIGHTING UPDATE ON FIR… |
| M01402861 ↗ | 1500 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/16/2026 | 08/14/2026 | Design CFS ENGINEERING, DPC Contractor WESBUILT CONSTRUCTION MAN | REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES, AND CEILING ON THE 30TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS … |
| M01424643 ↗ | 41 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 07/22/2026 | 08/14/2026 | Design C3D ARCHITECTURE PLLC Contractor VMC PLUMBING & HEATING IN | HEREWITH FILING FOR PLUMBING MODFICATIONS IN UNIT 2D AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| M01418948 ↗ | 154 CHRISTOPHER STREET MANHATTAN | Alteration | Filed — no permit on record | 08/12/2026 | — | Owner ROCKROSE DEVELOPMENT | — |
| M01175764 ↗ | 854 5 AVENUE MANHATTAN | Alteration | Permit Issued | 02/26/2025 | 08/12/2026 | Design PETER PENNOYER ARCHITECTS Contractor JRM CONSTRUCTION MGMT LLC | REMOVE HVAC EQUIPMENT AND PIPING ON FLOORS CEL THROUGH 05. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01440879 ↗ | 1 COLUMBUS CIRCLE MANHATTAN | Alteration | Filed — no permit on record | 08/11/2026 | — | Owner City Dog Ventures, LLC | — |
| B01399529 ↗ | 69 ORANGE STREET BROOKLYN | Alteration | Permit Issued | 05/26/2026 | 08/11/2026 | Design REBECCA BELTON, ARCHITECT Owner R. A. SOMERBY INC. Contractor R.A. SOMERBY INC | Renovation including interior and exterior work, remove and install non load bearing partitions, replace stair, remove radiators and replace… |
| M01206512 ↗ | 881 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/02/2025 | 08/10/2026 | Design JACK GREEN ASSOCIATES Owner WINTER MANAGEMENT CORP. Contractor GJNY.CORP | THIS APPLICATION IS FILED HEREWITH FOR THE INTERIOR RENOVATION OF 115 5TH AVENUE - 4TH FLOOR - INCLUDING THEINSTALLATION OF NON-LOAD BEARING… |
| B00598688 ↗ | 1045 BERGEN STREET BROOKLYN | New Building | Permit Issued | 02/10/2022 | 08/10/2026 | Design MATRIX NEW WORLD ENGINEERING Owner ANCHOR HOUSE INC. Contractor THE J. PILLA GROUP LTD | Structural filing associated with NB |
| M01425717 ↗ | 1133 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 08/07/2026 | 08/07/2026 | Design JACK STONE ENGINEERS, PC Owner THE DURST ORGANIZATION Contractor S. TIEGER PLBG. CO., INC | HEREWITH FILING FOR MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM ON THE 29TH FLOOR AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UN… |
| B01153231 ↗ | 269 7 AVENUE BROOKLYN | Alteration | Permit Issued | 04/28/2025 | 08/07/2026 | Design LIZARDOS ENGINEERING Owner NEW YORK PRESBYTERIAN Contractor HUNTER ROBERTS CONSTRUCTION | HEREWITH FILING SPRINKLER & STANDPIPE MODIFICATIONS AT CARRINGTON SUBCELLAR IN CONJUNCTION WITH EMERGENCY POWER SEPARATION (PHASE 1A) PER PL… |
| M01412941 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/28/2026 | 08/05/2026 | Owner HARBOR GROUP MANAGEMENT Contractor BRICK BY BRICK BUILDERS | SPRINKLER SYSTEM MODIFICATION INCLUDING INSTALLATION OF NEW SPRINKLER HEADS IN THE 6TH FLOOR COMMON AREA AS PER PLANS FILED HEREWITH. NO CHA… |
| M01417137 ↗ | 165 EAST 66TH ST MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 08/04/2026 | Design C3D ARCHITECTURE PLLC Contractor AUTHENTIC PLBG CORP | HEREWITH FILING FOR MODIFICATIONS TO THE PLUMBING FIXTURES IN UNITS 6H AND 15B AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. |
| M01422852 ↗ | 465 WEST 23 STREET MANHATTAN | Alteration | Permit Issued | 07/15/2026 | 08/04/2026 | Owner LONDON TERRACE TOWERS Contractor ORCHESTER MANAGEMENT COM* | removal and installation of non-bearing partitions including relocate kitchen entry, and related finishes as per plans filed herewith. No c… |
| M01425711 ↗ | 1133 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 08/03/2026 | 08/03/2026 | Design JACK STONE ENGINEERS, PC Owner THE DURST ORGANIZATION Contractor CONCEPT CONSTRUCTION SERV | HEREWITH FILING FOR MECHANICAL MODIFICATIONS ON THE 29TH FLOOR AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| M01417119 ↗ | 165 EAST 66TH ST MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 08/03/2026 | Design C3D ARCHITECTURE PLLC Contractor MAGNUS GS INC | HEREWITH FILING FOR INTERIOR RENOVATIONS OF APT 6H AND 15B AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| M01403597 ↗ | 420 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 07/20/2026 | 08/03/2026 | Design GOLDMAN COPELAND ASSOCIATES Owner SL Green Contractor PAR PLUMBING CO., INC | HEREWITH FILING FOR MODIFICATIONS TO THE PLUMBIGN FIXTURES ON THE 4TH FLOOR AS PER PLANS./ NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M01403938 ↗ | 165 EAST 66TH ST MANHATTAN | Alteration | Permit Issued | 07/28/2026 | 08/03/2026 | Design C3D ARCHITECTURE PLLC Contractor AUTHENTIC PLBG CORP | HEREWITH FILING FOR MODIFICATIONS TO THE PLUMBING FIXTURES IN COBNNITATION OF UNITS 20B &21B AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR E… |
| M01425700 ↗ | 1133 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/30/2026 | 08/03/2026 | Design WARE MALCOMB Owner THE DURST ORGANIZATION Contractor CONCEPT CONSTRUCTION SERV | HEREWITH FILING FOR INTERIOR RENOVATIONS ON THE 29TH FLOOR AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. |