| Owner | Filings | Most Recent |
|---|---|---|
| DOUGLAS ELLIMAN PROPERTY MGMT | 70 | 09/30/2026 |
| BROWN HARRIS STEVENS RESIDENTIAL MA | 8 | 09/13/2026 |
| THE DAKOTA, INC | 5 | 03/22/2026 |
| SUTTON PLACE SOUTH CORP-C/OB.H.S. | 1 | 03/22/2026 |
| SUTTON PLACE S.CORP | 1 | 03/22/2026 |
| DOUGLAS ELLIMAN | 1 | 03/21/2026 |
| COLGATE ENTERPRISE | 4 | 03/21/2026 |
| 1 SUTTON PLACE SOUTH | 7 | 03/21/2026 |
| SUTTONPLSO.CORP /ODOUGLASELLIMAN | 2 | 03/21/2026 |
| BROWN HARRIS STEVENS | 6 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| PAUL PERDEK, PROF. ENG. PLLC | 6 | 08/25/2026 |
| ALL CITY ENGINEERING PC | 2 | 07/28/2026 |
| ERIC SHEFFIELD ARCHITECT | 4 | 07/08/2026 |
| P.A. COLLINS PE | 3 | 07/01/2026 |
| GP ARCHITECTS LLC | 1 | 04/24/2026 |
| WEDDLE & GILMORE ARCHITECTS, PLLC | 2 | 04/03/2026 |
| MICHAEL PETERMANN ARCHITECT LLC | 3 | 03/30/2026 |
| CES ENGINEERING LLC | 2 | 10/24/2025 |
| FURMAN & FURMAN ARCHITECTS | 1 | 10/24/2025 |
| J.S. BUILDING CONSULTING LLC. | 1 | 10/17/2025 |
| BW ARCHITECTS | 3 | 08/27/2025 |
| ASHRAF CORP | 7 | 07/31/2024 |
| JOSEPH K. BLUM CO. LLP | 1 | 06/28/2024 |
| RJD ENGINEERING LLC | 6 | 05/23/2024 |
| ALAN WANZENBERG ARCHITECT PC | 2 | 01/19/2024 |
| KENDALL ENGINEERING PC | 3 | 08/25/2023 |
| AWT ARCHITECT, PLLC | 5 | 08/21/2023 |
| ANDREW KATZ ENGINEERS | 3 | 03/14/2023 |
| IP GROUP | 2 | 02/15/2023 |
| WJE ENGINEERS & ARCHITECTS, P.C. | 2 | 03/09/2022 |
| VINCENT J. LIOTTA P.E. | 1 | 12/22/2021 |
| KZ ENGINEERING, P.C | 1 | 07/10/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 12 | 03/21/2026 |
| JM ZONING, LLC. | 6 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 8 | 03/21/2026 |
| Rigid Structural Design, LLC | 7 | 03/21/2026 |
| AE DESIGN SOLUTION | 6 | 03/21/2026 |
| J CALLAHAN CONSULTING | 4 | 03/21/2026 |
| BOYD CONSULTING | 14 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 5 | 03/21/2026 |
| HS DESIGN STUDIO | 4 | 03/21/2026 |
| BURNHAM NATIONWIDE INC | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| V. DISALVO CONTRACTING CO | General Contractor | 23 | 07/08/2026 |
| EMPIRE NY INSTALLATIONS INC | General Contractor | 10 | 09/30/2026 |
| POLER CONTRACTING INC | General Contractor | 5 | 07/08/2026 |
| HUDSON PLMBING & MCH, LLC | Plumbing | 5 | 07/08/2026 |
| CEPRINE CONSTRUCTION INC | General Contractor | 4 | 07/08/2026 |
| FORTE EXPRESS P & H INC | Plumbing | 4 | 07/08/2026 |
| NEW PATH CONTRACTING INC | General Contractor | 4 | 07/08/2026 |
| LICO CONTRACTING INC | General Contractor | 3 | 07/08/2026 |
| MARTANY TILE CORP | General Contractor | 3 | 07/08/2026 |
| EIS ELECTRIC CORP DBA | Electrical | 2 | 03/22/2026 |
| PERFECTAIRE CO INC | General Contractor | 2 | 03/21/2026 |
| DEMARI SERVICES INC | General Contractor | 2 | 03/21/2026 |
| DISALVO CONTRACTING | General Contractor | 2 | 06/28/2026 |
| DP FLYNN PLBG & HTG INC | Plumbing | 2 | 07/08/2026 |
| HI-TECH WIRING ELECL SVCS | Electrical | 2 | 03/22/2026 |
| DELTA-SIGMA MECH CORP | Plumbing | 1 | 07/08/2026 |
| DYNAMIC BLUE WATER MECH | Plumbing | 1 | 07/08/2026 |
| EMERALD MECHL SOLUTIONS I | Plumbing | 1 | 08/26/2026 |
| UNIPIPE PLBG&HTG CORP | Plumbing | 1 | 07/08/2026 |
| AURORA ELECL CONTG INC | Electrical | 1 | 03/22/2026 |
| WALTER J.GRANDE P & H INC | Plumbing | 1 | 07/08/2026 |
| CAMENZULI, CARMINE | Electrical | 1 | 03/21/2026 |
| J.G.C. ELECTRIC, LLC | Electrical | 1 | 03/22/2026 |
| MCGOVERN, THOMAS | Electrical | 1 | 03/21/2026 |
| METROPOLITAN OPERA ASSOCI | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| JD ENGINEERING PC | 9859 | 2 | 07/28/2026 |
| QUALITY TESTING, LLC | 7344 | 6 | 07/01/2026 |
| ERIC SHEFFIELD ARCHITECT | 2195 | 3 | 06/30/2026 |
| SONI ENGINEERING CONSULTI | 9819 | 1 | 05/11/2026 |
| RYAN SPECIAL ENGINEERING | 2018 | 2 | 03/30/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 4 | 10/24/2025 |
| RAD DESIGN & ARCHITECTURE | 2082 | 2 | 08/27/2025 |
| BHK ENGINEERING, D.P.C. | 9589 | 1 | 06/28/2024 |
| CATALPA SPECIAL INSPECTIO | 2004 | 1 | 05/23/2024 |
| MACIA INSPECTION & TESTIN | 402 | 2 | 01/19/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Supported Scaffold | Permit Issued | EMPIRE NY INSTALLATIONS INC | 09/29/2026 |
| DOB NOW | Plumbing | Permit Issued | EMERALD MECHL SOLUTIONS I | 08/17/2026 |
| DOB NOW | General Construction | Signed-off | EUDA CONSTRUCTION & | 07/15/2026 |
| DOB NOW | General Construction | Permit Issued | DISALVO CONTRACTING LLC | 06/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | DISALVO CONTRACTING LLC | 06/26/2026 |
| DOB NOW | General Construction | Permit Issued | ARCHETYPAL IMAGERY CORP | 06/18/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | EMPIRE NY INSTALLATIONS INC | 06/12/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | SKYLINE RESTORATION INC | 05/28/2026 |
| DOB NOW | Plumbing | Permit Issued | HUDSON PLMBING & MCH, LLC | 05/14/2026 |
| DOB NOW | General Construction | Permit Issued | SKYLINE RESTORATION INC | 05/13/2026 |
| DOB NOW | General Construction | Permit Issued | LICO CONTRACTING INC | 04/16/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | LICO CONTRACTING INC | 04/16/2026 |
| DOB NOW | Plumbing | Permit Issued | FORTE EXPRESS P & H INC | 03/25/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | EMPIRE NY INSTALLATIONS I | 03/18/2026 |
| DOB NOW | General Construction | Permit Issued | LICO CONTRACTING INC | 02/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | V. DISALVO CONTRACTING CO | 01/06/2026 |
| DOB NOW | General Construction | Permit Issued | V. DISALVO CONTRACTING CO | 01/05/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | VERTICAL ACCESS LLC | 11/25/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | EMPIRE NY INSTALLATIONS I | 09/25/2025 |
| DOB NOW | Mechanical Systems | Signed-off | V. DISALVO CONTRACTING CO | 07/07/2025 |
| DOB NOW | General Construction | Signed-off | V. DISALVO CONTRACTING CO | 07/03/2025 |
| DOB NOW | Plumbing | Signed-off | HUDSON PLMBING & MCH, LLC | 06/24/2025 |
| DOB NOW | Plumbing | Signed-off | DELTA-SIGMA MECH CORP | 06/06/2025 |
| DOB NOW | Plumbing | Permit Issued | HUDSON PLMBING & MCH, LLC | 05/09/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | EMPIRE NY INSTALLATIONS I | 04/10/2025 |
| DOB NOW | General Construction | Permit Issued | V. DISALVO CONTRACTING CO | 04/01/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | V. DISALVO CONTRACTING CO | 03/31/2025 |
| DOB NOW | Structural | Signed-off | V. DISALVO CONTRACTING CO | 03/21/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | EMPIRE NY INSTALLATIONS I | 10/28/2024 |
| DOB NOW | General Construction | Signed-off | DEMARI SERVICES INC | 10/10/2024 |
| DOB NOW | Mechanical Systems | Signed-off | V. DISALVO CONTRACTING CO | 07/31/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | IGH RESTORATION LLC | 07/17/2024 |
| DOB NOW | General Construction | Signed-off | V. DISALVO CONTRACTING CO | 07/16/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | INTERSYSTEMS INSTAL S&S | 06/27/2024 |
| DOB NOW | Plumbing | Signed-off | HUDSON PLMBING & MCH, LLC | 06/11/2024 |
| DOB NOW | Plumbing | Permit Issued | HUDSON PLMBING & MCH, LLC | 05/06/2024 |
| DOB NOW | General Construction | Permit Issued | V. DISALVO CONTRACTING CO | 05/01/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | V. DISALVO CONTRACTING CO | 04/28/2024 |
| DOB NOW | General Construction | Signed-off | V. DISALVO CONTRACTING CO | 03/25/2024 |
| DOB NOW | Mechanical Systems | Signed-off | V. DISALVO CONTRACTING CO | 03/19/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/24/2025 | Permit Issued | LICO CONTRACTING INC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Daikin FXTA24AAVJUA 24,000 BTU · Vrf Indoor ×2 FXTA12AAVJUA 12,000 BTU · Vrf Indoor ×1 FXTA18AAVJUA 18,000 BTU · Vrf Indoor ×1 FXTA30AAVJUA 30,000 BTU · Vrf Indoor ×1 FXTA48AAVJUA 48,000 BTU · Vrf Indoor ×1 REYA144AATJA 138,000 BTU · Vrf Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/01/2026 | — | — | 1 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/28/2026 | Permit Issued | EMERALD MECHL SOLUTIONS I | Gas, Water/Sanitary |
| 07/01/2026 | Permit Issued | GOLDS PLUMBING CORP | Gas, Water/Sanitary |
| 10/24/2025 | Permit Issued | FORTE EXPRESS P & H INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/17/2026 | Permit Issued | FINESSE ELECTRIC LLC | General Wiring |
| 04/15/2026 | Permit Issued | WARREN OSTROFF ELEC., INC | — |
| 04/15/2026 | Permit Issued | WARREN OSTROFF ELEC., INC | General Wiring |
| 01/21/2026 | Permit Issued | HI-TECH WIRING ELECL SVCS | General Wiring |
| 04/02/2025 | Permit Issued | MEGA ELEC'L CONTR'G, INC | — |
| 09/09/2024 | Complete | V.R. ELECTRICAL CORP | General Wiring |
| 06/27/2024 | Permit Issued | AURORA ELECL CONTG INC | — |
| 05/06/2024 | Permit Issued | HI-TECH WIRING ELECL SVCS | General Wiring |
| 01/02/2024 | Complete | HI-TECH WIRING ELECL SVCS | General Wiring |
| 12/07/2023 | Complete | J.G.C. ELECTRIC, LLC | General Wiring |
| 12/07/2023 | Complete | J.G.C. ELECTRIC, LLC | — |
| 11/29/2023 | Complete | EIS ELECTRIC CORP DBA | General Wiring |
| 11/28/2023 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| 09/06/2023 | Complete | V.R. ELECTRICAL CORP | General Wiring |
| 05/15/2023 | Permit Issued | AUR0RA ELECL CONTG INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/09/2022 | Permit Issued | POLER CONTRACTING INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | EMPIRE NY INSTALLATIONS I | Sidewalk Shed |
| 04/30/2026 | Permit Issued | EMPIRE NY INSTALLATIONS I | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/11/2026 | Permit Issued | SKYLINE RESTORATION INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/11/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/30/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/10/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/10/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/05/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/24/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/21/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/25/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/16/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/22/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/26/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/10/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/25/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/23/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/24/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/22/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/16/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/30/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/29/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/29/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/29/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/11/2026 | Fire-Resistant Penetrations and Joints | Zhao Deng | special |
| 08/11/2026 | Tenant Protection Plan Compliance | Zhao Deng | special |
| 07/31/2026 | Fire-Resistant Penetrations and Joints | KEVIN SNEDEKER | special |
| 07/14/2026 | Fire-Resistance Rated Construction | Eric Sheffield | progress |
| 07/14/2026 | Fire-Resistant Penetrations and Joints | Eric Sheffield | special |
| 07/14/2026 | Final | Eric Sheffield | progress |
| 07/07/2026 | Fire-Resistance Rated Construction | — | progress |
| 07/07/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/07/2026 | Final | — | progress |
| 07/01/2026 | Tenant Protection Plan Compliance | Zhao Deng | special |
| 07/01/2026 | Fire-Resistant Penetrations and Joints | Zhao Deng | special |
| 05/11/2026 | Alternative Materials - OTCR Buildings Bulletin Number | nayan soni | special |
| 05/11/2026 | Post-installed Anchors | nayan soni | special |
| 04/27/2026 | Energy Code Compliance Inspections | KEVIN SNEDEKER | progress |
| 04/27/2026 | Final | KEVIN SNEDEKER | progress |
| 04/27/2026 | Fire-Resistance Rated Construction | KEVIN SNEDEKER | progress |
| 04/27/2026 | Fire-Resistant Penetrations and Joints | KEVIN SNEDEKER | special |
| 04/27/2026 | Lighting in dwelling units | KEVIN SNEDEKER | energy_progress |
| 03/23/2026 | Fire-Resistant Penetrations and Joints | KEVIN SNEDEKER | special |
| 03/05/2026 | Tenant Protection Plan Compliance | William Ryan | special |
| 03/05/2026 | Final | MICHAEL PETERMANN | progress |
| 11/20/2025 | Fire-Resistant Penetrations and Joints | Radoslaw Kurek | special |
| 10/17/2025 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 09/19/2025 | Post-installed Anchors | Young Suh | special |
| 09/19/2025 | Fire-Resistance Rated Construction | Young Suh | progress |